# US 2025/0146269 A1 · Construction evaluation and production system and methods of use therefor

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0146269 A1
- Document ID: US20250146269A1
- Status: Published application
- Kind: A1
- Application number: 18/934,911
- Filed: 2024-11-01
- Published: 2025-05-08
- Earliest claimed: 2023-11-03
- Assignees: Resia IP Holding, LLC
- Applicants: Resia IP Holding, LLC
- Inventors: Ernesto Lopes; Selma Rabelo
- Web page: https://patentgrep.com/patent/US20250146269A1

## CPC

- E04B 1/34869: {Elements for special technical purposes, e.g. with a sanitary equipment}
- E04B 1/34823: {the supporting structure consisting of concrete}
- G06Q 50/08: Construction
- G06Q 50/165: {Land development}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A construction evaluation and production system and methods of use therefor are disclosed. The method can create test fits for site plans for parcels of land and floor plans for one or more buildings. The method utilizes a plurality of building blocks, which are poured in concrete using metal forms, and prefabricated structures that can be easily transported into the building blocks to facilitate construction of apartment units and common areas comprising such building blocks. The method enables efficient and accelerated construction.

## Claims

### Claim 1

A method of building construction comprising:
selecting a parcel of land;
creating a site plan for one or more buildings on the parcel of land by generating a test-fit of the location, footprint, and number of floors of the one or more buildings;
creating a floor plan for the one or more buildings comprised of at least a first building block and a second building block, wherein each said building block comprises at least one apartment and at least one common area;
providing a first prefabricated structure comprising a plumbing or electrical component for the first building block;
providing a second prefabricated structure comprising a plumbing or electrical component for the second building block;
providing a first metal form corresponding to the first building block at a location corresponding to the first building block on the site plan and the floor plan;
pouring concrete in the first metal form to create the first building block on site;
removing the first metal form;
transporting the first prefabricated structure through an opening in the first building block and into a location corresponding to the floor plan;
connecting the plumbing or electrical component of the first prefabricated structure to a plumbing or electrical component of the first building block on site;
providing a second metal form corresponding to the second building block at a location corresponding to the second building block on the site plan and floor plan;
pouring concrete in the second metal form to create the second building block;
removing the second metal form;
transporting the second prefabricated structure through an opening in the second building block and into a location corresponding to the floor plan; and
connecting the plumbing or electrical component of the second prefabricated structure to a plumbing or electrical component of the second building block on site.

### Claim 2 (depends on 1)

The method according to claim 1 wherein the first prefabricated structure is a bathroom.

### Claim 3 (depends on 1)

The method according to claim 1 wherein the first prefabricated structure is a kitchen.

### Claim 4 (depends on 1)

The method according to claim 1 wherein the first prefabricated structure is an electrical system or a plumbing system.

### Claim 5 (depends on 1)

The method according to claim 1 wherein the first building block comprises at least three apartments and at least one common area.

### Claim 6 (depends on 1)

The method according to claim 1 wherein the first prefabricated structure is slid through the opening in the first building block.

### Claim 7 (depends on 1)

The method according to claim 1 further comprising the step of installing a plurality of prefabricated insulated exterior panels to an exterior of the first building block and the second building block.

### Claim 8 (depends on 1)

The method according to claim 1 wherein one floor of the one or more buildings is a building plate, and wherein the building plate is comprised of the first building block and the second building block.

### Claim 9 (depends on 1)

The method according to claim 1 wherein the first metal form is different from the second metal form.

### Claim 10 (depends on 1)

The method according claim 1 further comprising the steps of:
providing a third prefabricated structure selected from the group consisting of: (i) a bathroom, (ii) a kitchen, (iii) a bedroom, (iv) a closet, (v) a mechanical system, (vi) an electrical system, (vii) a fire protection system, (viii) a sanitation unit, (ix) a plumbing system, (x) a drainage system, and (xi) a prefabricated interior wall; and
transporting the third prefabricated structure through an opening in the first building block and into a location corresponding to the floor plan.