# US 2025/0119094 A1 · Automated attachment of solar components

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0119094 A1
- Document ID: US20250119094A1
- Status: Published application
- Kind: A1
- Application number: 18/981,012
- Filed: 2024-12-13
- Published: 2025-04-10
- Earliest claimed: 2021-07-13
- Assignees: Array Tech, Inc.
- Applicants: Array Tech, Inc.
- Inventors: Nathan Schuknecht; Lucas Creasy
- Web page: https://patentgrep.com/patent/US20250119094A1

## CPC

- H02S 30/10: Frame structures
- B23P 21/002: {the units stationary whilst being composed}
- F24S 25/65: for coupling adjacent supporting elements, e.g. for connecting profiles together
- H02S 20/00: Supporting structures for PV modules
- H02S 20/30: Supporting structures being movable or adjustable, e.g. for angle adjustment
- F24S 2025/014: {Methods for installing support elements}
- F24S 2025/6005: {by screwed connection}
- F24S 2025/6009: {by deforming the material, e.g. by crimping or clinching}
- F24S 2025/6011: {by welding or brazing}
- Y02E 10/47: Mountings or tracking
- Y02E 10/50: Photovoltaic [PV] energy
- H02S: GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES (obtaining electrical energy from radioactive sources G21H1/12; light sensitive inorganic semiconductor devices H10F; light sensitive organic semiconductor devices H10K30/00; thermoelectric devices H10N10/00; pyroelectric devices H10N15/00)
- B23P: METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS (arrangements for copying or controlling B23Q)
- F24S: SOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS (for producing mechanical power from solar energy F03G6/00)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A method may include positioning one or more PV module mounting devices along a length of a structural component. The method may include specifying one or more parameters related to fastening the PV module mounting devices to the structural component, the one or more parameters indicating a spacing between the PV module mounting devices. The method may include fastening, by an automated attachment equipment, the PV module mounting devices to the structural component based on the specified parameters and moving the PV module mounting devices fastened to the structural component to an assembly platform.

## Claims

### Claim 1

A system for automated attachment of solar components to a torque tube of a single-axis solar tracker, the system comprising:
a first attachment device configured to be positioned on a first side of a torque tube; and
a second attachment device configured to be positioned on a second side of the torque tube, wherein:
the first and second attachment devices are configured to move toward and away from the torque tube, and
the first attachment device is configured to couple a first fastening strip to the first side of the torque tube and the second attachment device is configured to couple a second fastening strip to the second side of the torque tube.

### Claim 2 (depends on 1)

The system of claim 1, further comprising:
a first robotic arm coupled to the first attachment device, the first robotic arm including at least one hinged joint that allows the first attachment device to move toward and away from the torque tube; and
a second robotic arm coupled to the second attachment device, the second robotic arm including at least one hinged joint that allows the second attachment device to move toward and away from the torque tube.

### Claim 3 (depends on 1)

The system of claim 1, further comprising:
a guiding rail secured to at least one of the first and second attachment devices such that the at least one of the first and second attachment devices is configured to move along the guiding rail toward and away from the torque tube.

### Claim 4 (depends on 3)

The system of claim 3, wherein the guiding rail is secured to both the first and second attachment devices such that the first and second attachment devices are configured to move toward and away from each other on opposite sides of the torque tube.

### Claim 5 (depends on 3)

The system of claim 3, further comprising a second guiding rail secured to the first and second attachment devices such that the first and second attachment devices can move along the second guiding rail substantially parallel with the torque tube.

### Claim 6 (depends on 1)

The system of claim 1, wherein the first and second attachment devices are welders that are configured to couple the first and second fastening strips to the first and second sides of the torque tube via welds.

### Claim 7 (depends on 1)

The system of claim 1, wherein the first and second attachment devices are first and second fastener installers that are configured to couple the first and second fastening strips to the first and second sides of the torque tube via fasteners.

### Claim 8 (depends on 7)

The system of claim 7, wherein the first and second fastener installers are drills and the fasteners are screws.

### Claim 9 (depends on 1)

The system of claim 1, wherein the first and second fastening strips are part of a mounting rail.

### Claim 10

A system for automated attachment of solar components to a torque tube of a single-axis solar tracker, the system comprising:
a first attachment device configured to be positioned on a first side of a torque tube;
a second attachment device configured to be positioned on a second side of the torque tube; and
a guiding rail secured to at least one of the first and second attachment devices such that the at least one of the first and second attachment devices is configured to move along the guiding rail toward and away from the torque tube;
wherein, the first attachment device is configured to couple a first fastening strip to the first side of the torque tube and the second attachment device is configured to couple a second fastening strip to the second side of the torque tube.

### Claim 11 (depends on 10)

The system of claim 10, wherein the guiding rail is secured to both the first and second attachment devices such that the first attachment device is configured to move toward and away from the first side of the torque tube and the second attachment device is configured to move toward and away from the second side of the torque tube.

### Claim 12 (depends on 10)

The system of claim 10, wherein the first and second attachment devices are welders that are configured to couple the first and second fastening strips to the first and second sides of the torque tube via welds.

### Claim 13 (depends on 10)

The system of claim 10, wherein the first and second attachment devices are first and second fastener installers that are configured to couple the first and second fastening strips to the first and second sides of the torque tube via fasteners.

### Claim 14 (depends on 13)

The system of claim 13, wherein the first and second fastener installers are drills and the fasteners are screws.

### Claim 15 (depends on 10)

The system of claim 10, further comprising a second guiding rail secured to the first and second attachment devices such that the first and second attachment devices can move along the second guiding rail substantially parallel with the torque tube.

### Claim 16 (depends on 10)

The system of claim 10, wherein the first and second fastening strips are part of a mounting rail.

### Claim 17

A system for automated attachment of solar components to a torque tube of a single-axis solar tracker, the system comprising:
a first attachment device configured to be positioned on a first side of a torque tube;
a second attachment device configured to be positioned on a second side of the torque tube;
a first robotic arm connected to the first attachment device, the first robotic arm including at least one hinged joint that allows the first attachment device to move toward and away from the first side of the torque tube; and
a second robotic arm connected to the second attachment device, the second robotic arm including at least one hinged joint that allows the second attachment device to move toward and away from the second side of the torque tube;
wherein the first attachment device is configured to couple a first fastening strip to the first side of the torque tube and the second attachment device is configured to couple a second fastening strip to the second side of the torque tube.

### Claim 18 (depends on 17)

The system of claim 17, wherein the first and second attachment devices are welders that are configured to couple the first and second fastening strips to the first and second sides of the torque tube via welds.

### Claim 19 (depends on 17)

The system of claim 17, wherein the first and second attachment devices are first and second fastener installers that are configured to couple the first and second fastening strips to the first and second sides of the torque tube via fasteners.

### Claim 20 (depends on 17)

The system of claim 17, wherein the first and second fastening strips are part of a mounting rail.
