# US 2025/0145049 A1 · Battery management device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0145049 A1
- Document ID: US20250145049A1
- Status: Published application
- Kind: A1
- Application number: 18/790,168
- Filed: 2024-07-31
- Published: 2025-05-08
- Earliest claimed: 2023-11-07
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Makoto MURAKAMI
- Web page: https://patentgrep.com/patent/US20250145049A1

## CPC

- B60L 58/12: responding to state of charge [SoC]
- B60L 58/13: Maintaining the SoC within a determined range
- B60L 58/20: having different nominal voltages
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- G01R 31/3842: combining voltage and current measurements
- H02J 7/82: Control of state of charge [SOC]
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

A battery management device for controlling a charge of a battery during parking of a vehicle includes: an acquisition unit that acquires information on a dark current flowing out of the battery every time a predetermined timing comes; a prediction unit that predicts a charge consumed by the battery from a timing of current time to a timing of next time based on the information on the dark current acquired by the acquisition unit; an estimation unit that estimates a charge of the battery when the timing of the next time comes based on the consumed charge of the battery predicted by the prediction unit; and a requesting unit that requests charging of the battery when the charge of the battery estimated by the estimation unit is equal to or less than a predetermined threshold value.

## Claims

### Claim 1

A battery management device that controls a charge of a battery of a vehicle that is parked, the battery management device comprising:
an acquisition unit that acquires information regarding a dark current flowing out of the battery, each time a predetermined timing arrives;
a prediction unit that predicts a charge that is consumed by the battery from a timing of current time until a timing of next time arrives, based on the information regarding the dark current acquired by the acquisition unit;
an estimation unit that estimates a charge of the battery for when the timing of the next time arrives, based on a consumed charge of the battery predicted by the prediction unit; and
a requesting unit that requests charging of the battery when the charge of the battery estimated by the estimation unit is no greater than a predetermined threshold value.

### Claim 2 (depends on 1)

The battery management device according to claim 1, wherein the prediction unit predicts a consumed charge of the battery, from the timing of the current time until the timing of the next time arrives, based on an average value of a plurality of the dark currents acquired in past by the acquisition unit.

### Claim 3 (depends on 1)

The battery management device according to claim 1, wherein the estimation unit estimates the charge of the battery for when the timing of the next time arrives, based on an average value of consumed charges of a plurality of the batteries predicted in past by the prediction unit.

### Claim 4 (depends on 1)

The battery management device according to claim 1, wherein the predetermined timing is determined by a certain cycle.
