# US 2025/0158398 A1 · Distance-to-fault power outage notification

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158398 A1
- Document ID: US20250158398A1
- Status: Published application
- Kind: A1
- Application number: 18/745,570
- Filed: 2024-06-17
- Published: 2025-05-15
- Earliest claimed: 2021-06-15
- Assignees: Utilidata, Inc.
- Applicants: Utilidata, Inc.
- Inventors: Taylor Spalt; Ning Li; Marissa Hummon
- Web page: https://patentgrep.com/patent/US20250158398A1

## CPC

- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- G01R 19/2513: {Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging}
- G01R 22/10: using digital techniques
- G01R 31/085: {in power transmission or distribution lines, e.g. overhead}
- G01R 31/086: {in power transmission or distribution networks, i.e. with interconnected conductors}
- G01R 31/088: {Aspects of digital computing}
- G08B 21/182: {Level alarms, e.g. alarms responsive to variables exceeding a threshold}
- G08B 21/185: {Electrical failure alarms}
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G08B: SIGNALLING SYSTEMS, e.g. PERSONAL CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS

## Abstract

Systems and methods comprising a metering device located on an electricity distribution grid, the metering device comprising one or more processors and memory. The metering device can detect a drop in characteristic of electricity below a threshold indicating a fault on the electricity distribution grid. The metering device can generate, responsive to the drop in the characteristic of electricity below the threshold, a time series of a rate of change of the characteristic of electricity for a predetermined number of cycles subsequent to the detection of the drop. The metering device can determine, based on a comparison of the time series of the rate of change with a predetermined pattern, a location of the metering device on the electricity distribution grid relative to a location of the fault on the electricity distribution grid.

## Claims

### Claim 1

A method, comprising:
detecting, by a metering device located on an electricity distribution grid, a drop in characteristic of electricity below a threshold indicating a fault on the electricity distribution grid;
generating, by the metering device responsive to the drop in the characteristic of electricity below the threshold, a time series of a rate of change of the characteristic of electricity for a predetermined number of cycles subsequent to the detection of the drop; and
determining, by at least one of the metering device or one or more processors in communication with the metering device, based on a comparison of the time series of the rate of change with a predetermined pattern, a location of the metering device on the electricity distribution grid relative to a location of the fault on the electricity distribution grid.

### Claim 2 (depends on 1)

The method of claim 1, wherein the characteristic of electricity corresponds to a characteristic of voltage measured by the metering device.

### Claim 3 (depends on 1)

The method of claim 1, wherein the characteristic of electricity corresponds to a characteristic of current measured by the metering device.

### Claim 4 (depends on 1)

The method of claim 1, comprising:
triggering, by the metering device, responsive to the detected drop in the characteristic of electricity, a power outage notification (PON); and
generating, by the metering device, responsive to the triggered PON, the time series of the rate of change of the characteristic of electricity for the predetermined number of cycles.

### Claim 5 (depends on 1)

The method of claim 1, comprising:
determining, by the metering device, the rate of change of the characteristic of electricity based on a derivative in time of a root mean square (RMS) of one of a voltage signal or a current signal.

### Claim 6 (depends on 1)

The method of claim 1, wherein the predetermined pattern comprises at least an incline slope and a decline slope, wherein a declination of the decline slope is greater than an inclination of the incline slope.

### Claim 7 (depends on 6)

The method of claim 6, comprising:
determining, by the metering device, that the location of the metering device is downstream a first subset of metering devices and upstream a second subset of metering devices based on the predetermined pattern, wherein the incline slope is associated with the first subset of metering devices upstream of the location of the metering device, and wherein the decline slope is associated with the second subset of metering devices downstream of the location of the metering device.

### Claim 8 (depends on 1)

The method of claim 1, wherein the electricity distribution grid comprises a second metering device located at a different location from the metering device, comprising:
detecting, by the second metering device, a second drop in the characteristic of electricity below the threshold indicating the fault on the electricity distribution grid;
generating, by the second metering device responsive to the second drop in the characteristic of electricity below the threshold, a second time series of a second rate of change of the characteristic of electricity for the predetermined number of cycles subsequent to the detection of the second drop; and
determining, by the second metering device, based on a second comparison of the second time series of the second rate of change with the predetermined pattern, a location of the second metering device on the electricity distribution grid relative to the location of the fault on the electricity distribution grid.

