# US 2025/0116998 A1 · Machine management method and machine arrangement

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0116998 A1
- Document ID: US20250116998A1
- Status: Published application
- Kind: A1
- Application number: 18/986,842
- Filed: 2024-12-19
- Published: 2025-04-10
- Earliest claimed: 2022-06-28
- Assignees: TRUMPF Werkzeugmaschinen GmbH + Co. KG
- Applicants: TRUMPF Werkzeugmaschinen SE + Co. KG
- Inventors: Korbinian Weiß; Willi Pönitz; Marc Teschner; Jens Ottnad
- Web page: https://patentgrep.com/patent/US20250116998A1

## CPC

- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 50/04: Manufacturing
- G05B 2219/32252: Scheduling production, machining, job shop
- G05B 2219/32335: Use of ann, neural network
- G05B 2219/32423: Task planning
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A machine management method for performing planned activities on a machine is provided. Workpieces are manufactured by the machine according to a predetermined schedule during a respective planned activity of the machine. Manufactured workpieces are sorted from a removal area of the machine into a deposition area during a further respective planned activity of the machine according to the predetermined schedule. The method includes determining a manufacturing time for the workpieces by a machine management system based on manufacturing process data of the machine, determining a removal time for sorting the workpieces by the machine management system based on removal process data, changing the predetermined schedule to obtain a changed schedule for the planned activities by the machine management system based on a comparison of the manufacturing time with the removal time, and transferring the changed schedule to a controller of the machine.

## Claims

### Claim 1

A machine management method for performing planned activities on a machine, wherein workpieces are manufactured by the machine according to a predetermined schedule during a respective planned activity of the machine, and manufactured workpieces are sorted from a removal area of the machine into a deposition area during a further respective planned activity of the machine according to the predetermined schedule, the method comprising:
determining a manufacturing time for the workpieces by a machine management system based on manufacturing process data of the machine,
determining a removal time for sorting the workpieces by the machine management system based on removal process data,
changing the predetermined schedule to obtain a changed schedule for the planned activities by the machine management system based on a comparison of the manufacturing time with the removal time, and
transferring the changed schedule to a controller of the machine.

### Claim 2 (depends on 1)

The machine management method according to claim 1, wherein manufacturing of the workpieces by the machine takes place at a same time as removal of the manufactured workpieces.

### Claim 3 (depends on 2)

The machine management method according to claim 2, wherein the predetermined schedule is changed by adapting the manufacturing time of the machining apparatus to the removal time.

### Claim 4 (depends on 1)

The machine management method according to claim 1, further comprising determining a downtime of the machine and/or a removal device by the machine management system, wherein the machine management system changes the predetermined schedule by adding at least one unplanned activity during the downtime.

### Claim 5 (depends on 4)

The machine management method according to claim 4, wherein the machine management system increases the downtime by temporally shifting successive planned activities of the machine and/or the removal device for performing the at least one added unplanned activity.

### Claim 6 (depends on 4)

The machine management method according to claim 4, wherein the unplanned activity comprises monitoring and/or maintaining a condition of the machine.

### Claim 7 (depends on 4)

The machine management method according to claim 4, wherein the unplanned activity comprises a diagnostic activity, a cleaning activity, a calibration activity, and/or a lubrication activity.

### Claim 8 (depends on 1)

The machine management method according claim 1, wherein the manufacturing process data and/or the removal process data are recorded during operation of the machine and evaluated by the machine management system.

### Claim 9 (depends on 1)

The machine management method according claim 1, further comprising determining a manufacturing time of at least one further machine by the machine management system based on manufacturing process data of the further machine, and determining a removal time of the further machine by the machine management system based on removal process data of the further machine, and wherein the machine management system changes the schedules of the planned activities based on the manufacturing times and the removal times, and transfers the schedules to the controllers of the respective machines.

### Claim 10 (depends on 9)

The machine management method according to claim 9, wherein the machine management system transfers at least one planned activity from the schedule of the machine into the schedule of the further machine as an unplanned activity, and wherein at least one further unplanned activity is added into the schedule of the machine instead of the transferred planned activity.

### Claim 11 (depends on 1)

The machine management method according claim 1, wherein the manufacturing time is determined based on a workpiece material, a workpiece thickness, a workpiece geometry, manufacturing parameters of the machine when manufacturing the workpieces, a condition of a workpiece support, a position of a panel on a pallet changer, an error occurring during manufacturing, and/or a manual interruption during the manufacturing of the workpieces.

### Claim 12 (depends on 1)

The machine management method according claim 1, wherein the removal time is determined based on a workpiece material of the removed workpiece, a workpiece thickness of the removed workpiece, a number of removed workpieces, a number of different workpiece geometries of the removed workpieces, a workpiece geometry, a position of a panel on a pallet changer, a movement sequence of a removal device over the panel during removal of the workpieces, and/or a number of workpiece removals.

### Claim 13 (depends on 1)

The machine management method according claim 1, wherein the machine management system has a self-learning algorithm.

### Claim 14 (depends on 13)

The machine management system according to claim 13, wherein the self-learning algorithm comprises a neural network.

### Claim 15 (depends on 1)

The machine management method according claim 1, wherein the machine management method is adapted for implementation on a flatbed machine tool.

### Claim 16 (depends on 1)

A machine arrangement comprising at least one machine and a machine management system, wherein the machine is configured to manufacture workpieces according to a predetermined schedule, wherein the machine management system is configured to carry out the machine management method according claim 1.

### Claim 17 (depends on 16)

The machine arrangement according to claim 16, wherein the machine is configured as a flatbed machine tool.

### Claim 18 (depends on 16)

The machine arrangement according to claim 16, comprising a plurality of machines.