# US 2025/0097978 A1 · User equipment, base station, and channel access method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0097978 A1
- Document ID: US20250097978A1
- Status: Published application
- Kind: A1
- Application number: 18/293,311
- Filed: 2022-07-29
- Published: 2025-03-20
- Earliest claimed: 2021-07-29
- Assignees: Purplevine Innovation Company Limited
- Applicants: Purplevine Innovation Company Limited
- Inventors: Chun-Che CHIEN
- Web page: https://patentgrep.com/patent/US20250097978A1

## CPC

- H04W 74/04: Scheduled access (hybrid access H04W74/02)
- H04W 16/14: Spectrum sharing arrangements {between different networks}
- H04W 72/1268: of uplink data flows
- H04W 74/006: {in the downlink, i.e. towards the terminal}
- H04W 74/0816: with collision avoidance
- H04W 74/0875: {with assigned priorities based access}
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A user equipment (UE) executes a semi-static channel access method in an unlicensed band. The UE receives a first downlink control information (DCI) within a fixed frame period (FFP), wherein the first DCI is for scheduling uplink (UL) transmissions over one or more FFPs. The UE derives, for each scheduled UL transmission of the scheduled UL transmissions, a channel occupancy time (COT) initiator of the scheduled UL transmission. The UE determines one or more transmission symbols for each of the scheduled UL transmissions according to the derived COT initiator. The UE transmits each of the scheduled UL transmissions in the one or more transmission symbols of the one or more FFPs.

## Claims

### Claim 1

A channel access method in an unlicensed spectrum for execution by a user equipment (UE), comprising:
receiving a first downlink control information (DCI) within a fixed frame period (FFP), wherein the first DCI is for scheduling uplink (UL) transmissions over one or more FFPs;
deriving, for each scheduled UL transmission of the scheduled UL transmissions, a channel occupancy time (COT) initiator of the scheduled UL transmission;
determining one or more transmission symbols for each of the scheduled UL transmissions according to the derived COT initiator; and
transmitting each of the scheduled UL transmissions in the one or more transmission symbols of the one or more FFPs.

### Claim 2 (depends on 1)

The channel access method of claim 1, wherein the deriving the COT initiator of each of the scheduled UL transmissions is based on a first COT initiator indication in the first DCI.

### Claim at position 3

3-5. (canceled)

### Claim 5 (depends on 1)

The channel access method of claim 1, wherein the UL transmissions comprises repetitions of a PUSCH transmission for a single transport block, and the repetitions are one or more nominal repetitions of a PUSCH transmission with repetition type B.

### Claim 6 (depends on 5)

The channel access method of claim 5, wherein the derived COT initiator is the UE, and if a nominal repetition among the one or more nominal repetitions overlaps with an idle period of a COT initiated by the UE, the UE determines one or more symbols of the nominal repetition without overlapping with the idle period as the one or more transmission symbols and segments the nominal repetition into one or more actual repetitions.

### Claim 7 (depends on 5)

The channel access method of claim 5, wherein the derived COT initiator is a base station, and if a nominal repetition among the one or more nominal repetitions overlaps with an idle period of a COT initiated by the base station, the UE determines one or more symbols of the nominal repetition without overlapping with the idle period as the one or more transmission symbols and segments the nominal repetition into one or more actual repetitions.

### Claim 8 (depends on 5)

The channel access method of claim 5, wherein the derived COT initiator is a base station, and if a nominal repetition among the one or more nominal repetitions overlaps with an idle period of a COT initiated by the UE, all of one or more scheduled symbols of the nominal repetition are not transmitted.

### Claim 9

(canceled)

### Claim 10 (depends on 2)

The channel access method of claim 2, wherein the first COT initiator indication is encoded in a channel access field of the first DCI, and a DCI format of the first DCI used for first COT initiator indication includes DCI format 0_0.

### Claim 11

(canceled)

### Claim 12 (depends on 2)

The channel access method of claim 2, wherein the first COT initiator indication is applied to one or more FFPs.

