# US 2025/0154932 A1 · A windmill construction and a method for assembly of a windmill construction

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0154932 A1
- Document ID: US20250154932A1
- Status: Published application
- Kind: A1
- Application number: 18/838,523
- Filed: 2023-02-16
- Published: 2025-05-15
- Earliest claimed: 2022-02-16
- Assignees: Tebina Energi AS
- Applicants: Tebina Energi AS
- Inventors: Geir Lasse KJERSEM
- Web page: https://patentgrep.com/patent/US20250154932A1

## CPC

- E02B 17/0809: {the equipment being hydraulically actuated (outriggers for cranes B66C23/80)}
- F03D 13/206: {between the tower and the foundation}
- B66C 23/18: specially adapted for use in particular purposes
- E02D 27/425: {specially adapted for wind motors masts (wind motors per se F03D1/00)}
- E04H 12/344: {Arrangements for lifting tower sections for placing additional sections under them}
- F03D 13/112: {of towers; of masts}
- F03D 13/126: {Offshore}
- F03D 13/139: {Assembling or erecting wind motors by using lifting means}
- E02B 2017/0047: {using a barge}
- E02B 2017/0091: {Offshore structures for wind turbines}
- F05B 2230/61: using auxiliary equipment for lifting or holding
- F05B 2240/912: on a tower
- F05B 2240/95: offshore
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- F03D: WIND MOTORS
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A windmill construction (10), comprising a rotor-nacelle assembly (12) with blades (14), a tower (16), a substructure (20) and a foundation (22). The substructure (20) comprises a first guide collar (24) and a second guide collar (26) for support of the tower (16), said first guide collar (24) being located in a lower part of the substructure (20) and said second guide collar (26) being located in an upper part of the substructure (20). The substructure (20) comprises a jack-up assembly (30) for receipt of modular tower segments (18), said tower segments (18) are arranged to be assembled in the substructure (20) and erectable by the jack-up assembly (30) to produce an assembled tower (16). The invention is also directed to a method for assembly of a windmill construction.

## Claims

### Claim 1

A windmill construction (10), comprising:
a rotor-nacelle assembly (12) with blades (14),
a tower (16),
a substructure (20), and
a foundation (22),
the substructure (20) and the foundation (22) being integrated with each other,
wherein the substructure (20) comprises a first guide collar (24) and a second guide collar (26) for support of the tower (16), said first guide collar (24) being located in a lower part of the substructure (20) and said second guide collar (26) being located in an upper part of the substructure (20), and
the substructure (20) comprises a jack-up assembly (30) for receipt of modular tower segments (18), said tower segments (18) are arranged to be assembled in the substructure (20) and are erectable by the jack-up assembly (30) to produce an assembled tower (16).

### Claim 2 (depends on 1)

The windmill construction (10) according to claim 1, wherein the first guide collar (24) and the second guide collar (26) each has an aperture allowing through going axial movement of the tower segments (18).

### Claim 3 (depends on 1)

The windmill construction (10) according to claim 1, wherein the first guide collar (24) and the second guide collar (26) are closable and openable.

### Claim 4 (depends on 1)

The windmill construction (10) according to claim 1, wherein the first guide collar (24) and the second guide collar (26) comprises elastic dampers.

### Claim 5 (depends on 1)

The windmill construction (10) according to claim 1, wherein the substructure (20) comprises a third guide collar (28) located between the first guide collar (24) and the second guide collar (26), wherein the third guide collar (28) has a closable and openable aperture allowing through going axial movement of the tower segments (18).

### Claim 6 (depends on 1)

The windmill construction (10) according to claim 1, wherein the third guide collar (28) comprises an elastic damper.

### Claim 7 (depends on 1)

The windmill construction (10) according to claim 1, wherein the substructure (20) is a lattice structure.

### Claim 8

(canceled)

### Claim 9 (depends on 1)

The windmill construction (10) according to claim 1, wherein each tower segment (18) is a tubular pipe section or a lattice section.

### Claim 10 (depends on 1)

The windmill construction (10) according to claim 1, wherein each tower segment (18) comprises flanges (18a) for attachment to abutting tower segments (18).

### Claim 11 (depends on 1)

The windmill construction (10) according to claim 1, wherein the tower segment (18) is a tubular section equipped with vertical guide rails (38) for connection to the jack-up assembly (30).

