# US 2025/0154830 A1 · Systems and methods for controlling drilling based on estimated position of bottom hole assembly

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0154830 A1
- Document ID: US20250154830A1
- Status: Published application
- Kind: A1
- Application number: 19/027,602
- Filed: 2025-01-17
- Published: 2025-05-15
- Earliest claimed: 2011-12-22
- Assignees: Motive Drilling Technologies, Inc.; Board of Regents, The University of Texas System
- Applicants: Motive Drilling Technologies, Inc.; Board of Regents, the University of Texas System
- Inventors: Todd W. BENSON; Teddy CHEN; Sashmit BHADURI
- Web page: https://patentgrep.com/patent/US20250154830A1

## CPC

- E21B 7/06: Deflecting the direction of boreholes
- E21B 7/04: Directional drilling
- E21B 7/10: Correction of deflected boreholes
- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 45/00: Measuring the drilling time or rate of penetration
- E21B 47/022: of the borehole, e.g. using geomagnetism
- E21B 47/024: of devices in the borehole (determining slope or direction of the borehole E21B47/022)
- E21B 47/026: of penetrated ground layers
- E21B 47/06: Measuring temperature or pressure
- E21B 47/09: Locating or determining the position of objects in boreholes or wells {, e.g. the position of an extending arm}; Identifying the free or blocked portions of pipes
- E21B 47/12: Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
- E21B 47/18: through the well fluid {, e.g. mud pressure pulse telemetry}
- G05B 13/042: {in which a parameter or coefficient is automatically adjusted to optimise the performance}
- G05B 15/02: electric
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method and a system for estimating a position of a bottom hole assembly (BHA) during drilling of a wellbore is described. The method includes receiving, by a control system, toolface information and non-survey sensor information from downhole sensors during drilling of the wellbore. Based on the non-survey sensor information, an estimated amount of progress made by the drill bit since a prior estimate of the location of the BHA located in the wellbore is calculated. An estimated location of the BHA is calculated using the toolface information and the estimated amount of progress of the drill bit. The method further includes determining whether survey data has been received. In response to receiving the survey data, the estimated location of the BHA can be updated. Responsive to the estimated location of the BHA, one or more drilling parameters can be adjusted.

## Claims

### Claim 1

A method for estimating a position of a bottom hole assembly during drilling of a wellbore, the method comprising:
(a) receiving, by a control system, toolface information and non-survey sensor information from a plurality of downhole sensors during drilling of a wellbore;
(b) calculating, by the control system, based on the non-survey sensor information, an estimated amount of progress made by a drill bit since a prior estimate of the location of a bottom hole assembly (BHA) located in the wellbore;
(c) calculating, by the control system, an estimated location of the BHA using the toolface information and the estimated amount of progress of the drill bit;
(d) determining, by the control system, whether survey data has been received;
(e) in response to receiving the survey data, updating, by the control system, the estimated location of the BHA;
(f) responsive to the estimated location of the BHA, adjusting one or more drilling parameters for drilling the wellbore; and
(e) repeating steps (a)-(e) a plurality of times during drilling of the wellbore.

### Claim 2 (depends on 1)

The method according to claim 1, wherein receiving non-survey sensor information comprises
receiving, by the control system, differential pressure; and/or
determining, by the control system, an average differential pressure over a toolface update period.

### Claim 3 (depends on 2)

The method according to claim 2, wherein calculating the estimated amount of progress comprises:
estimating, by the control system, based on the differential pressure, a force on the drill bit; and
determining, by the control system, a distance travelled by the drill bit in a current formation layer based on the force on the drill bit and geological information associated with the current formation layer.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the toolface update period is based on at least one of a speed at which a measuring while drilling (MWD) component is set to run, a priority given to the toolface information in the MWD component, or an overall bandwidth available to the MWD component.

### Claim 5 (depends on 1)

The method according to claim 1, wherein calculating the estimated location of the BHA comprises:
calculating, by the control system, a three-dimensional vector of a current location and orientation of the BHA; and
calculating, by the control system, a vector progress based on a predicted build rate of a current section and a future section of the drilling, wherein the predicted build rate is calculated using an orientation of the BHA and geological information associated with the current section and the future section.

### Claim 6 (depends on 1)

The method according to claim 1, further comprising:
responsive to not receiving the survey data, repeating steps (a)-(c) to calculate at a second location, a second estimated location of the BHA to identify BHA's incremental progression; and
developing, by the control system, based on the estimated location and the second estimated location of the BHA, an estimated path of the BHA between two survey points during the drilling of the wellbore.

