# US 2025/0147534 A1 · Providing computational resource availability based on power-generation signals

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0147534 A1
- Document ID: US20250147534A1
- Status: Published application
- Kind: A1
- Application number: 19/016,279
- Filed: 2025-01-10
- Published: 2025-05-08
- Earliest claimed: 2018-09-14
- Assignees: Lancium LLC
- Applicants: Lancium LLC
- Inventors: Michael T. MCNAMARA; David J. HENSON; Raymond E. CLINE, JR.
- Web page: https://patentgrep.com/patent/US20250147534A1

## CPC

- G05F 1/66: Regulating electric power
- G05B 15/02: electric
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/18: Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J 2101/20: Dispersed power generation using renewable energy sources
- H02J 2105/425: {the loads being an Information and Communication Technology [ICT] facility}
- H02J 2105/55: according to an economic condition, e.g. tariff-based load management
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Example embodiments for providing computation resource availability based on power-generation signals are presented herein. An embodiment may involve receive information indicative of power-generation economic signals at a first control system and identifying at least one of: (i) a change in a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit. Responsive to the identification, the embodiment involves performing at least one of: (i) adjusting a rate of power use by a flexible datacenter, and (ii) providing an indication of computation resource availability to a second control system. The flexible datacenter may include a behind-the-meter power input system, a power distribution system, and computing systems configured to receive power from the behind-the-meter power input system via the power distribution system.

## Claims

### Claim 1

A method comprising:
receiving, at a first control system, information indicative of a power-generation economic signal, wherein the power-generation economic signal is indicative of power availability or power cost for power from a power source, wherein the power source comprises an electrical grid power source and a behind-the-meter power source, wherein power can be received from either or both of the electrical grid and the behind-the-meter power source;
based on the received information indicative of the power-generation economic signal, performing an identification of, by the first control system, at least one of: (i) a change in value of the power-generation economic signal exceeding a predefined threshold change in value, (ii) a value of the power-generation economic signal being below a predefined lower threshold limit, (iii) a value of the power-generation economic signal being above a predefined upper threshold limit, wherein the power-generation economic signal is based on a comparison of a first price for the electrical grid power relative to a second price for the behind-the-meter power, or (iv) a cost associated with switching from receiving behind-the-meter power to receiving electrical grid power; and
based on the identification, performing: (i) adjusting a rate of power use by a flexible datacenter and (ii) determining and providing an indication of computation resource availability to a second control system,
wherein the flexible datacenter comprises a power input system, a power distribution system, and a plurality of computing systems configured to receive power from the power input system via the power distribution system; and
wherein the adjusting the rate of power use by the flexible datacenter comprises activating or de-activating power to one or more computing systems of the plurality of computing systems based on the identification, and wherein the indication of computation resource availability is based on activating or deactivating the power to the one or more computing systems.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first control system comprises a datacenter control system collocated with the flexible datacenter.

### Claim 3 (depends on 2)

The method of claim 2, wherein the first control system is configured to receive power from a power grid.

### Claim 4 (depends on 2)

The method of claim 2 wherein the first control system is configured to receive power from a power grid to keep the first control system powered when power to the plurality of computing systems is de-activated.

### Claim 5 (depends on 1)

The method of claim 1, wherein the second control system comprises a datacenter control system collocated with the flexible datacenter and at least one additional flexible datacenter.

### Claim 6 (depends on 5)

The method of claim 5, wherein the second control system is configured to receive power from a power grid.

### Claim 7 (depends on 1)

The method of claim 1, wherein the first control system and the second control system are the same control system.

### Claim 8 (depends on 1)

The method of claim 1, wherein activating or de-activating power to one or more computing systems of the plurality of computing systems comprises adjusting power to one or more computing systems of the plurality of computing systems between a fully operational status and an offline status.

### Claim 9 (depends on 8)

The method of claim 8, wherein in the fully operational status, power is activated to each of the one or more computing systems of the plurality of computing systems.

### Claim 10 (depends on 9)

The method of claim 9, wherein in the offline status, power is deactivated to each of the one or more computing systems of the plurality of computing systems.