### Claim 12 (depends on 11)

The windmill construction (10) according to claim 11, wherein the jack-up assembly (30) comprises hydraulic pressure cylinders (32) attachable to the tower segment (18), said hydraulic pressure cylinders (32) comprise lower and upper claws (34,36) for gripping and locking onto T shaped vertical guide rails (38) on the tower segment (18), and wherein the hydraulic pressure cylinders (32) are activatable to force the tower segments (18) upwards during assembly of the tower (16).

### Claim 13 (depends on 1)

The windmill construction (10) according to claim 1, wherein the jack-up assembly (30) comprises a rack and pinion system (40,42), said rack and pinion system (40,42) being activatable to force the tower segments (18) upwards during assembly of the tower (16).

### Claim 14 (depends on 1)

The windmill construction (10) according to claim 1, wherein the jack-up assembly (30) comprises a winch system (52) connected to a support platform (54), said winch system (52) being activatable to force the platform (54) and the tower segments (18) upwards during assembly of the tower (16).

### Claim 15 (depends on 1)

The windmill construction (10) according to claim 1, wherein the tower (16) and/or the tower segments (18) comprises attachment lugs (62) for guy lines (60).

### Claim 16 (depends on 1)

The windmill construction (10) according to claim 1, wherein the jack-up assembly (30) is located on or adjacent the first guide collar (24).

### Claim 17 (depends on 1)

The windmill construction (10) according to claim 1, wherein the foundation (22) comprises a storage-and assembly room (44) for unassembled tower segments (18).

### Claim 18 (depends on 1)

The windmill construction (10) according to claims 1, wherein the jack-up assembly (30) is arranged to elevate assembled tower segments (18) in a vertical direction to a height corresponding to one tower segment (18), allowing assembly of a new tower segment (18) to a previously assembled and elevated tower segment (18).

### Claim 19 (depends on 1)

The windmill construction (10) according to claim 1, wherein the foundation (22) comprises a downward directed conical support (50) as a bearing point against a bearing structure (64).

### Claim 20 (depends on 1)

The windmill construction (10) according to claim 1, wherein the foundation (22) is supported on an elastic bearing structure (64).

### Claim 21 (depends on 1)

The windmill construction (10) according to claim 1, wherein the foundation (22) comprises a crane (70).

### Claim 22 (depends on 1)

A method for assembly of a windmill construction (10) according to claim 1, the method comprising the steps:
assembling the substructure (20) with a first guide collar (24) and a second guide collar (26) for support of the tower (16),
building the tower (16) by assembling modular tower segments (18) using a jack-up assembly (30), said jack-up assembly (30) elevates assembled tower segments (18) in a vertical direction through said first and second guide collars (24,26).

### Claim 23 (depends on 22)

The method according to claim 22, comprising stepwise building of the tower (16) by elevating assembled tower segments (18) in the vertical direction to a height corresponding to one tower segment (18), allowing assembly of a new tower segment (18) to a previously assembled and elevated tower segment (18).

### Claim 24 (depends on 22)

The method according to claim 22, comprising the steps of mounting the rotornacelle assembly (12) and blades (14) on top of a first part of the tower (16) extending above the substructure (20), and to assemble and elevate tower segments (18) carrying the first part of the tower (16) with the rotor-nacelle assembly (12) and blades (14) to a desired height.

### Claim 25 (depends on 24)

The method according to claim 24, comprising the steps of assembling tower segments (18) to construct said first part of the tower (16).

### Claim 26 (depends on 24)

The method according to claim 24, comprising the step of inserting said first part of the tower (16) in the substructure (20).

### Claim 27 (depends on 22)

The method according to claim 22, comprising the step of assembling on site the substructure (20) on the foundation (22) using a crane (70) mounted on the foundation (22).

### Claim 28 (depends on 22)

The method according to claim 22, comprising the step of assembling the substructure (20) as a lattice structure on the foundation (22).

### Claim 29 (depends on 22)

The method according to claim 22, comprising the steps of transporting the windmill construction (10) to an offshore platform (72,72′), wherein the rotor-nacelle assembly (12) and blades (14) are preinstalled on top of a first part of the tower (16) extending above the substructure (20), and to assemble and elevate tower segments (18) carrying the first part of the tower (16) with the rotor-nacelle assembly (12) and blades (14) to a desired height.

### Claim 30 (depends on 22)

The method according to claim 22, comprising the step of connecting guy lines (60) to the tower (16).

### Claim 31 (depends on 22)

The method according to claim 22, comprising the steps of
connecting guy lines (60) to one or more tower segments (18) after the assembled tower segments (18) have been elevated in the vertical direction through and above said second guide collar (26), and
adjusting tensioning of the guy lines (60) during elevating of the tower (16).