# US 2025/0158404 A1 · Power management system and power management method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158404 A1
- Document ID: US20250158404A1
- Status: Published application
- Kind: A1
- Application number: 19/024,623
- Filed: 2025-01-16
- Published: 2025-05-15
- Earliest claimed: 2022-11-01
- Assignees: Mitsubishi Electric Corporation
- Applicants: Mitsubishi Electric Corporation
- Inventors: Fuyuki SATO; Hiroki KAWANO
- Web page: https://patentgrep.com/patent/US20250158404A1

## CPC

- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/17: Demand-responsive operation of AC power transmission or distribution networks
- H02J 13/00: Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J 2105/42: Home appliances
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

In demand control, a processor executes a normal operation of an electrical device from a start point of a demand interval. Based on a temporal change in a power consumption integrated value in execution of the normal operation, the processor determines whether or not comfort for a user in a consumer facility has been restored. From a time at which the comfort has been restored, the processor sets an execution time period of the normal operation so as to ensure a time period necessary for calculating a baseline, the baseline being a prediction value of the power consumption integrated value for a case where the normal operation is executed for an entire time period of the demand interval. When the baseline exceeds the target power by an end point of the demand interval, the processor shifts the normal operation to an energy-saving operation.

## Claims

### Claim 1

A power management system that manages power consumption in a consumer facility, the power management system comprising:
a processor;
a memory to store a program executed by the processor; and
a power meter to measure power consumption in an entirety of the consumer facility, wherein
according to the program, the processor is configured to
calculate a power consumption integrated value in a demand interval based on a measurement value of the power meter, and
execute demand control for controlling an electrical device in the consumer facility such that the power consumption integrated value in the demand interval does not exceed target power, and
in the demand control, the processor
executes a normal operation of the electrical device from a start point of the demand interval,
based on a temporal change in the power consumption integrated value in execution of the normal operation, determines whether or not comfort for a user of the consumer facility has been restored,
from a time at which the comfort has been restored, sets an execution time period of the normal operation so as to ensure a time period necessary for calculating a baseline, the baseline being a prediction value of the power consumption integrated value for a case where the normal operation is executed for an entire time period of the demand interval, and
when the baseline exceeds the target power by an end point of the demand interval, shifts the normal operation to an energy-saving operation in which the power consumption by the electrical device is more suppressed than in the normal operation.

### Claim 2 (depends on 1)

The power management system according to claim 1, wherein the processor determines that the comfort has been restored when the temporal change in the power consumption integrated value in execution of the normal operation becomes gradual.

### Claim 3 (depends on 1)

The power management system according to claim 1, wherein the processor calculates the baseline based on the power consumption integrated value in execution of the normal operation at and after a time at which the comfort has been restored.

### Claim 4 (depends on 1)

The power management system according to claim 1, wherein
during execution of the normal operation, at each sampling timing of the power meter, the processor calculates a prediction value of the power consumption integrated value for a case where the energy-saving operation is executed at and after a current time, based on a temporal change in the power consumption integrated value in execution of the energy-saving operation within a previous demand interval, and
the processor limits the execution time period of the normal operation by shifting the normal operation to the energy-saving operation when the prediction value exceeds the target power by the end point of the demand interval.

### Claim 5 (depends on 4)

The power management system according to claim 4, wherein
at the start point of the demand interval, based on the temporal change in the power consumption integrated value in execution of the energy-saving operation within the previous demand interval, the processor calculates a prediction value of the power consumption integrated value for a case where the energy-saving operation is executed for the entire time period of the demand interval, and
the processor sets the execution time period of the normal operation at zero when the prediction value exceeds the target power by the end point of the demand interval.

### Claim 6 (depends on 4)

The power management system according to claim 4, wherein
the processor calculates a slope ratio based on the power consumption integrated value in a past demand interval, the slope ratio being a ratio between a temporal change rate of the power consumption integrated value in execution of the normal operation and a temporal change rate of the power consumption integrated value in execution of the energy-saving operation,
when the execution time period of the normal operation in a current demand interval is limited, the processor calculates the baseline by multiplying the temporal change rate of the power consumption integrated value in execution of the energy-saving operation by the slope ratio, and
the processor calculates an amount of power reduction resulting from execution of the demand control by subtracting the power consumption integrated value at the end point of the demand interval on the baseline from the prediction value at the end point.

