Vascular prosthesis for leak prevention during endovascular aneurysm repair
AssigneesThe Texas A&M University System, Shape Memory Medical, Inc.
InventorsDuncan J. Maitland, Todd L. Landsman, John Horn, Landon Nash, Chung Yeh
Life of this patent
Estimating the term…
Abstract
An embodiment includes a process for treating an abdominal aortic aneurysm (AAA) endoleak with a shape memory polymer (SMP) foam device. First, a bifurcated stent graft is placed within the aneurysm while a micro guidewire is positioned within the aneurysm for future catheter access. Second, after placing the iliac graft extension, a catheter is introduced over wire to deliver embolic foams. Third, embolic foams expand and conform to the aneurysm wall. Fourth, embolic foams create a stable thrombus to prevent endoleak formation by isolating peripheral vessels from the aneurysm volume.
Claims2
A method comprising:
- implant a stent graft and a wire within a patient and adjacent one another;
- advance a first conduit over the wire and into the patient;
- insert a second conduit into the first conduit, wherein within the second conduit:
- (a) first, second, and third open-cell, polyurethane, thermoset, shape memory polymer (SMP) foams are simultaneously disposed;
- and (b) the first, second, and third SMP foams are arranged serially with respect to each other and are not fixedly coupled to each other;
- deploy the first SMP foam from the first conduit and into the patient at a first location;
- after deploying the first SMP foam, deploy the second SMP foam from the first conduit and into the patient at a second location;
- and
- after deploying the second SMP foam, deploy the third SMP foam from the first conduit and into the patient at a third location;
- wherein (a)(i) a first plane, orthogonal to a long axis of the first SMP foam, intersects both a proximal half of the first SMP foam and a first metal structure that is coupled to the first SMP foam;
- (a)(ii) an additional first plane, parallel to the first plane, intersects a distal half of the first SMP foam but does not intersect the first metal structure, (b)(i) a second plane, orthogonal to a long axis of the second SMP foam, intersects both a proximal half of the second SMP foam and a second metal structure that is coupled to the second foam;
- (b)(ii) an additional second plane, parallel to the second plane, intersects a distal half of the second SMP foam but does not intersect the second metal structure, (c)(i) a third plane, orthogonal to a long axis of the third SMP foam, intersects both a proximal half of the third SMP foam and a third metal structure that is coupled to the third SMP foam;
- (c)(ii) an additional third plane, parallel to the third plane, intersects a distal half of the third SMP foam but does not intersect the third metal structure.
A system comprising:
- a conduit that simultaneously includes:
- (a) a first open-cell, polyurethane, thermoset, shape memory polymer (SMP) foam;
- (b) a second open-cell, polyurethane, thermoset, SMP foam;
- and (c) a third open-cell, polyurethane, thermoset, SMP foam;
- wherein (a) the first SMP foam includes first and second ends that oppose each other, (b) the second SMP foam includes first and second ends that oppose each other, and (c) the third SMP foam includes first and second ends that oppose each other;
- wherein (a) the first SMP foam includes a first backbone that extends from the first end of the first SMP foam to the second end of the first SMP foam;
- (b) the second SMP foam includes a second backbone that extends from the first end of the second SMP foam to the second end of the second SMP foam;
- (a) the third SMP foam includes a third backbone that extends from the first end of the third SMP foam to the second end of the third SMP foam;
- wherein (a) the first, second, and third SMP foams are not fixedly coupled to each other;
- (b) the first, second, and third SMP foams are configured to deploy from the conduit such that they are not fixedly secured to one another immediately after their collective deployment from the conduit, and (c) the first, second, and third SMP foams are configured to deploy from the conduit in serial fashion such that the first SMP foam deploys from the conduit before the second SMP foam and the second SMP foam deploys form the conduit before the third SMP foam;
- wherein (a) the first backbone includes at least one of platinum, tantalum, iridium, tungsten, or polyurethane, (b) the second backbone includes at least one of platinum, tantalum, iridium, tungsten, or polyurethane, (c) the third backbone includes at least one of platinum, tantalum, iridium, tungsten, or polyurethane;
- wherein (a) the first SMP foam is between 0 and 3 mm in diameter, (b) the second SMP foam is between 0 and 3 mm in diameter, and (c) the third SMP foam is between 0 and 3 mm in diameter.
Dependencies are inferred from the claim text.