# US 2025/0148389 A1 · Method for generating prediction model for supply lead time of parts

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0148389 A1
- Document ID: US20250148389A1
- Status: Published application
- Kind: A1
- Application number: 18/934,759
- Filed: 2024-11-01
- Published: 2025-05-08
- Earliest claimed: 2023-11-08
- Assignees: VMS Solutions Co. Ltd.
- Applicants: VMS Solutions Co. Ltd.
- Inventors: Seock Kyu YOO; Cherl Hong PARK; KyungSik LEE; SungWon HONG; HoJin JUNG
- Web page: https://patentgrep.com/patent/US20250148389A1

## CPC

- G06Q 10/06314: {Calendaring for a resource}
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/0875: Itemisation or classification of parts, supplies or services, e.g. bill of materials
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Provided is a method for generating a lead time prediction model including: receiving input data from a user; identifying a final part corresponding to the input data; identifying one or more components that constitute the final part; classifying the identified one or more components into in-house production parts, which are produced in-house, and ordered parts, which are procured from suppliers; determining a lead time for the in-house production parts; obtaining first data including at least price data and historical lead time data, for each of the ordered parts; generating a model for generating a predicted lead time for at least one of the final part and the ordered parts, based on the obtained first data; and optimizing the model based on at least one of fixed costs, inventory costs, ordering costs, backlog costs, and demand loss costs.

## Claims

### Claim 1

A method for implementing a model for generating a predicted lead time, comprising:
receiving input data from a user;
identifying a final part corresponding to the input data;
identifying one or more components that constitute the final part;
classifying the identified one or more components into in-house production parts, which are produced in-house, and ordered parts, which are procured from suppliers;
determining a lead time for the in-house production parts;
obtaining first data comprising at least price data and historical lead time data, for each of the ordered parts;
generating a model for generating a predicted lead time for at least one of the final part and the ordered parts, based on the obtained first data; and
optimizing the model based on at least one of fixed costs, inventory costs, ordering costs, backlog costs, and demand loss costs.

### Claim 2 (depends on 1)

The method of claim 1, wherein the optimizing the model comprises:
optimizing the model by calculating a solution minimizing the following Equation:
∑
i
∈
ℐ
∑
t
∈
ℋ
∑
u
∈
𝒰
i
f
iu
⁢
p
itu
+
∑
s
∈
𝒮
p
s
(
∑
i
∈
ℐ
∑
t
∈
ℋ
(
h
i
⁢
I
it
s
+
∑
u
∈
𝒰
i
υ
iu
⁢
Q
itu
)
+
(
∑
t
=
1
T
-
1
b
i
·
B
t
s
+
e
i
·
B
T
s
)
)
wherein the first term (fiupitu) refers to a fixed cost component, and comprises the fixed cost (fiu) when product i is procured from supplier u, and the contract initiation status (pitu) with supplier u in period t regarding product i,
wherein the second term (hilit) refers to an inventory cost component, and comprises the unit inventory cost (hi) for product i and the inventory level (lit) of product i in period t under scenario s,
wherein the third term (viuQitu) refers to an ordering cost component, and comprises the unit production/order cost (viu) when product i is procured from supplier u, and the order quantity (Qitu) of product i from supplier u in period t,
wherein the fourth term·(bi·Bt) refers to a backlog cost component, and comprises the unit backlog cost (bi) for finished product i and the backlog amount (Bt) of finished product i in period t under scenario s,
wherein the fifth term (ei·BT) refers to a demand loss cost component, and comprises the unit demand loss cost (ei) for finished product i and the backlog amount (BT) of finished product i in period T under scenario s.

### Claim 3 (depends on 2)

The method of claim 2, wherein the optimizing the model comprises:
minimizing the Equation considering at least one of the following constraints: number of suppliers, supply quantity, minimum contract duration, maximum contract duration, outsourced component inventory balance, produced component inventory balance, end-item inventory balance, production and ordering capacity, initial inventory, initial backlog, supplier selection, and non-negativity constraints.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
displaying the predicted lead time generated by the model on a user interface.

### Claim 5 (depends on 4)

The method of claim 4, wherein the displaying the predicted lead time on the user interface comprises:
presenting the predicted lead time for the ordered parts over a predetermined period in the form of a graph; and
in response to receiving a user selection of the predicted lead time displayed on the graph, displaying a probability of the predicted lead time as a pop-up in the form of a graph.

### Claim 6 (depends on 1)

The method of claim 1, wherein the generating a model for generating a predicted lead time for at least one of the final part and the ordered parts, based on the obtained first data, comprises:
generating the model by using Sample Average Approximation (SAA) for a lead time scenario in the model,
wherein the lead time scenario comprises a vector representing lead time values for all suppliers of each ordered part.

### Claim 7

A non-transitory computer-readable recording medium, wherein the non-transitory computer-readable recording medium comprises computer-executable instructions, and
the instructions, when executed by a processor, perform operations comprising:
receiving input data from a user;
identifying a final part corresponding to the input data;
identifying one or more components that constitute the final part;
classifying the identified one or more components into in-house production parts, which are produced in-house, and ordered parts, which are procured from suppliers;
determining a lead time for the in-house production parts;
obtaining first data comprising at least price data and historical lead time data, for each of the ordered parts;
generating a model for generating a predicted lead time for at least one of the final part and the ordered parts, based on the obtained first data; and
optimizing the model based on at least one of fixed costs, inventory costs, ordering costs, backlog costs, and demand loss costs.