# US 2025/0143207 A1 · Intelligent obstacle avoidance method, and mowing robot and storage medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0143207 A1
- Document ID: US20250143207A1
- Status: Published application
- Kind: A1
- Application number: 19/017,281
- Filed: 2025-01-10
- Published: 2025-05-08
- Earliest claimed: 2022-07-11
- Assignees: Shenzhen Mammotion Innovation Co., Limited
- Applicants: Shenzhen Mammotion Innovation Co., Limited
- Inventors: Weifu ZHANG; Ning WANG; Zhenhao HUANG
- Web page: https://patentgrep.com/patent/US20250143207A1

## CPC

- A01D 34/008: {for automated or remotely controlled operation}
- G05D 1/622: Obstacle avoidance (predicting or avoiding probable or impending collision of road vehicles B60W30/08)
- G05D 1/241: Means for detecting physical contact, e.g. touch sensors or bump sensors
- G05D 1/242: Means based on the reflection of waves generated by the vehicle (using passive navigation aids external to the vehicle G05D1/244; using signals provided by artificial sources external to the vehicle G05D1/247)
- G05D 1/633: Dynamic obstacles
- A01D 2101/00: Lawn-mowers
- G05D 2105/15: for harvesting, sowing or mowing in agriculture or forestry
- G05D 2107/23: {Gardens or lawns}
- G05D 2109/10: Land vehicles
- G05D 2111/14: {Non-visible signals, e.g. IR or UV signals}
- A01D: HARVESTING; MOWING
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES

## Abstract

Disclosed in the present disclosure is an intelligent obstacle avoidance method. An obstacle in a current path may be detected; a first obstacle avoidance path is generated with a first parameter based on a detection result, and a mowing robot is controlled to operate; if the obstacle is detected again in the first obstacle avoidance path, a second obstacle avoidance path is generated with a second parameter, and the mowing robot is controlled to operate; and the above steps are repeated until the obstacle is bypassed.

## Claims

### Claim 1

An intelligent obstacle avoidance method, comprising:
detecting an obstacle in a travel path of an autonomous robot;
generating a first obstacle avoidance path with a first parameter based on a detection result, and controlling the mowing robot to operate based on the first obstacle avoidance path;
generating a second obstacle avoidance path with a second parameter, when the obstacle is detected again in the first obstacle path;
controlling the mowing robot to operate based on the second obstacle avoidance path, the second parameter being greater than the first parameter; and
adjusting a parameters of path generation until the obstacles in the travel path are avoided;
wherein after the obstacle is detected again in the first obstacle avoidance path, the method further comprises:
determining whether the obstacle moves when the mowing robot operates based on the first obstacle avoidance path; and
performing the step of generating a second obstacle avoidance path with a second parameter when the obstacle does not move, or
generating a first obstacle avoidance path again with a current position of the mowing robot, and controlling the mowing robot to operate based on the first obstacle avoidance path when the obstacle moves.

### Claim 2 (depends on 1)

The intelligent obstacle avoidance method according to claim 1, wherein the generating the first obstacle avoidance path with the first parameter based on the detection result comprises:
obtaining a characteristic information of the obstacle; and
calculating the first parameter based on the characteristic information of the obstacle, and generating the first obstacle avoidance path along a current mowing direction with the first parameter.

### Claim 3 (depends on 2)

The intelligent obstacle avoidance method according to claim 2, wherein
the calculating the first parameter based on the characteristic information of the obstacle, and generating the first obstacle avoidance path along a current mowing direction with the first parameter comprises:
the characteristic information of the obstacle comprises a horizontal width of the obstacle;
calculating a first length range based on the horizontal width of the obstacle, and
generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range.

### Claim 4 (depends on 3)

The intelligent obstacle avoidance method according to claim 3, wherein the generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range comprises:
determining a side length parameter based on the first length range, and generating a first polyline path along the current mowing direction with the side length parameter.

### Claim 5 (depends on 3)

The intelligent obstacle avoidance method according to claim 3, wherein the generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range comprises:
determining an arc angle parameter and an arc length parameter based on the first length range, and generating a first arc path along the current mowing direction with the arc angle parameter and the arc length parameter.

### Claim 6 (depends on 2)

The intelligent obstacle avoidance method according to claim 2, wherein the generating the second obstacle avoidance path with the second parameter, and controlling the mowing robot to operate based on the second obstacle avoidance path comprises:
updating the characteristic information of the obstacle;
determining the second parameter with an updated characteristic information, and generating the second obstacle avoidance path based on the second parameter; and
controlling the mowing robot to return to a starting point of the first obstacle avoidance path, and controlling the mowing robot to operate based on the second obstacle avoidance path.

### Claim 7 (depends on 1)

The intelligent obstacle avoidance method according to claim 1, wherein the generating a first obstacle avoidance path with the first parameter based on the detection result comprises:
dividing a horizontal angle of the obstacle into a left deflection angle and a right deflection angle along an orientation of the mowing robot;
comparing the left deflection angle with the right deflection angles to determine a deflection direction; and
generating the first obstacle avoidance path based on the deflection direction and the first parameter.

### Claim 8 (depends on 1)

The intelligent obstacle avoidance method according to claim 1, further comprising:
obtaining a number of times the obstacle is detected again in the first obstacle avoidance path; and
generating warning information to prompt a user when the number of times exceeds a preset number of times.

