# US 2025/0153596 A1 · Method and system for charging electric vehicle at an electric vehicle charging station

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0153596 A1
- Document ID: US20250153596A1
- Status: Published application
- Kind: A1
- Application number: 18/787,058
- Filed: 2024-07-29
- Published: 2025-05-15
- Earliest claimed: 2023-11-09
- Assignees: Lite-On Singapore Pte. Ltd.
- Applicants: Lite-On Singapore Pte. Ltd.
- Inventors: Ken-Weng KOW; Binte Ahmad Jefri HAMIMAH; Zhi-Ming ZHONG; Jing YANG; En Cheng Benjin LAU
- Web page: https://patentgrep.com/patent/US20250153596A1

## CPC

- G06Q 40/04: Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
- B60L 53/305: {Communication interfaces}
- B60L 53/62: in response to charging parameters, e.g. current, voltage or electrical charge
- B60L 53/63: in response to network capacity
- B60L 53/65: involving identification of vehicles or their battery types
- B60L 53/665: {Methods related to measuring, billing or payment}
- B60L 53/67: Controlling two or more charging stations
- B60L 53/68: Off-site monitoring or control, e.g. remote control
- G06Q 10/02: Reservations, e.g. for tickets, services or events
- G06Q 50/06: Energy or water supply
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- G06Q 2240/00: Transportation facility access, e.g. fares, tolls or parking
- H02J 2105/37: exchanging power with electric vehicles [EV] or with hybrid electric vehicles [HEV]
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 90/12: Electric charging stations
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

A method for charging electric vehicle (EV) at an electric vehicle charging station equipped with electric vehicle supply equipments (EVSEs) is provided. A normal charging procedure is performed on the EVSEs to charge EV under control of a cloud controller. Dynamic load management (DLM) is inactive during the normal charging procedure. A first time point, referred to whether a total load is equal to or larger than a trigger threshold during the normal charging procedure, is determined. If the determination is yes, DLM is activated to charge the at least one EV by the EVSEs under control of an edge controller. A second time point, referred to whether a gradient of the total load reaches a gradient threshold during activated DLM, is determined. If the determination is yes, the charging capacity of each EVSE is adjusted based on an available EV charging capacity by the edge controller.

## Claims

### Claim 1

A method for charging electric vehicle (EV) at an electric vehicle charging station equipped with a plurality of electric vehicle supply equipment (EVSE), comprising:
performing a normal charging procedure on the EVSEs to charge at least one EV by the EVSEs under the control of a cloud controller, wherein dynamic load management (DLM) is inactive during the normal charging procedure;
determining a first time point, which is referred to whether a total load is equal to or larger than a trigger threshold during the normal charging procedure, wherein the total load corresponds to a first load of other building loads and a second load of the EVSEs, and the other building loads and the EVSEs receive power from main incoming from grid via a power line;
when the total load corresponding to the first time point is equal to or larger than the trigger threshold during the normal charging procedure, activating DLM to charge the at least one EV by the EVSEs under control of an edge controller;
determining a second time point, which is referred to whether a gradient of the total load reaches a gradient threshold during activated DLM; and
when the gradient of the total load at the second time point reaches the gradient threshold during activated DLM, adjusting the charging capacity of each EVSE based on an available EV charging capacity corresponding to the second time point by the edge controller.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising:
determining a third time point, which is referred to whether the total load is equal to or larger than the trigger threshold during the active DLM period; and
when the total load corresponding to the third time point is equal to or larger than the trigger threshold during activated DLM, adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the third time point by the edge controller.

### Claim 3 (depends on 2)

The method according to claim 2, wherein in the step of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the second time point by the edge controller, the charging capacity of each EVSE is adjusted proportionally according to a maximum charging capacity of the corresponding EVSE;
wherein in the step of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the third time point by the edge controller, the charging capacity of each EVSE is adjusted proportionally according to the maximum charging capacity of the corresponding EVSE.

### Claim 4 (depends on 2)

The method according to claim 2, further comprising:
obtaining a main meter data from a main meter when the at least one EV are charged by the EVSEs;
wherein the first time point, which is referred to whether the total load is equal to or larger than the trigger threshold during the normal charging procedure, is determined according to the obtained main meter data at the first time point from the main meter, and the main meter is configured to measure a current or power of the power line;
wherein the second time point, which is referred to whether the gradient of the total load reaches the gradient threshold during activated DLM, is determined according to the obtained main meter data at the second time point from the main meter;
wherein whether the total load corresponding to the third time point is equal to or larger than the trigger threshold during activated DLM is determined according to the obtained main meter data at the third time point from the main meter.

