# US 2025/0155174 A1 · Defrost system for a conditioned space

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0155174 A1
- Document ID: US20250155174A1
- Status: Published application
- Kind: A1
- Application number: 18/505,406
- Filed: 2023-11-09
- Published: 2025-05-15
- Earliest claimed: 2023-11-09
- Applicants: Tippmann Engineering, LLC
- Inventors: Daniel J. Tippmann; Robert T. Tippmann, III
- Web page: https://patentgrep.com/patent/US20250155174A1

## CPC

- F25B 47/022: {hot gas defrosting}
- F25D 21/006: {with electronic control circuits}
- F25D 21/08: by electric heating
- F25B 41/22: between evaporator and compressor
- F25B 2500/13: Vibrations
- F25B 2700/2117: of an evaporator
- F25B 2700/21172: at the inlet
- F25B 2700/21173: at the outlet
- F25B: REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25D: REFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR (refrigerated showcases A47F3/04; thermally-insulated vessels for domestic use A47J41/00; refrigerated vehicles, see the appropriate subclasses of classes B60 - B64; containers with thermal insulation in general B65D81/38; heat-transfer, heat-exchange or heat-storage materials, e.g. refrigerants, or materials for the production of heat or cold by chemical reactions other than by combustion C09K5/00; thermally-insulated vessels for liquefied or solidified gases F17C; air-conditioning or air-humidification F24F; refrigeration machines, plants, or systems F25B; cooling of instruments or comparable apparatus without refrigeration G12B)

## Abstract

A defrost system for a vapor-compression based refrigerator/freezer combines increased operational efficiency with a high likelihood of robust adoption by technical and business personnel. The system includes a controller programmed to monitors and reports several key performance indicators on each evaporator of the system, and to provide reliable, repeatable “initiate defrost” and “terminate defrost” signals which may prompt actions by an operator or automatically control system components. The controller is designed to provide accurate and efficient defrosting signals regardless of the style of evaporator used, the location of the evaporator and other conditions including pull-down, high traffic locations and operations, and low use periods such as weekends.

## Claims

### Claim 1

A defrost system comprising:
a vapor compression system including a compressor, a condenser, an expansion valve, an evaporator, and a quantity of refrigerant;
a defrost heater operably connected to the evaporator and configured to melt accumulated ice or frost from coils of the evaporator upon activation;
a plurality of sensors operable to gather signals indicative of a need for a defrost cycle, the sensors including an air temperature sensor in fluid communication with an airflow pathway over the coils, a surface temperature sensor operably coupled to the coils, an electrical current sensor, or a combination thereof; and
a controller programmed to:
receive the signals from the plurality of sensors;
process the signals to determine whether a defrost cycle is needed; and
upon determination that the defrost cycle is needed, initiate the defrost cycle via control over at least one component of the vapor compression system.

### Claim 2 (depends on 1)

The defrost system of claim 1, wherein the controller is further programmed to:
process the signals to determine whether the defrost cycle is complete; and
upon determination that the defrost cycle is complete, terminate the defrost cycle via control over the at least one component of the vapor compression system.

### Claim 3 (depends on 1)

The defrost system of claim 1, wherein initiating the defrost cycle comprises issuing a notification to a user to initiate the defrost cycle.

### Claim 4 (depends on 1)

The defrost system of claim 1, wherein initiating the defrost cycle comprises:
deactivating the compressor; and
activating the defrost heater.

### Claim 5 (depends on 1)

The defrost system of claim 1, further comprising:
an upstream temperature sensor operably connected to the controller and located at an air supply of the evaporator, upstream of an airflow path through the evaporator, and
a downstream temperature sensor operably connected to the controller and located at an air return of the evaporator, downstream of the airflow path through the evaporator,
the controller programmed to:
determine a frost-free temperature differential between the upstream temperature sensor and the downstream temperature sensor when the evaporator is in a frost-free condition;
determine an operational temperature differential between the upstream temperature sensor and the downstream temperature sensor at a time later than the determination of the frost-free temperature differential; and
when the operational temperature differential reaches a programmed threshold level below the frost-free temperature differential, initiating the defrost cycle.

### Claim 6 (depends on 5)

The defrost system of claim 5, wherein when the frost-free temperature differential is between 6.5 degrees F. and 7.5 degrees F., the programmed threshold level is between 5 degrees F. and 6 degrees F.

### Claim 7 (depends on 1)

The defrost system of claim 1, further comprising a plurality of surface temperature sensors in direct thermal communication with coil tubing of the evaporator, each of the plurality of surface temperature sensors operably connected to the controller, the controller programmed to:
determine a frost-free temperature as measured by the plurality of surface temperature sensors when the evaporator is in a frost-free condition;
determine an operational temperature differential as measured by the plurality of surface temperature sensors, at a time later than the determination of the frost-free temperature differential; and
when the operational temperature differential reaches a programmed threshold level below the frost-free temperature differential, initiating the defrost cycle.