### Claim 9

A mowing robot, comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, wherein the program, when executed by the processor, causes the processor to perform an intelligent obstacle avoidance method, the intelligent obstacle avoidance method comprising:
detecting an obstacle in a travel path of an autonomous robot;
generating a first obstacle avoidance path with a first parameter based on a detection result, and controlling the mowing robot to operate based on the first obstacle avoidance path;
generating a second obstacle avoidance path with a second parameter, when the obstacle is detected again in the first obstacle path;
controlling the mowing robot to operate based on the second obstacle avoidance path, the second parameter being greater than the first parameter; and
adjusting a parameters of path generation until the obstacles in the travel path are avoided;
wherein after the obstacle is detected again in the first obstacle avoidance path, the method further comprises:
determining whether the obstacle moves when the mowing robot operates based on the first obstacle avoidance path; and
performing the step of generating a second obstacle avoidance path with a second parameter when the obstacle does not move, or
generating a first obstacle avoidance path again with a current position of the mowing robot, and controlling the mowing robot to operate based on the first obstacle avoidance path when the obstacle moves.

### Claim 10 (depends on 9)

The mowing robot according to claim 9, wherein the generating the first obstacle avoidance path with the first parameter based on the detection result comprises:
obtaining a characteristic information of the obstacle; and
calculating the first parameter based on the characteristic information of the obstacle, and generating the first obstacle avoidance path along a current mowing direction with the first parameter.

### Claim 11 (depends on 10)

The mowing robot according to claim 10, wherein
the calculating the first parameter based on the characteristic information of the obstacle, and generating the first obstacle avoidance path along a current mowing direction with the first parameter comprises:
the characteristic information of the obstacle comprises a horizontal width of the obstacle;
calculating a first length range based on the horizontal width of the obstacle, and
generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range.

### Claim 12 (depends on 11)

The mowing robot according to claim 11, wherein the generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range comprises:
determining a side length parameter based on the first length range, and generating a first polyline path along the current mowing direction with the side length parameter.

### Claim 13 (depends on 11)

The mowing robot according to claim 11, wherein the generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range comprises:
determining an arc angle parameter and an arc length parameter based on the first length range, and generating a first arc path along the current mowing direction with the arc angle parameter and the arc length parameter.

### Claim 14 (depends on 12)

The mowing robot according to claim 12, wherein the generating the second obstacle avoidance path with the second parameter, and controlling the mowing robot to operate based on the second obstacle avoidance path comprises:
updating the characteristic information of the obstacle;
determining the second parameter with an updated characteristic information, and generating the second obstacle avoidance path based on the second parameter; and
controlling the mowing robot to return to a starting point of the first obstacle avoidance path, and controlling the mowing robot to operate based on the second obstacle avoidance path.

### Claim 15 (depends on 9)

The mowing robot according to claim 9, wherein the generating a first obstacle avoidance path with the first parameter based on the detection result comprises:
dividing a horizontal angle of the obstacle into a left deflection angle and a right deflection angle along an orientation of the mowing robot;
comparing the left deflection angle with the right deflection angles to determine a deflection direction; and
generating the first obstacle avoidance path based on the deflection direction and the first parameter.

### Claim 16 (depends on 9)

The mowing robot according to claim 9, further comprising:
obtaining a number of times the obstacle is detected again in the first obstacle avoidance path; and
generating warning information to prompt a user when the number of times exceeds a preset number of times.

### Claim 17

A non-transitory storage medium storing a computer program, wherein the computer program, when executed by a processor, causes the processor to perform an intelligent obstacle avoidance method, the intelligent obstacle avoidance method comprising:
detecting an obstacle in a travel path of an autonomous robot;
generating a first obstacle avoidance path with a first parameter based on a detection result, and controlling the mowing robot to operate based on the first obstacle avoidance path;
generating a second obstacle avoidance path with a second parameter, when the obstacle is detected again in the first obstacle path;
controlling the mowing robot to operate based on the second obstacle avoidance path, the second parameter being greater than the first parameter; and
adjusting a parameters of path generation until the obstacles in the travel path are avoided;
wherein after the obstacle is detected again in the first obstacle avoidance path, the method further comprises:
determining whether the obstacle moves when the mowing robot operates based on the first obstacle avoidance path; and
performing the step of generating a second obstacle avoidance path with a second parameter when the obstacle does not move, or
generating a first obstacle avoidance path again with a current position of the mowing robot, and controlling the mowing robot to operate based on the first obstacle avoidance path when the obstacle moves.

### Claim 18 (depends on 17)

The non-transitory storage medium according to claim 17, wherein the generating the first obstacle avoidance path with the first parameter based on the detection result comprises:
obtaining a characteristic information of the obstacle; and
calculating the first parameter based on the characteristic information of the obstacle, and generating the first obstacle avoidance path along a current mowing direction with the first parameter.

### Claim 19 (depends on 18)

The non-transitory storage medium according to claim 18, wherein
the calculating the first parameter based on the characteristic information of the obstacle, and generating the first obstacle avoidance path along a current mowing direction with the first parameter comprises:
the characteristic information of the obstacle comprises a horizontal width of the obstacle;
calculating a first length range based on the horizontal width of the obstacle, and
generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range.

### Claim 20 (depends on 19)

The non-transitory storage medium according to claim 19, wherein the generating the first obstacle avoidance path along the current mowing direction that satisfies the first length range comprises:
determining a side length parameter based on the first length range, and generating a first polyline path along the current mowing direction with the side length parameter.
