# US 2025/0154930 A1 · Method and a system for optimizing use of a processing resource in a wind energy installation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0154930 A1
- Document ID: US20250154930A1
- Status: Published application
- Kind: A1
- Application number: 18/942,308
- Filed: 2024-11-08
- Published: 2025-05-15
- Earliest claimed: 2023-11-09
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Mads Rajczyk SKJELMOSE; Kouroush NAYEBI
- Web page: https://patentgrep.com/patent/US20250154930A1

## CPC

- F03D 7/0284: {in relation to the state of the electric grid}
- G06F 9/5038: {considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration (scheduling strategies G06F9/4881 and subgroups)}
- F03D 17/007: {Wind farm monitoring}
- G06F 9/505: {considering the load}
- H02J 3/381: {Dispersed generators}
- F05B 2270/20: to optimise the performance of a machine
- H02J 2101/28: Wind energy
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A method and a system for optimizing use of a processing resource in a wind energy installation is disclosed. A plurality of processing resource requiring tasks related to control of the wind energy installation are identified. For each processing resource requiring task, a minimum acceptable service level related to the task, and at least one action which causes a decrease in processing resource consumption related to the task while ensuring that the minimum acceptable service level is met, are defined. The processing resource requiring tasks are ranked, so as to create a prioritized list of processing resource requiring tasks. In the case that a monitored processing load level exceeds a first threshold level, at least one of the processing resource requiring tasks is selected in accordance with the prioritized list, and least one of the actions defined for the at least one selected task is performed.

## Claims

### Claim 1

A method for optimizing use of a processing resource in a wind energy installation, the method comprising:
identifying a plurality of processing resource requiring tasks related to control of the wind energy installation,
for each processing resource requiring task, defining a minimum acceptable service level related to the task, and defining at least one action which causes a decrease in processing resource consumption related to the task while ensuring that the minimum acceptable service level is met,
ranking the processing resource requiring tasks, so as to create a prioritized list of processing resource requiring tasks,
monitoring a processing load level of the processing resource and comparing the processing load level to a first threshold level,
in the case that the monitored processing load level exceeds the first threshold level, selecting at least one of the processing resource requiring tasks in accordance with the prioritized list of processing resource requiring tasks, and performing at least one of the actions defined for the at least one selected task.

### Claim 2 (depends on 1)

The method according to claim 1, wherein, (i) defining the minimum acceptable service level for each processing resource requiring task and/or (ii) processing resource requiring tasks, is/are performed in accordance with a grid code applying at a power grid to which the wind energy installation is connected.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the processing resource requiring tasks include active power loop sampling, reactive power loop sampling, power meter measurement sampling, communication tasks, status supervision and/or parameter supervision.

### Claim 4 (depends on 1)

The method according to claim 1, wherein ranking the processing resource requiring tasks comprises ranking the tasks according to criticality with respect to control of the wind energy installation.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising:
comparing the processing load level to a second threshold level, the second threshold level being higher than the first threshold level, and
in the case that the processing load level exceeds the second threshold level, selecting at least one further processing resource requiring task in accordance with the prioritized list of processing resource requiring tasks, and performing at least one of the actions defined for the at least one further selected task.

### Claim 6 (depends on 1)

The method according to claim 1, further comprising:
comparing the processing load level to a third threshold level, the third threshold level being lower than the first threshold level, and
in the case that the processing load level decreases below the third threshold level, discontinuing the at least one action defined for the at least one selected task.

### Claim 7 (depends on 1)

The method according to claim 1, further comprising, based on the performed actions, evaluating available processing power as compared to total required processing power of the processing resource requiring tasks related to control of the wind energy installation, and determining whether or not to upgrade the processing resource based on the evaluation.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the wind energy installation is a wind power plant comprising a plurality of wind turbines.

### Claim 9

A system for optimizing use of a processing resource in a wind energy installation, the system comprising:
a prioritized list of processing resource requiring tasks related to control of the wind energy installation, the prioritized list defining, for each processing resource requiring task, a minimum acceptable service level related to the task and at least one action which causes a decrease in resource consumption related to the task while ensuring that the minimum acceptable service level is met,
monitoring equipment for monitoring a processing load level of the processing resource, and
a communication unit configured to generate and communicate command signals to units performing the resource requiring tasks, in accordance with the processing load level of the processing resource and the prioritized list such that in the case that the monitored processing load level exceeds the first threshold level, at least one of the processing resource requiring tasks is selected in accordance with the prioritized list of processing resource requiring tasks, and at least one of the actions defined for the at least one selected task is performed.

### Claim 10 (depends on 9)

The system according to claim 9, wherein the system is or comprises a power plant controller (PPC) of a wind power plant comprising a plurality of wind turbines.

### Claim 11 (depends on 9)

The system according to claim 9, wherein the system is further configured to receive input regarding a grid code applying at a power grid to which the wind energy installation is connected.

### Claim 12 (depends on 9)

The system according to claim 9, wherein the processing resource requiring tasks include active power loop sampling, reactive power loop sampling, power meter measurement sampling, communication tasks, status supervision and/or parameter supervision.

### Claim 13 (depends on 9)

The system according to claim 9, wherein the minimum acceptable service level for each processing resource requiring task is defined in accordance with a grid code applying at a power grid to which the wind energy installation is connected.