### Claim 7 (depends on 1)

The method according to claim 1, further comprising:
receiving, by the control system, differential pressure as a part of the non-survey information;
determining, by the control system, an average differential pressure for a toolface update period;
determining, by the control system, based on the average differential pressure, an average rate of progress (ROP) for a current geological formation and the BHA;
applying, by the control system, the average ROP over the toolface update period to determine a borehole depth increase since a prior iteration;
receiving, by the control system, an updated toolface information;
deriving, by the control system, based on the updated toolface information; a plane of an arc to use in a curvature projection between two survey points along the wellbore;
deriving, by the control system, a radius of curvature of the arc in the curvature projection using an instantaneous build rate estimate of the BHA; and
determining, by the control system, based on the radius of curvature, a spatial estimate of a borehole position.

### Claim 8 (depends on 1)

The method according to claim 1, further comprising:
determining, by the control system, an increase in a measured depth of a drillstring over a toolface update period; and
accounting, by the control system, for tension and compression deviations in an overall drillstring length.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the measured depth is acquired based on a surface measurement of a length of pipe inserted into a borehole between a prior toolface update period and a current toolface update period.

### Claim 10 (depends on 8)

The method according to claim 8, wherein the measured depth is calculated based on measurements received from downhole sensors.

### Claim 11 (depends on 8)

The method according to claim 8, wherein accounting for tension and compression deviations comprises:
acquiring and comparing, by the control system, a hookload measurement to a static weight of a drillstring vertical section excluding a mass of a surface equipment;
determining, by the control system, a tensile elastic deformation of first components of the drillstring in the vertical section using an average cross-section and mechanical properties of the first components of the drillstring in the vertical section;
determining, by the control system, a compressive elastic deformation of second components of the drillstring in a horizontal section using an average cross-section and mechanical properties of the second components of the drillstring in the horizontal section; and
determining, by the control system, based on the tensile and the compressive elastic deformation, a total drill string length dynamic offset from the measured depth.

### Claim 12

A system for estimating a position of a bottom hole assembly during drilling a wellbore, the system comprising:
a processor; and
a memory coupled to the processor, wherein the memory comprises instructions executable by the processor for:
(a) receiving toolface information and non-survey sensor information from a plurality of downhole sensors during drilling of a wellbore;
(b) calculating, based on the non-survey sensor information, an estimated amount of progress made by the drill bit since a prior estimate of the location of a bottom hole assembly (BHA) located in the wellbore;
(c) calculating an estimated location of the BHA using the toolface information and the estimated amount of progress of the drill bit;
(d) determining whether survey data has been received;
(f) responsive to the estimated location of the BHA, adjusting one or more drilling parameters for drilling the wellbore; and
(g) repeating steps (a)-(e) a plurality of times during drilling of the wellbore.

### Claim 13 (depends on 12)

The system according to claim 12, further comprising:
responsive to not receiving the survey data, repeating steps (a)-(c) to calculate at a second location, a second estimated location of the BHA to identify BHA's incremental progression; and
developing, based on the estimated location and the second estimated location of the BHA, an estimated path of the BHA between two survey points during the drilling of the wellbore.

### Claim 14 (depends on 12)

The system according to claim 12, further comprising:
receiving differential pressure as a part of the non-survey information;
determining an average differential pressure for a toolface update period;
determining, based on the average differential pressure, an average rate of progress (ROP) for a current geological formation and the BHA;
applying the average ROP over the toolface update period to determine a borehole depth increase since a prior iteration;
receive an updated toolface information;
derive, based on the updated toolface information; a plane of arc to use in a curvature projection between two survey points along the wellbore;
derive a radius of curvature of the arc in the curvature projection using an instantaneous build rate estimate of the BHA; and
determining, based on the radius of curvature, a spatial estimate of a borehole position.

### Claim 15 (depends on 12)

The system according to claim 12, further comprising:
determining an increase in a measured depth of a drillstring over a toolface update period; and
accounting for tension and compression deviations in an overall drillstring length.

### Claim 16 (depends on 15)

The system according to claim 15, wherein the measured depth is acquired based on a surface measurement of a length of pipe inserted into a borehole between a prior toolface update period and a current toolface update period.

### Claim 17 (depends on 15)

The system according to claim 15, wherein the measured depth is calculated based on measurements received from downhole sensors.

### Claim 18 (depends on 15)

The system according to claim 15, wherein accounting for tension and compression deviations comprises:
acquiring and comparing a hookload measurement to a static weight of a drillstring vertical section excluding a mass of a surface equipment;
determining a tensile elastic deformation of first components of the drillstring in the vertical section using an average cross-section and mechanical properties of the first components of the drillstring in the vertical section;
determining a compressive elastic deformation of second components of the drillstring in a horizontal section using an average cross-section and mechanical properties of the second components of the drillstring in the horizontal section; and
determining, based on the tensile and the compressive elastic deformation, a total drill string length dynamic offset from the measured depth.