### Claim 5 (depends on 4)

The method according to claim 4, wherein a data logger is used to store the main meter data obtained from the main meter, and an outlet is used to supply power to other devices when needed.

### Claim 6 (depends on 2)

The method according to claim 2, wherein the step of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the third time point by the edge controller comprises the following steps:
calculating the available EV charging capacity at the third time point;
conducting EV charging control;
determining a number of EVSEs in use at the third time point;
calculating a total maximum EVSE capacity in use at the third time point;
calculating a charging rate of each EVSE at the third time point;
calculating the charging capacity of each EVSE at the third time point based on the available EV charging capacity at the third time point and the charging rate of each EVSE at the third time point; and
charging the at least one EV in use by the EVSEs with the calculated charging capacity of each EVSE.

### Claim 7 (depends on 6)

The method according to claim 6, wherein the charging rate of each EVSE at the third time point is proportional to a maximum charging capacity of the corresponding EVSE.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the step of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the second time point by the edge controller comprises the following steps:
calculating the available EV charging capacity at the second time point;
conducting EV charging control;
determining a number of EVSEs in use at the second time point;
calculating a total maximum EVSE capacity in use at the second time point;
calculating a charging rate of each EVSE at the second time point;
calculating the charging capacity of each EVSE at the second time point based on the available EV charging capacity at the second time point and the charging rate of each EVSE at the second time point; and
charging the at least one EV in use by the EVSEs with the calculated charging capacity of each EVSE.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the charging rate of each EVSE at the second time point is proportional to a maximum charging capacity of the corresponding EVSE.

### Claim 10 (depends on 1)

The method according to claim 1, wherein the total load is a sum of the first load of the other building loads and the second load of the EVSEs, the total load is a sum of a current for the other building loads and a current for the EVSEs, or the total load is a sum of power consumption for the other building loads and power consumption for the EVSEs.

### Claim 11 (depends on 1)

The method according to claim 1, further comprising:
determining whether the total load corresponding to a fourth time point is equal to or less than a release threshold during activated DLM;
when the total load corresponding to the fourth time point is equal to or less than the release threshold during activated DLM, deactivating DLM and restarting the normal charging procedure to charge the at least one EV by the EVSEs under the control of the cloud controller;
wherein the release threshold is lower than the trigger threshold, the trigger threshold is lower than a maximum site capacity of the total load, which includes EVSE loads and other building loads of the site.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the main incoming from grid is coupled to a first breaker, the other building loads are coupled to a second breaker, and the EVSEs are coupled to a third breaker, the other building loads are coupled to the main incoming from grid through the first breaker and the second breaker, and the EVSEs are coupled to the main incoming from grid through the first breaker and the third breaker.

### Claim 13 (depends on 1)

The method according to claim 1, wherein the electric vehicle charging station further include an EVSE distribution board for electrical power distribution and safety of charging the EV by the EVSEs.

### Claim 14 (depends on 1)

The method according to claim 1, wherein a first breaker is electrically connected to the power line, a second breaker is electrically connected to the other building loads, a plurality of third beakers are electrically connected to the EVSEs respectively, a first switch is used and connected to a main meter, and a second switch is used and connected to the main incoming from grid.

### Claim 15

A system for charging EVs at an electric vehicle charging station equipped with a plurality of EVSEs, comprising:
a cloud controller, configured to perform a normal charging procedure on the EVSEs to charge at least one EV by the EVSEs under control of the cloud controller, wherein DLM is inactive during the normal charging procedure; and
an edge controller, configured to perform the following procedures:
determining a first time point, which is referred to whether a total load is equal to or larger than a trigger threshold during the normal charging procedure, wherein the total load corresponds to a first load of other building loads and a second load of the EVSEs, and the other building loads and the EVSEs receive power from main incoming from grid via a power line;
when the total load corresponding to the first time point is equal to or larger than the trigger threshold during the normal charging procedure, activating DLM to charge the at least one EV by the EVSEs under control of the edge controller;
determining a second time point, which is referred to whether a gradient of the total load reaches a gradient threshold during activated DLM; and
when the gradient of the total load at the second time point reaches the gradient threshold during activated DLM, adjusting the charging capacity of each EVSE based on an available EV charging capacity corresponding to the second time point.

### Claim 16 (depends on 15)

The system according to claim 15, wherein the edge controller is further configured to perform the following procedures:
determining a third time point, which is referred to whether the total load is equal to or larger than the trigger threshold during the active DLM period; and
when the total load corresponding to the third time point is equal to or larger than the trigger threshold during activated DLM, adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the third time point.