### Claim 7 (depends on 4)

The power management system according to claim 4, wherein
from power consumption data in a past demand interval, the processor calculates an average value for the execution time period of the normal operation for restoring the comfort and an average value for a temporal change rate of the power consumption integrated value,
during execution of the energy-saving operation, with use of the calculated average values, the processor calculates a prediction value of the power consumption integrated value for a case where the normal operation is executed in a remaining time period within a current demand interval, and
the processor shifts the energy-saving operation to the normal operation when the prediction value in the remaining time period does not exceed the target power.

### Claim 8 (depends on 7)

The power management system according to claim 7, wherein the processor continues to execute the energy-saving operation when the prediction value in the remaining time period exceeds the target power.

### Claim 9

A power management method of managing power consumption in a consumer facility, the power management method comprising:
calculating a power consumption integrated value in a demand interval based on a measurement value of a power meter that measures power consumption in an entirety of the consumer facility; and
executing demand control for controlling an electrical device in the consumer facility such that the power consumption integrated value in the demand interval does not exceed target power, wherein
the executing demand control includes
executing a normal operation of the electrical device from a start point of the demand interval,
based on a temporal change in the power consumption integrated value in execution of the normal operation, determining whether or not comfort for a user of the consumer facility has been restored,
from a time at which the comfort has been restored, setting an execution time period of the normal operation so as to ensure a time period necessary for calculating a baseline, the baseline being a prediction value of the power consumption integrated value for a case where the normal operation is executed for an entire time period of the demand interval, and
when the baseline exceeds the target power by an end point of the demand interval, shifting the normal operation to an energy-saving operation in which the power consumption by the electrical device is more suppressed than in the normal operation.

### Claim 10 (depends on 9)

The power management method according to claim 9, wherein the determining includes determining that the comfort has been restored when the temporal change in the power consumption integrated value in execution of the normal operation becomes gradual.

### Claim 11 (depends on 9)

The power management method according to claim 9, wherein the shifting includes calculating the baseline based on the power consumption integrated value in execution of the normal operation at and after a time at which the comfort has been restored.

### Claim 12 (depends on 9)

The power management method according to claim 9, wherein
the executing demand control includes
during execution of the normal operation, at each sampling timing of the power meter, calculating a prediction value of the power consumption integrated value for a case where the energy-saving operation is executed at and after a current time, based on a temporal change in the power consumption integrated value in execution of the energy-saving operation within a previous demand interval, and
limiting the execution time period of the normal operation by shifting the normal operation to the energy-saving operation when the prediction value exceeds the target power by the end point of the demand interval.

### Claim 13 (depends on 12)

The power management method according to claim 12, wherein
the calculating includes, at the start point of the demand interval, based on the temporal change in the power consumption integrated value in execution of the energy-saving operation within the previous demand interval, calculating a prediction value of the power consumption integrated value for a case where the energy-saving operation is executed for the entire time period of the demand interval, and
the limiting includes setting the execution time period of the normal operation at zero when the prediction value exceeds the target power by the end point of the demand interval.

### Claim 14 (depends on 12)

The power management method according to claim 12, wherein
the executing demand control includes
calculating a slope ratio based on the power consumption integrated value in a past demand interval, the slope ratio being a ratio between a temporal change rate of the power consumption integrated value in execution of the normal operation and a temporal change rate of the power consumption integrated value in execution of the energy-saving operation,
when the execution time period of the normal operation in a current demand interval is limited, calculating the baseline by multiplying the temporal change rate of the power consumption integrated value in execution of the energy-saving operation by the slope ratio, and
calculating an amount of power reduction resulting from execution of the demand control by subtracting the power consumption integrated value at the end point of the demand interval on the baseline from the prediction value at the end point.

### Claim 15 (depends on 12)

The power management method according to claim 12, wherein
the executing demand control includes
from power consumption data in a past demand interval, calculating an average value for the execution time period of the normal operation for restoring the comfort for the user in the consumer facility and an average value for a temporal change rate of the power consumption integrated value,
during execution of the energy-saving operation, with use of the calculated average values, calculating a prediction value of the power consumption integrated value for a case where the normal operation is executed in a remaining time period within a current demand interval, and
shifting the energy-saving operation to the normal operation when the prediction value in the remaining time period does not exceed the target power.

### Claim 16 (depends on 15)

The power management method according to claim 15, wherein the executing demand control further includes continuing to execute the energy-saving operation when the prediction value in the remaining time period exceeds the target power.