### Claim 13

(canceled)

### Claim 14 (depends on 2)

The channel access method of claim 2, wherein the UE receives a second DCI later than the first DCI, and the second DCI includes a second COT initiator indication for at least one of the UL transmissions scheduled by the first DCI; and
wherein the second COT initiator indicated in the second DCI overwrites at least one of COT initiators indicated in the first COT initiator indication for at least one of the UL transmissions scheduled by the first DCI.

### Claim 15

(canceled)

### Claim 16 (depends on 10)

The channel access method of claim 10, wherein the UE further receives a channel access scheme in the channel access field, the channel access scheme indicates the UE to transmit the scheduled UL transmissions starting at the beginning of a COT immediately after sensing the channel to be idle for at least a sensing slot duration of 9 us.

### Claim 17

(canceled)

### Claim 18 (depends on 1)

The channel access method of claim 1, wherein an initiator of each of the scheduled UL transmissions is not present in the first DCI, and the UE derives a COT initiator for each of the scheduled UL transmissions according to a rule used for configured grant (CG) based COT initiator determination.

### Claim at position 18

19-23. (canceled)

### Claim 24

A channel access method in an unlicensed spectrum for execution by a base station, comprising:
transmitting a first downlink control information (DCI) within a fixed frame period (FFP),
wherein the first DCI is for scheduling uplink (UL) transmissions over one or more FFPs; and
receiving each of scheduled UL transmissions in one or more transmission symbols of one or more FFPs;
wherein the one or more transmission symbols for each scheduled UL transmission of the scheduled UL transmissions are determined according to a channel occupancy time (COT) initiator for the scheduled UL transmission.

### Claim 25 (depends on 24)

The channel access method of claim 24, wherein the COT initiator of each of the scheduled UL transmissions is indicated by a first COT initiator indication in the first DCI.

### Claim at position 21

26-27. (canceled)

### Claim 28 (depends on 25)

The channel access method of claim 25, wherein the UL transmissions comprises repetitions of a PUSCH transmission for a single transport block, the repetitions are one or more nominal repetitions of a PUSCH transmission with repetition type B.

### Claim 29 (depends on 28)

The channel access method of claim 28, wherein the COT initiator is a user equipment (UE), and if a nominal repetition among the one or more nominal repetitions overlaps with an idle period of a COT initiated by the UE, one or more symbols of the nominal repetition without overlapping with the idle period constitute the one or more transmission symbols, and the nominal repetition is segmented into one or more actual repetitions.

### Claim 30 (depends on 28)

The channel access method of claim 28, wherein the COT initiator is the base station, and if a nominal repetition among the one or more nominal repetitions overlaps with an idle period of a COT initiated by the base station, one or more symbols of the nominal repetition without overlapping with the idle period constitute the one or more transmission symbols, and the nominal repetition is segmented into one or more actual repetitions.

### Claim 31 (depends on 28)

The channel access method of claim 28, wherein the COT initiator is the base station, and if a nominal repetition among the one or more nominal repetitions overlaps with an idle period of a COT initiated by a user equipment (UE), all of one or more scheduled symbols of the nominal repetition are not received by the base station.

### Claim 32

(canceled)

### Claim 33 (depends on 25)

The channel access method of claim 25, wherein the first COT initiator indication is encoded in a channel access field of the first DCI, a DCI format of the first DCI used for first COT initiator indication includes DCI format 0_0, and the first COT initiator indication is applied to one or more FFPs.

### Claim at position 28

34-36. (canceled)

### Claim 37 (depends on 25)

The channel access method of claim 25, wherein the base station transmits a second DCI later than the first DCI, and the second DCI includes a second COT initiator indication for at least one of the UL transmissions scheduled by the first DCI; and
wherein the second COT initiator indicated in the second DCI overwrites at least one of COT initiators indicated in the first COT initiator indication for at least one of the UL transmissions scheduled by the first DCI.

### Claim 38

(canceled)

### Claim 39 (depends on 33)

The channel access method of claim 33, wherein a channel access scheme is further indicated in the channel access field, the channel access scheme indicates a user equipment (UE) to transmit the scheduled UL transmissions starting at the beginning of a COT immediately after the UE senses the channel to be idle for at least a sensing slot duration of 9 us.

### Claim at position 32

40-46. (canceled)