### Claim 17 (depends on 16)

The system according to claim 16, wherein in the procedure of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the second time point by the edge controller, the charging capacity of each EVSE is adjusted proportionally according to a maximum charging capacity of the corresponding EVSE;
wherein in the procedure of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the third time point by the edge controller, the charging capacity of each EVSE is adjusted proportionally according to the maximum charging capacity of the corresponding EVSE.

### Claim 18 (depends on 16)

The system according to claim 16, further comprising:
a main meter, configured to measure a current or power of the power line and obtain a main meter data when the at least one EV are charged by the EVSEs;
wherein the first time point, which is referred to whether the total load is equal to or larger than the trigger threshold during the normal charging procedure, is determined according to the obtained main meter data at the first time point from the main meter;
wherein the second time point, which is referred to whether the gradient of the total load reaches the gradient threshold during activated DLM, is determined according to the obtained main meter data at the second time point from the main meter;
wherein whether the total load corresponding to the third time point is equal to or larger than the trigger threshold during activated DLM is determined according to the obtained main meter data at the third time point from the main meter.

### Claim 19 (depends on 18)

The system according to claim 18, further comprising a data logger and an outlet, the data logger is used to store the main meter data obtained from the main meter, and the outlet is used to supply power to other devices when needed.

### Claim 20 (depends on 16)

The system according to claim 16, wherein the procedure of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the third time point comprises the following procedures:
calculating the available EV charging capacity at the third time point;
conducting EV charging control;
determining a number of EVSEs in use at the third time point;
calculating a total maximum EVSE capacity in use at the third time point;
calculating a charging rate of each EVSE at the third time point;
calculating the charging capacity of each EVSE at the third time point based on the available EV charging capacity at the third time point and the charging rate of each EVSE at the third time point; and
charging the at least one EV in use by the EVSEs with the calculated charging capacity of each EVSE.

### Claim 21 (depends on 19)

The system according to claim 19, wherein the charging rate of each EVSE at the third time point is proportional to a maximum charging capacity of the corresponding EVSE.

### Claim 22 (depends on 15)

The system according to claim 15, wherein the procedure of adjusting the charging capacity of each EVSE based on the available EV charging capacity corresponding to the second time point comprises the following procedures:
calculating the available EV charging capacity at the second time point;
conducting EV charging control;
determining a number of EVSEs in use at the second time point;
calculating a total maximum EVSE capacity in use at the second time point;
calculating a charging rate of each EVSE at the second time point;
calculating the charging capacity of each EVSE at the second time point based on the available EV charging capacity at the second time point and the charging rate of each EVSE at the second time point; and
charging the at least one EV in use by the EVSEs with the calculated charging capacity of each EVSE.

### Claim 23 (depends on 21)

The system according to claim 21, wherein the charging rate of each EVSE at the second time point is proportional to a maximum charging capacity of the corresponding EVSE.

### Claim 24 (depends on 15)

The system according to claim 15, wherein the total load is a sum of the first load of the other building loads and the second load of the EVSEs, the total load is a sum of a current for the other building loads and a current for the EVSEs, or the total load is a sum of power consumption for the other building loads and power consumption for the EVSEs.

### Claim 25 (depends on 15)

The system according to claim 15, wherein the edge controller is further configured to perform the following procedures:
determining whether the total load corresponding to a fourth time point is equal to or less than a release threshold during activated DLM;
when the total load corresponding to the fourth time point is equal to or less than the release threshold during activated DLM, deactivating DLM;
wherein the cloud controller is further configured to restart the normal charging procedure to charge the at least one EV by the EVSEs under the control of the cloud controller when the total load corresponding to the fourth time point is equal to or less than the release threshold during activated DLM;
wherein the release threshold is lower than the trigger threshold, the trigger threshold is lower than a maximum site capacity of the total load, which includes the EVSE loads and other building loads of the site.

### Claim 26 (depends on 15)

The system according to claim 15, wherein the main incoming from grid is coupled to a first breaker, the other building loads are coupled to a second breaker, and the EVSEs are coupled to a third breaker, the other building loads are coupled to the main incoming from grid through the first breaker and the second breaker, and the EVSEs are coupled to the main incoming from grid through the first breaker and the third breaker.

### Claim 27 (depends on 15)

The system according to claim 15, wherein the electric vehicle charging station further include an EVSE distribution board for electrical power distribution and safety of charging the EVs by the EVSEs.

### Claim 28 (depends on 15)

The system according to claim 15, wherein a first breaker is electrically connected to the power line, a second breaker is electrically connected to the other building loads, a plurality of third beakers are electrically connected to the EVSEs respectively, a first switch is used and connected to a main meter, and a second switch is used and connected to the main incoming from grid.