# US 2025/0153749 A1 · Methods and systems for determining hybrid train configurations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0153749 A1
- Document ID: US20250153749A1
- Status: Published application
- Kind: A1
- Application number: 18/506,551
- Filed: 2023-11-10
- Published: 2025-05-15
- Earliest claimed: 2023-11-10
- Assignees: Progress Rail Locomotive Inc.
- Applicants: Progress Rail Locomotive Inc.
- Inventors: Keith WAIT
- Web page: https://patentgrep.com/patent/US20250153749A1

## CPC

- B61L 27/16: Trackside optimisation of vehicle or train operation
- B61L 27/57: for vehicles or trains, e.g. trackside supervision of train conditions
- B61L 15/009: {On-board display devices}
- B61L 27/12: Preparing schedules
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)

## Abstract

In one instance, disclosed herein is a system for configuring a train having at least one hybrid locomotive, the system comprising at least one processor operative to: receive an anticipated train route; receive a provisional train configuration, the provisional train configuration including the at least one hybrid locomotive, wherein the at least one hybrid locomotive includes at least one internal combustion engine and at least one energy storage system; determine whether the provisional train configuration is capable of completely traversing the anticipated train route; and in response to determining that the provisional train configuration is capable of completely traversing the anticipated train route, prompt a graphical user interface to display a visual indication that the provisional train configuration is capable of completely traversing the anticipated train route.

## Claims

### Claim 1

A system for configuring a train having at least one hybrid locomotive, the system comprising at least one processor operative to:
receive an anticipated train route;
receive a provisional train configuration, the provisional train configuration including the least one hybrid locomotive, wherein the at least one hybrid locomotive includes at least one internal combustion engine and at least one energy storage system;
determine whether the provisional train configuration is capable of completely traversing the anticipated train route; and
in response to determining that the provisional train configuration is capable of completely traversing anticipated train route, prompt a graphical user interface (GUI) to display a visual indication that the provisional train configuration is capable of completely traversing the anticipated train route.

### Claim 2 (depends on 1)

The system of claim 1, wherein the at least one processor is further operative to, in response to determining that the provisional train configuration is not capable of completely traversing the anticipated train route, generate a recommended train configuration that is capable of completely traversing the anticipated train route and prompt the GUI to display the recommended train configuration.

### Claim 3 (depends on 2)

The system of claim 2, wherein the at least one processor is further operative to generate the recommended train configuration at least in part by accessing an available vehicle inventory database.

### Claim 4 (depends on 2)

The system of claim 2, wherein the at least one processor is further operative to generate the recommended train configuration at least in part by minimizing an amount of anticipated emissions from the recommended train configuration along the anticipated train route.

### Claim 5 (depends on 2)

The system of claim 2, wherein the recommended train configuration comprises at least one hybrid locomotive comprising at least one internal combustion engine and at least one energy storage system and wherein the at least one processor is further operative to generate the recommended train configuration at least in part by maximizing an amount of anticipated surplus battery energy from the at least one energy storage system along the anticipated train route.

### Claim 6 (depends on 1)

The system of claim 1, wherein the at least one processor is further operative to, in response to determining that the provisional train configuration is not capable of completely traversing the anticipated train route, determine a deficiency of the provisional train configuration and prompt the GUI to display the deficiency for the provisional train configuration.

### Claim 7 (depends on 1)

The system of claim 1, wherein the anticipated train route comprises one or more graded segments and wherein the at least one processor is further operative to determine whether the provisional train configuration is capable of completely traversing the anticipated train route at least in part by:
determining a steepest graded segment from the one or more graded segments;
determining a maximum hybrid power of the at least one hybrid locomotive;
determining an equivalent grade of the maximum hybrid power; and
determining whether the equivalent grade of the maximum hybrid power is greater than the grade of the steepest graded segment.

### Claim 8 (depends on 7)

The system of claim 7, wherein the at least one processor is further operative to determine whether the provisional train configuration is capable of completely traversing the anticipated train route at least in part by:
determining a continuous rated power of the at least one hybrid locomotive;
determining an equivalent grade of the continuous rated power;
integrating the difference between the equivalent grade of the continuous rated power and one or more grades of the one or more graded segments along the anticipated train route to determine a required battery supplement; and
determining whether the at least one hybrid locomotive possesses the required battery supplement.

