# US 2025/0146387 A1 · Methods and systems for installing tubulars in wells

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0146387 A1
- Document ID: US20250146387A1
- Status: Published application
- Kind: A1
- Application number: 18/941,974
- Filed: 2024-11-08
- Published: 2025-05-08
- Earliest claimed: 2023-11-08
- Assignees: GreenFire Energy Inc.
- Applicants: GreenFire Energy Inc.
- Inventors: Greg Szutiak; John R. Muir; Alan D. Eastman; Joseph A. Scherer
- Web page: https://patentgrep.com/patent/US20250146387A1

## CPC

- E21B 19/165: {Control or monitoring arrangements therefor}
- E21B 43/10: Setting of casings, screens, liners {or the like} in wells
- E21B 19/161: {using a wrench or a spinner adapted to engage a circular section of pipe (E21B19/168 takes precedence)}
- E21B 19/20: Combined feeding from rack and connecting, e.g. automatically
- F03G 4/001: {Binary cycle plants where the source fluid from the geothermal collector heats the working fluid via a heat exchanger}
- F03G 4/029: {closed loop geothermal collectors, i.e. the fluid is pumped through a closed loop in heat exchange with the geothermal source, e.g. via a heat exchanger}
- F24T 10/15: using bent tubes; using tubes assembled with connectors or with return headers
- F24T 10/17: using tubes closed at one end, i.e. return-type tubes
- F24T 2010/53: {Methods for installation}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- F03G: SPRING, WEIGHT, INERTIA OR LIKE MOTORS; MECHANICAL-POWER PRODUCING DEVICES OR MECHANISMS, NOT OTHERWISE PROVIDED FOR OR USING ENERGY SOURCES NOT OTHERWISE PROVIDED FOR (arrangements in connection with power supply in vehicles from force of nature B60K16/00; electric propulsion with power supply in vehicles from force of nature B60L8/00)
- F24T: GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS

## Abstract

A system may include a handling mast, a tubular source stack, a tubing loader, a spider device, and a connection device. The tubing loader is configured to capture a first HVT from the tubular source stack, load the first HVT into the handling mast, capture a second HVT from the tubular source stack, and load the second HVT into the handling mast. The spider device is configured to grasp the first HVT. The connection device is configured to align a proximal end of the first HVT and a distal end of the second HVT and couple the first HVT and the second HVT to form a tubing string. The handling mast is configured to insert the tubing string into the wellbore.

## Claims

### Claim 1

A system for installing high-value tubulars (HVT) in a wellbore, the system comprising:
a specialized tubing insertion rig (STIR) configured to handle a plurality of HVT so as not to damage each of the plurality of HVT and insert the plurality of HVT in the wellbore, wherein the STIR comprises:
a handling mast,
a tubular source stack, configured to store the plurality of HVT, and
a tubing loader configured to:
capture a first HVT from the tubular source stack;
load the first HVT into the handling mast;
capture a second HVT from the tubular source stack; and
load the second HVT into the handling mast,
wherein the handling mast is configured to insert a downhole heat exchanger and the first HVT into the wellbore;
a spider device configured to grasp the first HVT so that the first HVT is suspended at least partially within the wellbore by the spider device; and
a connection device configured to:
align a proximal end of the first HVT and a distal end of the second HVT; and
couple a first portion of a fastening component of the proximal end of the first HVT and a second portion of the fastening component of the distal end of the second HVT to form a tubing string, wherein the STIR is configured to insert the tubing string into the wellbore; and
a control system configured to:
determine a number of rotations of the proximal end of the second HVT during coupling of each HVT;
determine if a torque experienced between the proximal end of the first HVT and the distal end of the second HVT is greater than a preset torque threshold.

### Claim 2 (depends on 1)

The system of claim 1,
wherein each of the plurality of HVT comprises an axial length that is greater than 30 ft in length,
wherein the STIR is configured to insert the plurality of HVT having the axial length into the wellbore.