### Claim 11 (depends on 10)

The method of claim 10, wherein in the offline status, the first control system remains powered.

### Claim 12 (depends on 1)

The method of claim 1, wherein the power-generation economic signal is based on a cost of power received from a power grid.

### Claim 13 (depends on 1)

The method of claim 1, wherein the power-generation economic signal is based on a purchase price for power associated with the flexible datacenter.

### Claim 14 (depends on 1)

The method of claim 1, wherein the power-generation economic signal is based on a cost associated with selling power from an amount of behind-the-meter power to a power grid.

### Claim 15

A system comprising:
a flexible datacenter comprising:
a power input system,
a power distribution system, and
a plurality of computing systems configured to receive power from the power input system via the power distribution system; and
a first control system configured to:
receive information indicative of a power-generation economic signal, wherein the power-generation economic signal is indicative of power availability or power cost for power from a power source, wherein the power source comprises an electrical grid power source and a behind-the-meter power source, wherein power can be received from either or both of the electrical grid and the behind-the-meter power source;
based on the received information indicative of the power-generation economic signal, performing an identification of at least one of:
(i) a change in value of the power-generation economic signal exceeding a predefined threshold change in value,
(ii) a value of the power-generation economic signal being below a predefined lower threshold limit,
(iii) a value of the power-generation economic signal being above a predefined upper threshold limit, wherein the power-generation economic signal is based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power; or
(iv) a cost associated with switching from receiving behind-the-meter power to receiving electrical grid power
based on the identification, perform:
(i) adjusting a rate of power use by a flexible datacenter comprising a plurality of computing systems, and
(ii) determining and providing an indication of computation resource availability to a second control system;
wherein the adjusting the rate of power use by the flexible datacenter comprises activating or de-activating power to one or more computing systems of the plurality of computing systems based on the identification, and wherein the indication of computation resource availability is based on activating or deactivating the power to the one or more computing systems.

### Claim 16 (depends on 15)

The system of claim 15, wherein the first control system comprises a remote master control system located remote from the flexible datacenter.

### Claim 17 (depends on 15)

The system of claim 15, wherein activating or de-activating power to one or more computing systems of the plurality of computing systems comprises adjusting power to one or more computing systems of the plurality of computing systems between a fully operational status and an offline status, wherein in the fully operational status, power is activated to each of the one or more of the plurality of computing systems, and wherein in the offline status, power is deactivated to each of the one or more of the plurality of computing systems.

### Claim 18 (depends on 17)

The system of claim 17, wherein in the offline status, the first control system remains powered.

### Claim 19 (depends on 15)

The system of claim 15, wherein the power-generation economic signal is based on a purchase price for power associated with the flexible datacenter.

### Claim 20

A non-transitory computer-readable medium configured to store instructions, that when executed by one or more processors, cause a control system to perform functions comprising:
receiving information indicative of a power-generation economic signal, wherein the power-generation economic signal is indicative of power availability or power cost for power from a power source, wherein the power source comprises an electrical grid power source and a behind-the-meter power source, wherein power can be received from either or both of the electrical grid and the behind-the-meter power source;
based on the received information indicative of the power-generation economic signal, performing an identification of at least one of:
(i) a change in value of the power-generation economic signal that exceeds a predefined threshold change in value,
(ii) a value of the power-generation economic signal that is below a predefined lower threshold limit, or
(iii) a value of the power-generation economic signal that is above a predefined upper threshold limit, wherein the power-generation economic signal is based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power; or
(iv) a cost associated with switching from receiving behind-the-meter power to receiving electrical grid power
based on the identification, performing:
(i) adjusting a rate of power use by a flexible datacenter, and
(ii) determining and providing an indication of computation resource availability to a second control system,
wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system;
wherein adjusting a rate of power use by the flexible datacenter comprises activating or de-activating power to one or more computing systems of the plurality of computing systems based on the identification, and wherein the indication of computation resource availability is based on activating or deactivating the power to the one or more computing systems.