# US 2025/0147501 A1 · Employing a batch model in root cause analysis of industrial batch performance analytics

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0147501 A1
- Document ID: US20250147501A1
- Status: Published application
- Kind: A1
- Application number: 18/503,866
- Filed: 2023-11-07
- Published: 2025-05-08
- Earliest claimed: 2023-11-07
- Assignees: Rockwell Automation Technologies, Inc.
- Applicants: Rockwell Automation Technologies, Inc.
- Inventors: Dennis J. Luo; Meiling He; Justice Darko; Ishit Patni; Fatime Ly Seymour; Francisco P. Maturana
- Web page: https://patentgrep.com/patent/US20250147501A1

## CPC

- G05B 23/0224: {Process history based detection method, e.g. whereby history implies the availability of large amounts of data}
- G05B 23/024: {Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks}
- G05B 23/027: {Alarm generation, e.g. communication protocol; Forms of alarm}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method may include receiving, via a processing system, a selection of a first dataset associated with one or more operations of one or more industrial automation components of an industrial system that may perform a batch operation. The method may involve generating an optimized dataset based on the dataset, receiving a second dataset associated with one or more additional operations of one or more additional industrial automation components of an additional industrial system that may perform an additional batch operation, and determining one or more deviations between the optimized dataset and the second dataset. The method may also involve determining a contribution of each of a set of parameters to the one or more deviations and generating a visualization representative of the contribution of each of a set of parameters to the deviation.

## Claims

### Claim 1

A method, comprising:
receiving, via a processing system, a selection of a first dataset associated with one or more operations of one or more industrial automation components of an industrial system configured to perform a batch operation;
generating, via the processing system, an optimized dataset based on the dataset;
receiving, the processing system, a second dataset associated with one or more additional operations of one or more additional industrial automation components of an additional industrial system configured to perform an additional batch operation;
determining, via the processing system, one or more deviations between the optimized dataset and the second dataset;
determining, via the processing system, a contribution of each of a set of parameters to the one or more deviations; and
generating, via the processing system, a visualization representative of the contribution of each of a set of parameters to the deviation.

### Claim 2 (depends on 1)

The method of claim 1, comprising:
receiving, the processing system, feedback associated with at least one of the set of parameters;
generating, via the processing system, one or more commands for the one or more industrial automation components based on the feedback; and
sending, via the processing system, the one or more commands to the one or more industrial automation components.

### Claim 3 (depends on 2)

The method of claim 2, comprising receiving the feedback via a user input.

### Claim 4 (depends on 1)

The method of claim 1, wherein the optimized dataset is generated by normalizing the dataset.

### Claim 5 (depends on 4)

The method of claim 4, wherein the optimized dataset corresponds to a normal distribution that is normalized based on a mean of the dataset and a standard deviation of the dataset.

### Claim 6 (depends on 5)

The method of claim 5, wherein the optimized dataset is normalized based on a minimum and a maximum of the dataset in response to the dataset deviating from the normal distribution.

### Claim 7 (depends on 1)

The method of claim 1, wherein the contribution of each of the set of parameters to the one or more deviations is determined based on an adjusted symmetric mean absolute percentage.

### Claim 8

A non-transitory computer-readable medium comprising computer-executable instructions that, when executed, are configured to cause a processing system to perform operations comprising:
receiving a selection of a first dataset associated with one or more operations of one or more industrial automation components of an industrial system configured to perform a batch operation;
generating an optimized dataset based on the dataset;
receiving a second dataset associated with one or more additional operations of one or more additional industrial automation components of an additional industrial system configured to perform an additional batch operation;
determining one or more deviations between the optimized dataset and the second dataset;
determining a contribution of each of a set of parameters to the one or more deviations; and
generating a visualization representative of the contribution of each of a set of parameters to the deviation.

### Claim 9 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the operations comprise:
receiving feedback associated with at least one of the set of parameters;
generating one or more commands for the one or more industrial automation components based on the feedback; and
sending the one or more commands to the one or more industrial automation components.

### Claim 10 (depends on 9)

The non-transitory computer-readable medium of claim 9, wherein the operations comprise receiving the feedback via a user input.

### Claim 11 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the optimized dataset is generated by normalizing the dataset.

### Claim 12 (depends on 11)

The non-transitory computer-readable medium of claim 11, wherein the optimized dataset corresponds to a normal distribution that is normalized based on a mean of the dataset and a standard deviation of the dataset.

### Claim 13 (depends on 12)

The non-transitory computer-readable medium of claim 12, wherein the optimized dataset is normalized based on a minimum and a maximum of the dataset in response to the dataset deviating from the normal distribution.

### Claim 14 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the contribution of each of the set of parameters to the one or more deviations is determined based on an adjusted symmetric mean absolute percentage.

### Claim 15

A system, comprising:
one or more industrial automation components of an industrial system configured to perform a batch operation; and
a processing system configured to perform operations comprising:
receiving a selection of a first dataset associated with one or more operations of one or more industrial automation components of an industrial system configured to perform a batch operation;
generating an optimized dataset based on the dataset;
receiving a second dataset associated with one or more additional operations of one or more additional industrial automation components of an additional industrial system configured to perform an additional batch operation;
determining one or more deviations between the optimized dataset and the second dataset;
determining a contribution of each of a set of parameters to the one or more deviations; and
generating a visualization representative of the contribution of each of a set of parameters to the deviation.

### Claim 16 (depends on 15)

The system of claim 15, wherein the operations comprise:
receiving feedback associated with at least one of the set of parameters;
generating one or more commands for the one or more industrial automation components based on the feedback; and
sending the one or more commands to the one or more industrial automation components.

### Claim 17 (depends on 16)

The system of claim 16, wherein the operations comprise receiving the feedback via a user input.

### Claim 18 (depends on 15)

The system of claim 15, wherein the optimized dataset is generated by normalizing the dataset.

### Claim 19 (depends on 18)

The system of claim 18, wherein the optimized dataset corresponds to a normal distribution that is normalized based on a mean of the dataset and a standard deviation of the dataset.

### Claim 20 (depends on 19)

The system of claim 19, wherein the optimized dataset is normalized based on a minimum and a maximum of the dataset in response to the dataset deviating from the normal distribution.
