# US 2025/0122783 A1 · System and method for installing tool for use with artificial lift mandrel

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0122783 A1
- Document ID: US20250122783A1
- Status: Published application
- Kind: A1
- Application number: 18/909,832
- Filed: 2024-10-08
- Published: 2025-04-17
- Earliest claimed: 2023-10-12
- Assignees: TRC Services, Inc.
- Applicants: TRC Services, Inc.
- Inventors: Dustin Wayne Lott; Gustavo Pertuz
- Web page: https://patentgrep.com/patent/US20250122783A1

## CPC

- E21B 43/123: {Gas lift valves}
- E21B 43/122: {Gas lift}
- E21B 43/124: {Adaptation of jet-pump systems}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A system used with a gas lift valve on a tubing string in a borehole includes a mandrel assembly and a tool assembly. The mandrel assembly holds the gas lift valve disposed in communication between a through-bore and a borehole port. The mandrel assembly couples to the tubing string and defines a lock profile, an uphole seal bore profile, and a downhole seal bore profile. The tool assembly is configured to retrievably deploy in the tubing string. The tool assembly has a lock, an uphole seal, an auxiliary tool, and a downhole seal. The lock is releasably engageable with the lock profile, and the uphole and downhole seals are sealably engageable respectively with the seal bore profiles. The auxiliary tool, which can be a jet pump or a venturi device, has an annulus port that communicates with an annular area of the throughbore sealed by the uphole and downhole seals.

## Claims

### Claim 1

An artificial lift system for use on a tubing string in a borehole, the artificial lift system comprising:
a mandrel assembly having an uphole end and a downhole end, the uphole end of the mandrel assembly being configured to couple to the tubing string, the downhole end of the mandrel assembly being configured to couple to the tubing string, the mandrel assembly defining a throughbore and defining a borehole port, the throughbore extending between the uphole end and the downhole end, the borehole port communicating outside the mandrel assembly, the mandrel assembly being configured to hold a gas lift valve, the gas lift valve being associated with the borehole port and being configured to control fluid communication between the throughbore and the borehole, the throughbore defining a lock profile, an uphole seal bore profile toward the uphole end, and a downhole seal bore profile toward the downhole end; and
a tool assembly being configured to retrievably deploy in the tubing string, the tool assembly having a lock, an uphole seal, an auxiliary tool, and a downhole seal, the lock being releasably engageable with the lock profile, the uphole seal being sealably engageable with the uphole seal bore profile, the downhole seal being sealably engageable with the downhole seal bore profile, the auxiliary tool having at least one annulus port configured to communicate with an annular area of the throughbore sealed by the uphole seal and the downhole seal.

### Claim 2 (depends on 1)

The artificial lift system of claim 1, wherein the mandrel assembly comprises a mandrel defining a side pocket communicating with the throughbore of the mandrel assembly, the side pocket defining the borehole port and being configured to hold the gas lift valve therein, the gas lift valve being configured to control fluid communication between the borehole port and the annular area of the throughbore.

### Claim 3 (depends on 1)

The artificial lift system of claim 1, wherein the mandrel assembly comprises a mandrel defining an external pocket communicating with the borehole port of the mandrel assembly, the borehole port communicating with the annular area of the throughbore, the external pocket being configured to hold the gas lift valve therein, the gas lift valve being configured to control fluid communication between the borehole and the borehole port.

### Claim 4 (depends on 1)

The artificial lift system of claim 1, wherein the mandrel assembly comprises:
a mandrel having a first end and a second end and defining an intermediate bore of the throughbore of the mandrel assembly, the mandrel defining the borehole port;
an uphole component disposed at the uphole end of the mandrel assembly and being configured to couple between the tubing string and the first end of the mandrel, the uphole component having an uphole bore of the throughbore in which the lock profile and the uphole seal bore profile are defined; and
a downhole component disposed at the downhole end of the mandrel assembly and being configured to couple between the tubing string and the second end of the mandrel, the downhole component having a downhole bore of the throughbore in which the downhole seal bore profile is defined.

### Claim 5 (depends on 1)

The artificial lift system of claim 1, wherein the auxiliary tool comprises at least one of a jet pump, a supersonic tool, and a venturi device.

### Claim 6 (depends on 1)

The artificial lift system of claim 1, wherein the auxiliary tool comprises:
an intake in fluid communication with the tubing string downhole of the downhole seal, the intake defining a throat;
a nozzle disposed in the intake, the nozzle having an inlet and an outlet, the inlet disposed in fluid communication with the at least one annulus port of the auxiliary tool, the outlet disposed in fluid communication with the throat of the intake;
a mixing tube disposed in fluid communication with the throat of the intake; and
a diffuser disposed in fluid communication with the mixing tube, the diffuser having an output disposed in fluid communication with the tubing string uphole of the uphole seal.

### Claim 7 (depends on 1)

The artificial lift system of claim 1, wherein the mandrel assembly comprises a landing nipple having the lock profile; and wherein the tool assembly comprises a lock mandrel having the lock.

### Claim 8 (depends on 1)

The artificial lift system of claim 1, wherein the lock comprises at least one of: a dog, a key, a collet, and a ring being selectively movable between locked and unlocked conditions.

### Claim 9 (depends on 1)

The artificial lift system of claim 1, wherein each of the uphole seal and the downhole seal comprises at least one of: an elastomeric ring, a chevron seal, and a cup seal disposed about the mandrel assembly.

