# US 2025/0146372 A1 · Evaluation and Control of Influx Circulation During Managed Pressure Drilling Operations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0146372 A1
- Document ID: US20250146372A1
- Status: Published application
- Kind: A1
- Application number: 18/387,291
- Filed: 2023-11-06
- Published: 2025-05-08
- Earliest claimed: 2023-11-06
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Yan Luo; Adan H. Herrera; Muran Han
- Web page: https://patentgrep.com/patent/US20250146372A1

## CPC

- E21B 21/08: Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10)
- E21B 44/06: in response to the flow or pressure of the motive fluid of the drive
- G06F 30/28: using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
- E21B 47/10: Locating fluid leaks, intrusions or movements
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B 2200/22: Fuzzy logic, artificial intelligence, neural networks or the like
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Disclosed embodiments relate to MPD well drilling methods, for example allowing evaluation of whether an influx can safely be circulated out of the system. For example, a simulator can be used with parameter data from the MPD system to estimate in real time whether the influx can be circulated by the MPD system without exceeding equipment limits, and may be flexible enough to address both oil and water-based mud systems. For example, the simulator may use a multi-phase flow model to estimate the maximum pressure and maximum flowrate, which can then be compared to the equipment limits to determine whether or not the influx can be safely circulated by the MPD system. In some embodiments, the simulator can also be run iteratively to allow for optimization of the fluid circulation process. Systems and devices related to such methods are also disclosed.

## Claims

### Claim 1

A method for drilling a well using an MPD system, comprising:
drilling a wellbore using the MPD system;
monitoring, using one or more sensors, one or more operational parameters associated with drilling the wellbore;
responsive to detection of an influx in the MPD system, receiving, at a control system, data regarding size and duration of the detected influx;
receiving, at the control system, data regarding the one or more operational parameter of the MPD system;
using, via the control system, a simulator to estimate a maximum pressure and maximum flowrate for the MPD system using the data;
comparing, via the control system, the maximum pressure and maximum flowrate to equipment limits of the MPD system; and
responsive to comparing the maximum pressure and maximum flowrate to equipment limits, initiating an action in the MPD system;
wherein the influx can be circulated out with the MPD system if the maximum pressure and maximum flowrate are both less than the equipment limits.

### Claim 2 (depends on 1)

The method of claim 1, wherein the simulator uses a multi-phase flow model.

### Claim 3 (depends on 1)

The method of claim 1, wherein the simulator uses a Drift Flux Model (DFM).

### Claim 4 (depends on 2)

The method of the claim 2, wherein the model considers mass conservation of the gas and liquid phases separately and uses a mixture momentum equation.

### Claim 5 (depends on 2)

The method of claim 2, wherein the simulator is effective for both water-based mud (WBM) and oil-based mud (OBM), further comprising selecting the model for the simulator based on mud type.

### Claim 6 (depends on 1)

The method of claim 1, wherein using the simulator to estimate the maximum pressure and maximum flowrate comprises calculating profiles of pressure and flow rate to determine the maximum pressure and maximum flowrate.

### Claim 7 (depends on 1)

The method of claim 1, wherein the one or more operational parameter of the MPD system are selected from the following: bit depth, mud viscosity, mud density, flow rate, and post-influx SBP; and wherein the simulator further uses data regarding the well configuration comprising at least one selected from the following: wellbore diameter, drillstring outer diameter, well temperature, and well inclination.

### Claim 8 (depends on 1)

The method of claim 1, wherein the equipment limits of the MPD drilling system comprise a pressure limit of a casing shoe, a pressure limit of an RCD, and a flowrate limit of a gas separator.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
initiating circulation process or shut-in process based on the comparison; and
responsive to completion of the circulation process, resuming drilling.

### Claim 10 (depends on 1)

The method of claim 1, further comprising:
using the simulator to determine an optimized fluid circulation process, wherein determining an optimized fluid circulation process comprises:
iteratively using the simulator to determine the optimized circulation process; and
responsive to determining the optimized circulation process, initiating a circulation process in the MPD system based on the optimized circulation process.

### Claim 11

A method for drilling a well using an MPD drilling system, comprising:
receiving, at a processor, data regarding one or more parameter of the MPD system;
iteratively using, by the processor, a simulator to determine an optimized circulation process; and
responsive to determining the optimized circulation process, initiating an action in the MPD system based on the optimized circulation process.

### Claim 12 (depends on 11)

The method of claim 11, wherein the simulator uses a multi-phase flow model.

### Claim 13 (depends on 11)

The method of claim 11, wherein the simulator uses a Drift Flux Model (DFM).

### Claim 14 (depends on 12)

The method of claim 12, wherein the simulator is effective for both WBM and OBM, further comprising selecting the model based on mud type.

### Claim 15 (depends on 12)

The method of claim 12, further comprising:
automatically controlling, by the processor, the MPD system to circulate fluid based on the optimized circulation process; and
responsive to circulating fluid, resuming drilling.

### Claim 16 (depends on 12)

The method of claim 12, wherein iteratively using the simulator comprises introducing a different flow rate each iteration.

### Claim 17 (depends on 16)

The method of claim 16, further comprising selecting the optimized circulation process based on maximizing flowrate while maintaining pressure and flowrate below equipment limits.

### Claim 18 (depends on 2)

A programmable storage device having program instructions stored thereon for causing a processor to perform the method of claim 2.

### Claim 19 (depends on 12)

A non-transitory computer-readable medium having program instructions stored thereon for causing a control system to perform the method of claim 12.

### Claim 20 (depends on 3)

An MPD system for drilling a wellbore comprising:
a drillstring disposed in the wellbore;
an RCD configured to seal an annulus of the wellbore;
a choke manifold in fluid communication with the annulus;
a mud pump in fluid communication with the choke manifold and the drillstring;
a drilling fluid handling system, including a gas separator;
one or more sensors configured to sense one or more of the following parameters: influx size, influx duration, drill bit depth, mud viscosity, mud density, flow rate, post-influx SBP, well temperature, and well inclination; and
a control system configured to implement the method of claim 3.
