# US 2025/0123897 A1 · Coincident peak avoidance

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0123897 A1
- Document ID: US20250123897A1
- Status: Published application
- Kind: A1
- Application number: 19/000,470
- Filed: 2024-12-23
- Published: 2025-04-17
- Earliest claimed: 2023-07-10
- Assignees: Cipher Technology Inc.
- Applicants: Cipher Technology Inc.
- Inventors: Patrick A. Kelly; Bryan Keller; Reuben Govender; Samy Biyadi; Adam Ziskind
- Web page: https://patentgrep.com/patent/US20250123897A1

## CPC

- G06F 9/505: {considering the load}
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/063: Operations research, analysis or management
- G06Q 30/0202: Market predictions or forecasting for commercial activities
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06Q 30/0283: Price estimation or determination
- G06Q 50/06: Energy or water supply
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Systems and methods are provided for real-time, scalable, systematic, event-based, model-driven operational value optimization for resource sites, such as a data center. A system can receive a plethora of real-time information that impacts the optimization of operations at the resource site. The system can apply some or all of this real-time data to powerful decision-making logic which analyzes various factors gleaned from the real-time information in order to determine a dynamic value optimization for operating the resource site. Methods and systems also provide the ability to adaptively command operation of the resource site (e.g., full curtailment of power and/or compute load, partial curtailment of power and/or compute load, etc.) in a manner that dynamically and in real time optimizes operations. Furthermore, the methods and systems provide a solution that has modularly designed logic and a horizontally designed framework to efficiently support a plethora of applications, even at large-scale.

## Claims

### Claim 1

A computer-implemented method comprising:
receiving inputs associated with real-time state of a power grid;
applying a defined logic to the received inputs to compute a real-time adjusted aggregate demand on the power grid;
determining a defined time interval-to-date peak for adjusted aggregate demand on the power grid; and
responsive to the real-time adjusted aggregate demand rising above a curtailment threshold associated with the defined time interval-to-date peak, performing real-time controls at a resource site to curtail power usage from the power grid.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein performing the real-time controls at the resource site to curtail power usage from the power grid comprises:
fully curtailing power load at the resource site.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, wherein performing the real-time controls at the resource site to curtail power usage from the power grid comprises:
partially curtailing power load at the resource site.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, wherein performing the real-time controls at the resource site to curtail power usage from the power grid comprises:
responsive to predicting that a transition to an available backup power source would be profitable for the resource site, migrating power usage of the resource site to the available backup power source;
responsive to predicting that the transition to the available backup power source would be not be profitable for the resource site, curtailing power load at the resource site; and
responsive to determining no backup power source is available to the resource site, curtailing power load at the resource site.

### Claim 5 (depends on 4)

The computer-implemented method of claim 4, wherein predicting that the transition to the available backup power source would be profitable for the resource site comprises:
receiving second inputs associated with at least one of:
real-time and forecasted operating revenue for the resource site when energized,
real-time and forecasted costs associated with migrating to and using the available backup power source, and
uptime obligations of the resource site; and
applying a second defined logic to the received second inputs to predict that the transition to the available backup power source would be profitable for the resource site.

### Claim 6 (depends on 5)

The computer-implemented method of claim 5, wherein the costs associated with migrating to and using the available backup power source comprise at least one of:
fuel costs for the backup power source;
operation and maintenance costs for the backup power source; and
institution-imposed financial penalties or institution-provided discounts or credits associated with operating the backup power source.

### Claim 7 (depends on 4)

The computer-implemented method of claim 4, further comprising, after performing the real-time controls at the resource site to curtail power usage from the power grid:
responsive to the real-time adjusted aggregate demand falling below an energization threshold associated with the defined time interval-to-date peak, performing real-time controls at the resource site to resume power usage from the power grid.

### Claim 8 (depends on 7)

The computer-implemented method of claim 7, wherein the energization threshold reflects a larger deviation from the defined time interval-to-date peak than the curtailment threshold.

### Claim 9 (depends on 7)

The computer-implemented method of claim 7, wherein performing the real-time controls at the resource site to resume power usage from the power grid comprises at least one of:
energizing power load at the resource site; and
migrating power usage at the resource site from a backup power source to the power grid.

### Claim 10 (depends on 1)

The computer-implemented method of claim 1, further comprising:
predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site;
wherein performing the real-time controls at the resource site to curtail power usage from the power grid is further responsive to predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site.

### Claim 11 (depends on 10)

The computer-implemented method of claim 10, wherein predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site comprises:
predicting operating revenue for the resource site when energized;
predicting a cost of financial penalties or tariffs associated with continuing to use power from the power grid during an ultimate peak for adjusted aggregate demand on the power grid in the defined time interval; and
based on the predicted operating revenue and the predicted cost of financial penalties or tariffs, predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site.