### Claim 10

An assembly for use with a gas lift valve on a tubing string in a borehole, the assembly comprising:
a body having an uphole end and a downhole end, the body defining a throughbore and defining borehole port, the throughbore extending between the uphole end and the downhole end, the body being configured to hold the gas lift valve associated with the borehole port such that the gas lift valve is configured to control fluid communication between the throughbore and the borehole,
the uphole end of the body being configured to couple to the tubing string,
the downhole end of the body being configured to couple to the tubing string,
the throughbore defining a lock profile, an uphole seal bore profile toward the uphole end, and a downhole seal bore profile toward the downhole end.

### Claim 11 (depends on 10)

The assembly of claim 10, wherein the body comprises:
a mandrel having a first end and a second end, the mandrel defining an intermediate bore of the throughbore and defining borehole port, the intermediate bore extending between the first end and the second end, the mandrel being configured to hold the gas lift valve;
at least one uphole component being configured to couple between the first end of the mandrel and the tubing string, the at least one uphole component defining an uphole bore of the throughbore communicating with the intermediate bore of the mandrel, the uphole bore defining the lock profile and defining the uphole seal bore profile; and
at least one downhole component being configured to couple between the second end of the mandrel and the tubing string, the at least one downhole component defining a downhole bore of the throughbore communicating with the intermediate bore of the mandrel, the downhole bore defining the downhole seal bore profile.

### Claim 12

A method of performing gas lift on a tubing string in a borehole, the method comprising:
deploying a mandrel assembly on the tubing string in the borehole, the mandrel assembly being configured to hold the gas lift valve; and
removably installing a tool assembly in a throughbore of the mandrel assembly adjacent the gas lift valve by:
sealing at least one annulus port of the tool assembly with the gas lift valve; and
releasably engaging a lock on the tool assembly with a lock profile defined inside the throughbore of the mandrel assembly.

### Claim 13 (depends on 12)

The method of claim 12, wherein sealing the at least one annulus port of the tool assembly with the gas lift valve comprises:
sealably engaging a downhole seal on the tool assembly with a downhole seal bore profile defined inside the throughbore toward a downhole end of the mandrel assembly; and
sealably engaging an uphole seal on the tool assembly with an uphole seal bore profile defined inside the throughbore toward an uphole end of the mandrel assembly.

### Claim 14 (depends on 12)

The method of claim 12, further comprising injecting gas into an annulus between the tubing string and the borehole; and controlling communication of the injected gas through the gas lift valve to the at least one annulus port of the tool assembly.

### Claim 15 (depends on 14)

The method of claim 14, further comprising:
intaking production fluid into an intake of the tool assembly from the tubing string downhole of the downhole seal;
inletting the injected gas into the at least one annulus port of the tool assembly;
jetting the injected gas at the at least one annulus port from an outlet of a nozzle to a throat of the intake;
mixing the jetted gas and the production fluid in a mixing tube disposed in fluid communication with the throat of the intake; and
diffusing the mixed gas and the production fluid from the mixing tube in a diffuser to an output in fluid communication with the tubing string uphole of the uphole seal.

### Claim 16 (depends on 12)

The method of claim 12, wherein removably installing the tool assembly in the throughbore of the mandrel assembly adjacent the gas lift valve comprises running the tool assembly on at least one of a slickline and a wireline in the tubing and operating the lock on the tool assembly.

### Claim 17 (depends on 12)

The method of claim 12, wherein deploying the mandrel assembly on the tubing string in the borehole comprises:
coupling an uphole end and a downhole end of a mandrel body to the tubing, the mandrel body defining the throughbore and defining a borehole port, the throughbore extending between the uphole end and the downhole end, the mandrel body being configured to hold the gas lift valve disposed in communication with the borehole port,
the throughbore defining the lock profile, the uphole seal bore profile toward the uphole end, the downhole seal bore profile toward the downhole end.

### Claim 18 (depends on 12)

The method of claim 12, wherein deploying the mandrel assembly on the tubing string in the borehole comprises:
coupling a first component between a first end of a mandrel and the tubing string;
coupling a second component between a second end of the mandrel and the tubing string,
wherein the mandrel defines an intermediate bore of the throughbore of the mandrel assembly, the mandrel defining a borehole port, the mandrel being configured to hold the gas lift valve disposed in communication with the borehole port;
wherein the first component defines an uphole bore of the throughbore in which the lock profile and the uphole seal bore profile are defined; and
wherein the second component defines a downhole bore of the throughbore in which the downhole seal bore profile is defined.

### Claim 19 (depends on 12)

The method of claim 12, wherein deploying the mandrel assembly on the tubing string in the borehole comprises deploying a plurality of the mandrel assembly on the tubing string; and wherein removably installing the tool assembly in the throughbore of the mandrel assembly comprises selectively installing the tool assembly in any one of the plurality of the mandrel assembly.

### Claim 20 (depends on 12)

The method of claim 12, wherein the method comprises:
initially performing a gas lift operation using the gas lift valve in the mandrel assembly without having the tool assembly installed;
identifying a decline of produced fluid from the gas lift operation; and
in response to the decline, removably installing the tool assembly, and performing a modified gas lift operation using the gas lift valve in the mandrel assembly having the tool assembly installed.
