# US 2025/0149301 A1 · Plasma processing apparatus including gas distribution plate

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0149301 A1
- Document ID: US20250149301A1
- Status: Published application
- Kind: A1
- Application number: 19/009,570
- Filed: 2025-01-03
- Published: 2025-05-08
- Earliest claimed: 2018-03-29
- Assignees: Samsung Electronics Co., Ltd.
- Applicants: Samsung Electronics Co., Ltd.
- Inventors: Chan Hoon PARK; Jung Hwan UM; Jin Young PARK; Ho Yong PARK; Jin Young BANG; Jong Woo SUN; Sang Jean JEON; Je Woo HAN
- Web page: https://patentgrep.com/patent/US20250149301A1

## CPC

- H01J 37/3244: {Gas supply means}
- H01J 37/32715: {Workpiece holder}
- H10P 72/0421: {for drying etching}
- H01J: ELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS (spark-gaps H01T; electric arc lamps H05B31/00; particle accelerators H05H)
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10

## Abstract

A plasma processing apparatus may include a support configured to receive a substrate, a gas distribution plate (GDP) including a plurality of nozzles facing the support, a main splitter configured to supply a process gas, and an additional splitter configured to supply an acceleration gas or a deceleration gas. The plurality of nozzles may include a plurality of central nozzles, a plurality of outer nozzles, a plurality of middle nozzles configured to spray the process gas and the acceleration gas, a plurality of first nozzles, and a plurality of second nozzles.

## Claims

### Claim 1

A plasma processing method, comprising:
a preparing plasma processing apparatus including a main gas supplier, an additional gas supplier, and a chamber,
wherein the chamber comprises:
a support;
a main splitter connected to the main gas supplier;
an additional splitter connected to the additional gas supplier; and
a gas distribution plate (GDP) on the support and connected to the main splitter and the additional splitter,
wherein the GDP comprises reservoirs and nozzles, each connected to a respective reservoir,
wherein the reservoirs comprise:
a first reservoir and a second reservoir connected to the main splitter and not connected to the additional splitter; and
a third reservoir between the first reservoir and the second reservoir and connected to both the main splitter and the additional splitter, and
wherein the first reservoir, the second reservoir, and the third reservoir are separated from each other; and
placing a substrate on the support; and
forming a plasma between the substrate and the GDP using a process gas and an additional gas,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate after passing through the main splitter, the first reservoir, and the second reservoir,
wherein the additional gas supplied from the additional gas supplier to the chamber is sprayed onto the substrate after passing through the additional splitter and the third reservoir, and
wherein the additional gas is an acceleration gas for increasing a plasma density of the process gas or a deceleration gas for decreasing the plasma density of the process gas.

### Claim 2 (depends on 1)

The method of claim 1,
wherein the additional gas supplied from the additional gas supplier and sprayed onto the substrate does not pass through the main splitter, the first reservoir, and the second reservoir.

### Claim 3 (depends on 1)

The method of claim 1,
wherein the reservoirs further comprise a fourth reservoir connected to the first reservoir, and
wherein the first reservoir is between the fourth reservoir and the third reservoir.

### Claim 4 (depends on 3)

The method of claim 3,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate after passing through the main splitter, the first reservoir, the second reservoir, and the fourth reservoir.

### Claim 5 (depends on 4)

The method of claim 4,
wherein the additional gas supplied from the additional gas supplier and sprayed onto the substrate does not pass through the main splitter, the first reservoir, the second reservoir, and the fourth reservoir.

### Claim 6 (depends on 3)

The method of claim 3,
wherein the reservoirs further comprise a fifth reservoir connected to the second reservoir, and
wherein the second reservoir is between the fifth reservoir and the third reservoir.

### Claim 7 (depends on 6)

The method of claim 6,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate after passing through the main splitter, the first reservoir, the second reservoir, the fourth reservoir, and the fifth reservoir.

### Claim 8 (depends on 7)

The method of claim 7,
wherein the additional gas supplied from the additional gas supplier and sprayed onto the substrate does not pass through the main splitter, the first reservoir, the second reservoir, the fourth reservoir, and the fifth reservoir.

### Claim 9 (depends on 6)

The method of claim 6,
wherein the reservoirs further comprise an outer reservoir,
wherein the fifth reservoir is between the second reservoir and the outer reservoir, and
wherein the outer reservoir is separated from the fifth reservoir.

### Claim 10 (depends on 9)

The method of claim 9,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate after passing through the main splitter, the first reservoir, the second reservoir, the fourth reservoir, the fifth reservoir, and the outer reservoir.

### Claim 11 (depends on 10)

The method of claim 10,
wherein the additional gas supplied from the additional gas supplier and sprayed onto the substrate does not pass through the main splitter, the first reservoir, the second reservoir, the fourth reservoir, the fifth reservoir, and the outer reservoir.

### Claim 12 (depends on 9)

The method of claim 9,
wherein the reservoirs further comprise an outermost reservoir connected to the outer reservoir,
wherein the outer reservoir is between the fifth reservoir and the outermost reservoir.

### Claim 13 (depends on 12)

The method of claim 12,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate after passing through the main splitter, the first reservoir, the second reservoir, the fourth reservoir, the fifth reservoir, the outer reservoir, and the outermost reservoir.

### Claim 14 (depends on 13)

The method of claim 13,
wherein the additional gas supplied from the additional gas supplier and sprayed onto the substrate does not pass through the main splitter, the first reservoir, the second reservoir, the fourth reservoir, the fifth reservoir, the outer reservoir, and the outermost reservoir.

### Claim 15 (depends on 1)

The method of claim 1,
wherein the reservoirs further comprise a central reservoir,
wherein the first reservoir is between the central reservoir and the third reservoir, and
wherein the central reservoir is separated from the first reservoir.

### Claim 16 (depends on 15)

The method of claim 15,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate after passing through the main splitter, the first reservoir, the second reservoir, and the central reservoir, and
wherein the additional gas supplied from the additional gas supplier to the chamber is sprayed onto the substrate after passing through the additional splitter, the third reservoir, and the central reservoir.

### Claim 17 (depends on 1)

The method of claim 1,
wherein the process gas is different from the additional gas.

### Claim 18 (depends on 1)

The method of claim 1,
wherein the acceleration gas comprises Ar, Kr, or Xe.

### Claim 19 (depends on 1)

The method of claim 1,
wherein the deceleration gas comprises He or Ne.

### Claim 20 (depends on 1)

The method of claim 1,
wherein the nozzles comprise:
a first nozzle connected to the first reservoir;
a second nozzle connected to the second reservoir; and
a third nozzle connected to the third reservoir,
wherein the process gas supplied from the main gas supplier to the chamber is sprayed onto the substrate from the first nozzle, the second nozzle, and the third nozzle, and
wherein the additional gas supplied from the additional gas supplier to the chamber is sprayed onto the substrate from the third nozzle and is not sprayed onto the substrate from the first nozzle and the second nozzle.