### Claim 8 (depends on 7)

The defrost system of claim 7, wherein:
a first one of the plurality of surface temperature sensors is at a first location downstream of a fluid inlet of the evaporator;
a second one of the plurality of surface temperature sensors is at a second location downstream of the fluid inlet of the evaporator and downstream of the first location;
the controller programmed to:
determine a frost-free temperature curve;
determine an operational temperature curve; and
when the operational temperature curve reaches a programmed threshold level of flattening compared to the frost-free temperature curve, initiating the defrost cycle.

### Claim 9 (depends on 1)

The defrost system of claim 1, further comprising:
an evaporator fan is positioned and oriented to blow over the coils of the evaporator, the fan including a fan motor and a plurality of fan blades.

### Claim 10 (depends on 9)

The defrost system of claim 9, wherein:
the controller receives a signal from the fan motor indicative of the electrical current drawn by the fan motor;
the controller is programmed to:
determine a frost-free current;
determine an operational current; and
when the operational current reaches a programmed threshold level above the frost-free current, initiating the defrost cycle.

### Claim 11 (depends on 1)

The defrost system of claim 1, further comprising:
a fluid collector positioned under the evaporator;
a drain line extending from the fluid collector to a drain; and
a drain line heater operably connected to the controller, the drain line heater positioned to heat the drain line, whereby the drain line heater can be activated to melt accumulated ice within the drain line and ensure liquid passing through drain line is prevented from freezing,
wherein the controller is programmed to activate the drain line heater in concert with the initiation of the defrost cycle.

### Claim 12 (depends on 11)

The defrost system of claim 11, wherein the controller is programmed to activate the drain line heater upon activation of the defrost heater.

### Claim 13 (depends on 11)

The defrost system of claim 11, wherein the controller is programmed to activate the drain line heater at a predetermined time before activation of the defrost heater.

### Claim 14 (depends on 11)

The defrost system of claim 11, wherein the controller is programmed to:
monitor electrical current to the drain line heater and inferring malfunction when the current shows a completely open or closed circuit; and
when the controller infers malfunction, the controller is programmed to delay initiation of the defrost cycle until the drain line heater draws a normal operating current.

### Claim 15 (depends on 1)

The defrost system of claim 1, further comprising:
a suction-stop valve positioned downstream of the evaporator and upstream of the compressor, the suction-stop valve operably connected to the controller and activatable to slow or stop a flow of fluid through the vapor compression system, wherein:
wherein the controller initiates the defrost cycle comprises activating the suction-stop valve to halt circulation of the refrigerant.

### Claim 16 (depends on 15)

The defrost system of claim 15, further comprising:
a liquid solenoid positioned downstream of the condenser and upstream of the expansion valve.

### Claim 17 (depends on 16)

The defrost system of claim 16, further comprising:
an evaporator fan is positioned and oriented to blow over coils of the evaporator to induce efficient heat transfer therefrom;
a hot-gas solenoid configured and positioned to admit a flow of hot gasses into the evaporator from the defrost heater during defrost cycles,
wherein the controller is programmed to initiate a defrost cycle by:
performing a pump-out step comprising closing the liquid solenoid, opening the suction-stop valve, and activating the evaporator fan;
after the pump-out step, performing a hot-gas step comprising closing the suction-stop valve and deactivating the evaporator fan, and then opening the hot-gas solenoid to allow the hot gasses to flow to the evaporator;
after the hot-gas step, performing a bleed step comprising maintaining the configuration of the vapor compression system from the pump-out step until a pressure difference between an inlet of the compressor and a pressure in the evaporator is reduced to a predetermined threshold; and
after the bleed step, performing a refreeze step comprising opening the suction-step valve and opening the liquid solenoid while keeping the fan deactivated, for a time sufficient to allow any residual moisture to refreeze on the coils of the evaporator.

### Claim 18 (depends on 17)

The defrost system of claim 17, wherein the hot-gas solenoid is positioned to receive the hot gasses from the discharge of the condenser, whereby waste heat from the condenser is used for the defrost cycle.

### Claim 19 (depends on 15)

The defrost system of claim 15, wherein the expansion valve is an electronic expansion valve configured to modulate its throughput based on a signal from the controller.

### Claim 20

A defrost system comprising:
a vapor compression system including a compressor, a condenser, an expansion valve, an evaporator, and a quantity of refrigerant;
a defrost heater operably connected to the evaporator and configured to melt accumulated ice or frost from coils of the evaporator upon activation;
a vibration monitor operably connected to the evaporator and operable to measure and report vibration signals indicative of vibration at the evaporator; and
a controller programmed to:
receive the vibration signals from the vibration monitor;
determine a frost-free vibration amplitude when the evaporator is in a frost-free condition;
determine an operational vibration amplitude at a time later than the determination of the frost-free vibration amplitude; and
when the operational vibration amplitude reaches a programmed threshold level above the frost-free vibration amplitude, initiate a defrost cycle via control over at least one component of the vapor compression system.