### Claim 9 (depends on 1)

The method of claim 1, comprising:
providing, by the metering device, via a network, an indication of the location of at least one of the second metering device or the fault on the electricity distribution grid to a computing system comprising one or more processors coupled to memory.

### Claim 10 (depends on 1)

The method of claim 1, comprising:
receiving, by a computing system, a plurality of time series of rates of change generated by a plurality of metering devices located on the electricity distribution grid responsive to drops in characteristics of electricity;
normalizing, by the computing system, values of the plurality of time series;
determining, by the computing system, based on the normalized values of the plurality of time series, a likelihood of fault location at each of the plurality of metering devices; and
determining, by the computing system, that the fault is upstream of a first metering device and downstream of a second metering device based on the likelihood.

### Claim 11

A system, comprising:
a metering device located on an electricity distribution grid, the metering device comprising one or more processors and memory, configured to:
detect a drop in characteristic of electricity below a threshold indicating a fault on the electricity distribution grid;
generate, responsive to the drop in the characteristic of electricity below the threshold, a time series of a rate of change of the characteristic of electricity for a predetermined number of cycles subsequent to the detection of the drop; and
determine, based on a comparison of the time series of the rate of change with a predetermined pattern, a location of the metering device on the electricity distribution grid relative to a location of the fault on the electricity distribution grid.

### Claim 12 (depends on 11)

The system of claim 11, wherein the characteristic of electricity corresponds to a characteristic of voltage measured by the metering device.

### Claim 13 (depends on 11)

The system of claim 11, wherein the characteristic of electricity corresponds to a characteristic of current measured by the metering device.

### Claim 14 (depends on 11)

The system of claim 11, wherein the metering device is configured to:
trigger, responsive to the detected drop in the characteristic of electricity, a power outage notification (PON); and
generate, responsive to the triggered PON, the time series of the rate of change of the characteristic of electricity for the predetermined number of cycles.

### Claim 15 (depends on 11)

The system of claim 11, wherein the metering device is configured to:
determine, the rate of change of the characteristic of electricity based on a derivative in time of a root mean square (RMS) of one of a voltage signal or a current signal.

### Claim 16 (depends on 11)

The system of claim 11, wherein the predetermined pattern comprises at least an incline slope and a decline slope, wherein a declination of the decline slope is greater than an inclination of the incline slope.

### Claim 17 (depends on 16)

The system of claim 16, wherein the metering device is configured to:
determine that the location of the metering device is downstream a first subset of metering devices and upstream a second subset of metering devices based on the predetermined pattern, wherein the incline slope is associated with the first subset of metering devices upstream of the location of the metering device, and wherein the decline slope is associated with the second metering device downstream of the location of the metering device.

### Claim 18 (depends on 11)

The system of claim 11, wherein the electricity distribution grid comprises a second metering device located at a different location from the metering device, the second metering device configured to:
detect a second drop in the characteristic of electricity below the threshold indicating the fault on the electricity distribution grid;
generate, responsive to the second drop in the characteristic of electricity below the threshold, a second time series of a second rate of change of the characteristic of electricity for the predetermined number of cycles subsequent to the detection of the second drop; and
determine, based on a second comparison of the second time series of the second rate of change with the predetermined pattern, a location of the second metering device on the electricity distribution grid relative to the location of the fault on the electricity distribution grid.

### Claim 19

A non-transitory computer readable storage medium storing instructions that, when executed by one or more processors of a computing system, cause the one or more processors to:
receive a plurality of time series of rates of change generated by a plurality of metering devices located on an electricity distribution grid responsive to drops in characteristics of electricity;
normalize values of the plurality of time series;
determine, based on the normalized values of the plurality of time series, a likelihood of fault location at each of the plurality of metering devices;
determine that a fault is upstream of a first metering device and downstream of a second metering device based on the likelihood; and
provide, responsive to the determination, an indication of a location of the fault upstream of the first metering device and downstream of the second metering device.

### Claim 20 (depends on 19)

The non-transitory computer readable storage medium of claim 19, wherein to provide the indication comprises instructions to provide the indication of the location of the fault to a device remote from the computing system to facilitate repair of the fault.