### Claim 3 (depends on 1)

The system of claim 1,
wherein each of the plurality of HVT comprises an outer portion,
wherein the STIR is configured to handle gently each of the HVT so as not to damage the outer portion.

### Claim 4 (depends on 1)

The system of claim 1, wherein the handling mast comprises:
a tubular running tool configured to capture each of the first HVT and the second HVT; and
a winch configured to raise and lower the tubular running tool.

### Claim 5 (depends on 1)

The system of claim 1,
wherein the STIR includes an uphole pump,
wherein the system is configured to insert the tubing string while pumping water, using the uphole pump, through the tubing string.

### Claim 6 (depends on 1)

The system of claim 1, wherein the connection device comprises a power tong configured to rotate the second HVT to couple the second HVT to the first HVT.

### Claim 7 (depends on 1)

The system of claim 1, wherein the HVT comprises a vacuum-insulated tubular.

### Claim 8 (depends on 1)

The system of claim 1, wherein the control system is configured to control tubing insertion operations automatically.

### Claim 9 (depends on 1)

The system of claim 1, wherein the STIR is configured to use electrical power distributed from a local power station.

### Claim 10

A method for installing high-value tubulars (HVT) in a wellbore penetrating a source formation, the method comprising:
placing a specialized tubing insertion rig (STIR) at a well site including the wellbore,
wherein the STIR is configured to handle a plurality of HVT so as not to damage each of the plurality of HVT and insert the plurality of HVT in the wellbore, wherein the plurality of HVT comprises a first HVT and a second HVT;
capturing, using a tubing loader, the first HVT from a tubular source stack,
wherein each of the plurality of HVT comprises a distal end and a proximal end,
wherein each distal end comprises a first portion of a fastening component and each proximal end comprises a second portion of the fastening component;
loading, using the tubing loader, the first HVT into a handling mast;
disposing a downhole heat exchanger on the distal end of the first HVT;
inserting, using the handling mast, the downhole heat exchanger and the first HVT into the wellbore,
wherein the first HVT is inserted with the distal end inserted first and is inserted until the proximal end is positioned adjacent to a spider device configured to grasp each HVT;
grasping, using the spider device, the first HVT so that the first HVT is supported at least partially within the wellbore by the spider device;
capturing, using the tubing loader, the second HVT from the tubular source stack,
loading, using the tubing loader, the second HVT into the handling mast;
aligning, using a connection device, the proximal end of the first HVT and the distal end of the second HVT;
coupling, using the connection device, the first portion of the fastening component of the proximal end of the first HVT and the second portion of the fastening component of the distal end of the second HVT to form a tubing string;
determining a number of rotations of the proximal end of the second HVT during coupling of each HVT;
determining if a torque experienced between the proximal end of the first HVT and the distal end of the second HVT is greater than a preset torque threshold; and
inserting, using the handling mast, the tubing string into the wellbore if the torque is not greater than the preset torque threshold.

### Claim 11 (depends on 10)

The method of claim 10,
wherein each of the plurality of HVT comprises an outer portion, the method further comprising:
handling gently each of the HVT so as not to damage the outer portion.

### Claim 12 (depends on 10)

The method of claim 10, wherein the handling mast comprises:
a tubular running tool configured to capture each of the first HVT and the second HVT; and
a winch configured to raise and lower the tubular running tool.

### Claim 13 (depends on 10)

The method of claim 10,
wherein the STIR includes an uphole pump,
wherein inserting the tubing string comprises inserting the tubing string while pumping water, using the uphole pump, through the tubing string.

### Claim 14 (depends on 10)

The method of claim 10,
wherein the connection device comprises a power tong configured to rotate the second HVT,
wherein the method further comprises rotating, using the power tong, the second HVT in order to couple the second HVT to the first HVT.

### Claim 15 (depends on 10)

The method of claim 10, wherein the HVT comprises a vacuum-insulated tubular.

### Claim 16 (depends on 10)

The method of claim 10, wherein the STIR is configured to carry out tubing insertion operations automatically using a control system.