### Claim 12 (depends on 1)

The computer-implemented method of claim 1, further comprising:
predicting that a partial curtailment from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will be profitable for the resource site;
wherein performing the real-time controls at the resource site to curtail power usage from the power grid comprises partially curtailing power usage from the power grid.

### Claim 13 (depends on 12)

The computer-implemented method of claim 12, wherein partially curtailing power usage from the power grid further comprises modifying a compute load at the resource site.

### Claim 14 (depends on 13)

The computer-implemented method of claim 13, wherein modifying the compute load at the resource site comprises pausing model training.

### Claim 15 (depends on 1)

The computer-implemented method of claim 1, wherein the inputs associated with the real-time state of the power grid comprise:
inputs associated with real-time aggregate demand on the power grid;
inputs associated with real-time demand on the power grid from battery charging and recharging; and
inputs associated with real-time importing and exporting of power between the power grid and one or more other power grids.

### Claim 16 (depends on 1)

The computer-implemented method of claim 1, further comprising determining the defined time interval-to-date peak for adjusted aggregate demand on the power grid by:
dynamically receiving inputs associated with real-time state of the power grid during of the defined time interval;
applying the defined logic to the dynamically received inputs to dynamically compute real-time adjusted aggregate demand on the power grid during the defined time interval; and
based on the dynamically computed real-time adjusted aggregate demand on the power grid, dynamically determining one or more defined time interval-to-date peaks for adjusted aggregate demand on the power grid during the defined time interval.

### Claim 17 (depends on 16)

The computer-implemented method of claim 16, further comprising:
dynamically adjusting the association between the curtailment threshold and the defined time interval-to-date peak during the defined time interval based on a predicted likelihood that a contemporaneous defined time interval-to-date peak will be an ultimate peak for adjusted aggregate demand at the end of the time interval.

### Claim 18 (depends on 16)

The computer-implemented method of claim 16, wherein the defined time interval is a month of a year.

### Claim 19 (depends on 1)

The computer-implemented method of claim 1, wherein the curtailment threshold comprises at least one of:
a predetermined percentage of the defined time interval-to-date peak; and
a predetermined power value below the defined time interval-to-date peak.

### Claim 20

A system comprising:
one or more processors; and
memory having instructions stored thereon, which when executed by the one or more processors cause the system to:
receive inputs associated with a real-time state of a power grid;
apply a defined logic to the received inputs to compute a real-time adjusted aggregate demand on the power grid;
determine a defined time interval-to-date peak for adjusted aggregate demand on the power grid; and
responsive to the real-time adjusted aggregate demand rising above a curtailment threshold associated with the defined time interval-to-date peak, performing real-time controls at a resource site to curtail power usage from the power grid, wherein performing the real-time controls at the resource site to curtail power usage from the power grid comprises:
responsive to predicting that a transition to an available backup power source would be profitable for the resource site, migrating power usage of the resource site to the available backup power source,
responsive to predicting that the transition to the available backup power source would be not be profitable for the resource site, curtailing power load at the resource site, and
responsive to determining no backup power source is available to the resource site, curtailing power load at the resource site.

### Claim 21 (depends on 20)

The system of claim 20, wherein the stored instructions, when executed by the one or processors, further cause the system to, after performing the real-time controls at the resource site to curtail power usage from the power grid:
responsive to the real-time adjusted aggregate demand falling below an energization threshold associated with the defined time interval-to-date peak, perform real-time controls at the resource site to resume power usage from the power grid;
wherein the energization threshold reflects a larger deviation from the defined time interval-to-date peak than the curtailment threshold.

### Claim 22

A computer-implemented method comprising:
receiving inputs associated with real-time state of a power grid;
applying a defined logic to the received inputs to compute a real-time adjusted aggregate demand on the power grid;
determine a defined time interval-to-date peak for adjusted aggregate demand on the power grid; and
responsive to the real-time adjusted aggregate demand rising above a curtailment threshold associated with the defined time interval-to-date peak and determining no backup power source is available to a resource site:
performing real-time controls at the resource site to curtail power usage from the power grid in response to predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site, and
continuing to use power from the power grid in response to predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will be profitable for the resource site.

### Claim 23 (depends on 22)

The computer-implemented method of claim 22, wherein predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site comprises:
predicting operating revenue for the resource site when energized;
predicting a cost of financial penalties or tariffs associated with continuing to use power from the power grid during an ultimate peak for adjusted aggregate demand on the power grid in the defined time interval; and
based on the predicted operating revenue and the predicted cost of financial penalties or tariffs, predicting that continuing to use power from the power grid after the real-time adjusted aggregate demand rises above the curtailment threshold will not be profitable for the resource site.