Network formation for a load control system
AssigneeLutron Technology Company LLC
InventorsAnkit Bhutani, Vidur Garg, Jeffrey S. Hayes, Galen Edgar Knode
Life of this patent
Estimating the term…
Loading patent…
AssigneeLutron Technology Company LLC
InventorsAnkit Bhutani, Vidur Garg, Jeffrey S. Hayes, Galen Edgar Knode
Estimating the term…
A control device may be configured to delay an attachment procedure while attachment messages are being transmitted over the network. The control device may be configured to initiate an attachment procedure with a router device on a network at the end a back-off period of time. The attachment procedure may include transmitting attachment messages (e.g., parent request messages) that enable the control device to transmit and receive messages over the network through the router device. During the back-off period of time, the control device may determine an attachment message is received from another control device on the network. And, if an attachment message (e.g., a parent request messages and/or a link request message) is received from another control device, the control device may increase the back-off period of time (e.g., delaying when the control device initiates its attachment procedure).
A method performed by a router device that is in a first network partition, wherein the router device is assigned an identifier and has end devices that are attached thereto to enable the end devices to transmit and receive messages over the first network partition through the router device, the method comprising:
Dependencies are inferred from the claim text.