Systems and methods for time estimation for machine full
AssigneeDeere & Company
InventorsRyan KIRK, Mayur DEO, Brian RODRIGUEZ
Life of this patent
Estimating the term…
Loading patent…
AssigneeDeere & Company
InventorsRyan KIRK, Mayur DEO, Brian RODRIGUEZ
Estimating the term…
A computer implemented method includes identifying an estimated time until full (ETF) metric indicative of an estimated time it will take until a tank of an agricultural harvester is full, at least to a threshold level, based at least on a yield flow rate metric, a tank capacity metric, a tank fill level metric, a crop moisture metric, an error correction metric, a crop type metric, a temperature metric, a humidity metric, one or more historical yield flow rate metrics and a model; and generating one or more control signals based on the ETF metric. The computer implemented method can further include identifying an estimated full location (EFL) metric, indicative of an estimated location at the worksite at which the tank of the agricultural harvester will be full, at least to the threshold level, based at least on a path metric, a travel speed metric, and the ETF metric.
An agricultural worksite operation system comprising:
A computer implement method comprising:
An agricultural worksite operation system comprising:
Dependencies are inferred from the claim text.