# US 2025/0156220 A1 · Priorization of dependent tasks based on error rates

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0156220 A1
- Document ID: US20250156220A1
- Status: Published application
- Kind: A1
- Application number: 18/544,660
- Filed: 2023-12-19
- Published: 2025-05-15
- Earliest claimed: 2023-11-15
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Nestor Acuna Blanco; Radu Marinescu
- Web page: https://patentgrep.com/patent/US20250156220A1

## CPC

- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 11/36: Prevention of errors by analysis, debugging or testing of software
- G06F 11/3684: {for test design, e.g. generating new test cases}
- G06F 11/3688: {for test execution, e.g. scheduling of test suites}
- G06F 11/3692: {for test results analysis}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method for dependent task prioritization is disclosed. The method comprises providing base data comprising task identifiers, failure values and dependency data values, where each dependency data value is associated with a pair of tasks. The method comprises also generating a probabilistic model, using a directed acyclic graph, where each task is associated with a network node, and where each dependency data value is associated with a network edge of the directed acyclic graph, wherein each dependency data value is indicative of a conditional probability in relation to the respective failure rate per time unit. Additionally, the method comprises determining for each task in the acyclic directed graph a posterior marginal probability value indicative of a probability of a failure of the task, and selecting, based upon the posterior marginal probability values, a sequence of tasks that is likely to fail fastest.

## Claims

### Claim 1

A computer-implemented method for dependent task prioritization, said method comprising:
providing base data comprising:
task identifiers, wherein each task identifier is indicative of a respective task;
failure values, wherein each failure value is indicative of a failure rate per time unit of a respective task; and
dependency data values wherein each dependency data value is associated with a pair of tasks;
generating, from said base data, a probabilistic model, wherein said tasks and related dependency data values are associated with a directed acyclic graph, and wherein each task is associated with a network node of said directed acyclic graph, and wherein each dependency data value is associated with a network edge of said directed acyclic graph, wherein each dependency data value is indicative of a conditional probability in relation to said respective failure rate per time unit;
determining for each task in said acyclic directed graph a posterior marginal probability value indicative of a probability of failure of said task; and
selecting, based upon said posterior marginal probability values, a sequence of tasks that is likely to fail fastest.

### Claim 2 (depends on 1)

The method according to claim 1, wherein said selecting said sequence of said tasks that is likely to fail fastest comprises:
selecting the sequence of said set of tasks having said highest sum of incremental failure probabilities between neighboring tasks.

### Claim 3 (depends on 1)

The method according to claim 1, wherein said tasks are test tasks for a system under test.

### Claim 4 (depends on 1)

The method according to claim 1, further comprising:
wherein said tasks are project tasks; and
wherein said failure rate per time unit is a risk value of a respective project task.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising:
wherein said task is a service of a boot process of an operating system comprising a plurality of services, and
wherein said failure rate per time unit represents a probability for failure to complete said service.

### Claim 6 (depends on 1)

The method according to claim 1, wherein said acyclic directed graph is a Bayesian network graph.

### Claim 7 (depends on 6)

The method according to claim 6, further comprising:
building a search tree based on said acyclic directed graph.

### Claim 8 (depends on 7)

The method according to claim 7, further comprising:
filtering branches of said directed acyclic graph using a Breadth-First-Search technique.

### Claim 9 (depends on 7)

The method according to claim 7, wherein said building said search tree is using a k-nearest-neighbor technique.

### Claim 10 (depends on 1)

The method according to claim 1, further comprising:
creating for each node of said acyclic directed graph a conditional probability table using failure rate per time unit values.

### Claim 11

A dependent task prioritization for dependent task prioritization, said system comprising:
one or more processors and a memory operatively coupled to said one or more processors, wherein said memory stores program code portions which, when executed by said one or more processors, enable said one or more processors to:
provide base data comprising:
task identifiers, wherein each task identifier is indicative of a respective task;
failure values, wherein each failure value is indicative of a failure rate per time unit of a respective task; and
dependency data values wherein each dependency data value is associated with a pair of tasks;
generate, from said base data, a probabilistic model, wherein said tasks and related dependency data values are associated with a directed acyclic graph, and wherein each task is associated with a network node of said directed acyclic graph, and wherein each dependency data value is associated with a network edge of said directed acyclic graph, wherein each dependency data value is indicative of a conditional probability in relation to said respective failure rate per time unit;
determine for each task in said acyclic directed graph a posterior marginal probability value indicative of a probability of failure of said task; and
select, based upon said posterior marginal probability values, a sequence of tasks that is likely to fail fastest.

### Claim 12 (depends on 11)

The system according to claim 11, wherein said select said sequence of said tasks that is likely to fail fastest comprises:
selecting said sequence of said set of tasks having said highest sum of incremented failure probabilities between neighboring tasks.

### Claim 13 (depends on 11)

The system according to claim 11, wherein said tasks are test tasks for a system under test.

### Claim 14 (depends on 11)

The system according to claim 11, wherein said tasks are project tasks, and wherein said failure rate per time unit is a risk value of a respective project task.

### Claim 15 (depends on 11)

The system according to claim 11, further comprising:
wherein said task is a service of a boot process of an operating system comprising a plurality of services; and
wherein said failure rate per time unit represents a probability for failure to complete said service.

### Claim 16 (depends on 11)

The system according to claim 11, wherein said acyclic directed graph is a Bayesian network graph.

### Claim 17 (depends on 16)

The system according to claim 16, further comprising:
building a search tree based on said acyclic directed graph.

### Claim 18 (depends on 17)

The system according to claim 17, further comprising:
filtering branches of said directed acyclic graph using said Breadth-First-Search technique.

### Claim 19 (depends on 11)

The system according to claim 11, further comprising:
creating for each node of said acyclic directed graph a conditional probability table using failure rate per time unit values.

### Claim 20

A computer program product for dependent task prioritization, said computer program product comprising a computer readable storage medium having program instructions embodied therewith, said program instructions being executable by one or more computing systems or controllers to cause said one or more computing systems to:
provide base data comprising:
task identifiers, wherein each task identifier is indicative of a respective task;
failure values, wherein each failure value is indicative of a failure rate per time unit of a respective task; and
dependency data values wherein each dependency data value is associated with a pair of tasks;
generate, from said base data, a probabilistic model, wherein said tasks and related dependency data values are associated with a directed acyclic graph, and wherein each task is associated with a network node of said directed acyclic graph, and wherein each dependency data value is associated with a network edge of said directed acyclic graph, wherein each dependency data value is indicative of a conditional probability in relation to said respective failure rate per time unit;
determine for each task in said acyclic directed graph a posterior marginal probability value indicative of a probability of failure of said task; and
select, based upon said posterior marginal probability values, a sequence of tasks that is likely to fail fastest.