# US 2025/0146244 A1 · Apparatus and method for lifting building foundations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0146244 A1
- Document ID: US20250146244A1
- Status: Published application
- Kind: A1
- Application number: 19/008,776
- Filed: 2025-01-03
- Published: 2025-05-08
- Earliest claimed: 2007-01-15
- Assignees: Pier Tech Systems, LLC
- Applicants: Pier Tech Systems, LLC
- Inventors: Kevin Kaufman
- Web page: https://patentgrep.com/patent/US20250146244A1

## CPC

- E02D 35/00: Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations {(foundations for sinking territories with incorporated means for remedying settlement E02D27/34; lifting or moving buildings E04G23/06)}
- E02D 35/005: {Lowering or lifting of foundation structures}
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

A lift bracket system for lifting a building structure such as a foundation and the like comprising a lift plate having a top surface and a bottom surface, the top surface for insertion under the building structure; a generally cylindrical housing affixed to the lift plate and extending perpendicularly from the top surface and the bottom surface of the lift plate, the housing defining a generally circular opening through the lift plate, the opening being disposed away from the center of the lift plate; and at least one gusset for supporting the lift plate, the gusset having a first end and a second end, the gusset disposed beneath the lift plate, wherein the first end of the gusset is attached to the bottom surface of the lift plate and the second end of the gusset is attached to the housing.

## Claims

### Claim 1

A support pile for a building foundation comprising:
a first elongated metal shaft formed having a diameter and formed openings configured to receive mutually perpendicular first and second fasteners extending across the diameter to complete a connection to a second metal shaft; and
a helical auger affixed to the first elongated metal shaft at a distance from the formed openings to stabilize the support pile at a first below ground location at a building foundation site.

### Claim 2 (depends on 1)

The support pile of claim 1, in combination with the second metal shaft.

### Claim 3 (depends on 2)

The support pile of claim 2, further comprising a support configured to lift or stabilize the building foundation in combination with the first elongated metal shaft, the second metal shaft being provided in the support.

### Claim 4 (depends on 2)

The support pile of claim 2, wherein the second metal shaft is a second elongated metal shaft defining an extension piece having a second diameter and being formed with openings configured to receive mutually perpendicular first and second fasteners extending across the second diameter to complete a connection to a third metal shaft opposite the first elongated metal shaft.

### Claim 5 (depends on 4)

The support pile of claim 4, further comprising a support configured to lift or stabilize the building foundation in combination with the first elongated metal shaft and second elongated metal shaft, the third metal shaft provided in the support.

### Claim 6 (depends on 4)

The support pile of claim 4, wherein the third metal shaft is a third elongated shaft defining an extension piece having a third diameter and being formed with openings configured to receive mutually perpendicular first and second fasteners extending across the third diameter to complete a connection to a fourth metal shaft opposite the second metal shaft.

### Claim 7 (depends on 6)

The support pile of claim 6, further comprising a support for lifting or stabilizing the foundation, the fourth metal shaft provided in the support.

### Claim 8 (depends on 1)

The support pile of claim 1, wherein the first elongated metal shaft is fabricated from iron.

### Claim 9 (depends on 1)

The support pile of claim 1, wherein the first elongated metal shaft has a circular cross section.

### Claim 10 (depends on 1)

The support pile of claim 1, wherein the first elongated metal shaft is filled with a non-metallic substance.

### Claim 11 (depends on 1)

The support pile of claim 1, wherein the first elongated metal shaft includes an enlarged diameter coupler portion, the formed openings comprising a first pair of openings and a second pair of openings formed in the enlarged diameter coupler portion, the first pair of openings and the second pair of openings being axially spaced apart from one another to receive the mutually perpendicular first and second fasteners.

### Claim 12

A support pile for a building foundation comprising:
a first elongated metal shaft formed having a diameter and opposing first and second ends, each of the opposing first and second ends including formed openings configured to receive mutually perpendicular first and second fasteners extending across the diameter to respectively complete a torque transmitting connection at each of the first and second end for rotatably driving the support pile to a below ground elevation on a building foundation site.

### Claim 13 (depends on 12)

The support pile of claim 12, further comprising a second elongated shaft attachable to the first elongated shaft at the first end via the mutually perpendicular first and second fasteners.

### Claim 14 (depends on 13)

The support pile of claim 13, wherein the second elongated shaft includes a helical auger.

### Claim 15 (depends on 12)

The support pile of claim 12, wherein one of the first and second ends includes an enlarged diameter coupler portion and the formed openings includes a first pair of openings and a second pair of openings formed in the enlarged diameter coupler portion, wherein the first pair of openings and the second pair of openings are axially spaced apart from one another to receive the mutually perpendicular first and second fasteners.

### Claim 16 (depends on 12)

The support pile of claim 12, wherein the first elongated metal shaft is fabricated from iron.

### Claim 17 (depends on 12)

The support pile of claim 12, wherein the first elongated metal shaft has a circular cross section.

### Claim 18 (depends on 12)

The support pile of claim 12, wherein the first elongated metal shaft is filled with a non-metallic substance.

### Claim 19 (depends on 12)

The support pile of claim 12, further comprising a support for lifting or stabilizing the foundation, the support attached to the second end.

### Claim 20 (depends on 19)

The support pile of claim 19, wherein the support comprises a lifting bracket assembly.
