# US 2025/0148401 A1 · Method and system of coordinating clearance of a work area

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0148401 A1
- Document ID: US20250148401A1
- Status: Published application
- Kind: A1
- Application number: 18/502,751
- Filed: 2023-11-06
- Published: 2025-05-08
- Earliest claimed: 2023-11-06
- Assignees: Deere & Company
- Applicants: Deere & Company
- Inventors: Jeremy B. Shuler; Francois Stander
- Web page: https://patentgrep.com/patent/US20250148401A1

## CPC

- G06Q 10/08: Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- E02F 9/2054: {Fleet management}
- E02F 9/262: {with follow-up actions to control the work tool, e.g. controller}
- G05D 1/028: {using a RF signal}
- E02F 3/431: {for bucket-arms, front-end loaders, dumpers or the like}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES

## Abstract

A method of coordinating clearance of a work area may comprise, via one or more work machines, comminuting material from a work area and delivering the comminuted material into one or more stockpiles; automatically monitoring, via one or more perception sensors, and for at least a first stockpile of the one or more stockpiles, one or more multidimensional characteristics thereof; ascertaining (e.g., detecting and/or predicting) boundary conditions associated with the at least first stockpile, based at least in part on the monitored one or more multidimensional characteristics thereof; and upon initiating or reestablishing communication between at least a first work machine of the one or more work machines and at least a first stockpile clearing vehicle of one or more stockpile clearing vehicles associated with the work area, selectively generating output signals corresponding to the one or more multidimensional characteristics and/or the boundary condition of the at least first stockpile.

## Claims

### Claim 1

A method of coordinating clearance of a work area comprising one or more stockpiles of comminuted material worked via one or more work machines, the method comprising:
automatically monitoring, via one or more perception sensors, and for at least a first stockpile of the one or more stockpiles, one or more multidimensional characteristics thereof;
ascertaining a boundary condition associated with the at least first stockpile, based at least in part on the monitored one or more multidimensional characteristics thereof; and
upon initiating or reestablishing communication between at least a first work machine of the one or more work machines and at least a first stockpile clearing vehicle of one or more stockpile clearing vehicles associated with the work area, selectively generating output signals corresponding to the one or more multidimensional characteristics and/or the boundary condition of the at least first stockpile.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
ascertaining the boundary condition comprises detecting and/or predicting the boundary condition via a controller associated with the at least first work machine.

### Claim 3 (depends on 1)

The method of claim 1, wherein:
ascertaining the boundary condition comprises detecting and/or predicting the boundary condition via a controller associated with the at least first stockpile clearing vehicle.

### Claim 4 (depends on 1)

The method of claim 1, wherein:
communication is initiated or reestablished between the at least first work machine and the at least first stockpile clearing vehicle in the work area based at least in part on proximity of the at least first work machine relative to the at least first stockpile clearing vehicle.

### Claim 5 (depends on 1)

The method of claim 1, wherein:
communication between the at least first work machine and the at least first stockpile clearing vehicle is initiated or reestablished via a preexisting work area communications network.

### Claim 6 (depends on 1)

The method of claim 1, wherein:
the monitored one or more multidimensional characteristics comprise a growth rate of the at least first stockpile in the work area ascertained via a controller associated with the at least first work machine.

### Claim 7 (depends on 1)

The method of claim 1, wherein:
the step of selectively generating output signals includes selectively generating an output signal corresponding to an alert when the one or more multidimensional characteristics and/or the boundary condition of the at least first stockpile reaches a predetermined threshold.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
performing a loading operation via the at least one stockpile clearing vehicle wherein the comminuted material is removed from the at least first stockpile in the work area.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
adjusting the predicted boundary condition associated with the at least first stockpile in the work area in response to the loading operation.

### Claim 10 (depends on 1)

The method of claim 1, further comprising:
selectively generating either a positive response signal or a negative response signal via the at least first stockpile clearing vehicle, wherein the positive response signal indicates the at least first stockpile clearing vehicle will perform a loading operation, and the negative response signal indicates the at least first stockpile clearing vehicle will not intend to perform the loading operation.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
upon receiving the negative response signal from the at least first stockpile clearing vehicle in the work area, generating output signals to additional stockpile clearing vehicles corresponding to the boundary condition of the at least first stockpile in the work area.

### Claim 12 (depends on 10)

The method of claim 10, further comprising:
upon receiving the positive response signal from the at least first stockpile clearing vehicle in the work area, stopping the generation of output signals corresponding to the boundary condition of the at least first stockpile in the work area.

### Claim 13 (depends on 1)

The method of claim 1, wherein:
the boundary condition corresponds at least in part to a volume of the at least one stockpile in the work area.

### Claim 14

A system of coordinating clearance of a work area, the system comprising:
one or more work machines configured to comminute material from a work area and deliver the comminuted material into one or more stockpiles;
one or more perception sensors configured to monitor, for at least a first stockpile, one or more multidimensional characteristics thereof;
a controller configured to detect and/or predict a boundary condition associated with the at least first stockpile, based at least in part on the monitored one or more multidimensional characteristics thereof; and
wherein the controller is configured to, upon initiating or reestablishing communication between at least a first work machine of the one or more work machines and at least a first stockpile clearing vehicle of one or more stockpile clearing vehicles associated with the work area, selectively generate output signals corresponding to the one or more multidimensional characteristics and/or the boundary condition of the at least one stockpile.

### Claim 15 (depends on 14)

The system of claim 14, wherein:
the controller is associated with the at least first work machine.

### Claim 16 (depends on 14)

The system of claim 14, wherein:
communication is initiated or reestablished between the at least first work machine and the at least first stockpile clearing vehicle based at least in part on proximity of the at least first work machine relative to the at least first stockpile clearing vehicle.

### Claim 17 (depends on 14)

The system of claim 14, further comprising:
a work area communications network configured to enable communication between the at least first work machine and the at least first stockpile clearing vehicle.

### Claim 18 (depends on 14)

The system of claim 14, wherein:
the controller is configured to detect a growth rate of the at least first stockpile in the work area.

### Claim 19 (depends on 14)

The system of claim 14, wherein:
the controller is configured to generate an output signal corresponding to an alert when the one or more multidimensional characteristics and/or the boundary condition of the at least first stockpile reaches a predetermined threshold.

### Claim 20 (depends on 14)

The system of claim 14, wherein:
the one or more stockpile clearing vehicles are configured to perform a loading operation wherein the comminuted material is removed from the at least first stockpile in the work area.