### Claim 9 (depends on 8)

The system of claim 8, wherein the at least one processor is further operative to, in response to determining that the at least one hybrid locomotive possesses the required battery supplement, determine a surplus battery energy from the at least one hybrid locomotive along the anticipated train route and prompt the GUI to display the surplus battery energy.

### Claim 10 (depends on 8)

The system of claim 8, wherein the at least one processor is further operative to identify one or more charging opportunities along the anticipated train route and determine whether additional battery energy potentially provided by the one or more charging opportunities combined with a battery capacity of the at least one hybrid locomotive exceeds the required battery supplement.

### Claim 11

A method for configuring a train comprising at least one hybrid locomotive, the method comprising:
receiving an anticipated train route;
receiving a provisional train configuration, the provisional train configuration comprising at least one hybrid locomotive including an internal combustion engine and an energy storage system including a battery system;
determining whether the provisional train configuration is capable of completely traversing the anticipated train route; and
in response to determining that the provisional train configuration is capable of completely traversing the anticipated train route, prompting a graphical user interface (GUI) to display a visual indication that the provisional train configuration is capable of completely traversing the anticipated train route.

### Claim 12 (depends on 11)

The method of claim 11, wherein the anticipated train route comprises one or more graded segments and wherein determining whether the provisional train configuration is capable of completely traversing the anticipated train route further comprises:
determining a steepest graded segment from the one or more graded segments;
determining a maximum hybrid power of the at least one hybrid locomotive;
determining an equivalent grade of the maximum hybrid power; and
determining whether the equivalent grade of the maximum hybrid power is greater than the grade of the steepest graded segment.

### Claim 13 (depends on 12)

The method of claim 12, wherein determining whether the provisional train configuration is capable of completely traversing the anticipated train route further comprises:
determining a continuous rated power of the at least one hybrid locomotive;
determining an equivalent grade of the continuous rated power;
integrating the difference between the equivalent grade of the continuous rated power and one or more grades of the one or more graded segments along the anticipated train route to determine a required battery supplement; and
determining whether the at least one hybrid locomotive possesses the required battery supplement.

### Claim 14 (depends on 13)

The method of claim 13, further comprising, in response to determining that the at least one hybrid locomotive possesses the required battery supplement, determining a surplus battery energy from the at least one hybrid locomotive along the anticipated train route and prompting the GUI to display the surplus battery energy.

### Claim 15 (depends on 13)

The method of claim 13, further comprising identifying one or more charging opportunities along the anticipated train route and determining whether additional battery energy potentially provided by the one or more charging opportunities combined with a battery capacity of the at least one hybrid locomotive exceeds the required battery supplement.

### Claim 16

A method for configuring a train comprising at least one hybrid locomotive, the method comprising:
receiving an anticipated train route;
receiving a provisional train configuration, the provisional train configuration comprising at least one non-powered car and at least one locomotive;
generating a recommended train configuration that is capable of completely traversing the anticipated train route, the recommended train configuration comprising the at least one non-powered car and at least one hybrid locomotive including an internal combustion engine and an energy storage system; and
prompting a graphical user interface to display the recommended train configuration.

### Claim 17 (depends on 16)

The method of claim 16, wherein generating the recommended train configuration further comprises accessing an available vehicle inventory database.

### Claim 18 (depends on 16)

The method of claim 16, wherein generating the recommended train configuration further comprises accessing a route information database and cross-referencing the anticipated train route with the route information database.

### Claim 19 (depends on 16)

The method of claim 16, wherein generating the recommended train configuration further comprises minimizing an amount of anticipated emissions from the recommended train configuration along the anticipated train route.

### Claim 20 (depends on 16)

The method of claim 16, wherein generating the recommended train configuration further comprises maximizing an amount of anticipated surplus battery energy from the at least one energy storage system along the anticipated train route.
