# US 2025/0097731 A1 · Combined high-altitude and terrestrial overshoot detection

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0097731 A1
- Document ID: US20250097731A1
- Status: Published application
- Kind: A1
- Application number: 18/727,792
- Filed: 2022-01-10
- Published: 2025-03-20
- Earliest claimed: 2022-01-10
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget LM Ericsson (publ)
- Inventors: Róbert VASAS; Alexander BIRO; Attila BÁDER
- Web page: https://patentgrep.com/patent/US20250097731A1

## CPC

- H04W 24/02: Arrangements for optimising operational condition
- H04W 24/10: Scheduling measurement reports {; Arrangements for measurement reports}
- H04W 64/00: Locating users or terminals {or network equipment} for network management purposes, e.g. mobility management
- H04W 84/06: Airborne or Satellite Networks (space-based or airborne stations H04B7/185)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

An analytics system performs a high-altitude overshoot detection procedure and a terrestrial overshoot detection procedure. The analytics system detects a plurality of overshooting events occurring within a communication network. Each overshooting event is detected by either the high-altitude overshoot detection procedure or the terrestrial overshoot detection procedure. Responsive to a base station within the communication network being associated with more than a threshold number of the overshooting events, the analytics system configures the base station to use a previous antenna tilt that produced overshooting events at a lower rate relative to a current antenna tilt of the base station.

## Claims

### Claim 1

A method, implemented by an analytics system, the method comprising:
performing a high-altitude overshoot detection procedure and a terrestrial overshoot detection procedure;
detecting a plurality of overshooting events occurring within a communication network, each overshooting event being detected by either the high-altitude overshoot detection procedure or the terrestrial overshoot detection procedure; and
responsive to a base station within the communication network being associated with more than a threshold number of the overshooting events, configuring the base station to use a previous antenna tilt that produced overshooting events at a lower rate relative to a current antenna tilt of the base station.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
performing the terrestrial overshoot detection procedure comprises calculating a distance threshold based on a site-to-site distance between the base station and each of a plurality of other base stations neighboring the base station;
detecting the plurality of overshooting events comprises detecting, by the terrestrial overshooting procedure, an overshooting event associated with the base station; and
detecting, by the terrestrial overshooting procedure, the overshooting event associated with the base station comprises detecting that a user equipment has performed a handover from the base station in excess of the distance threshold.

### Claim 3 (depends on 2)

The method of claim 2, wherein calculating the distance threshold comprises applying a weighting factor to the site-to-site distances based on a geographic density of the base station and the other base stations.

### Claim 4 (depends on 1)

The method of claim 1, wherein calculating the distance threshold comprises calculating an average or mean of the site-to-site distances.

### Claim 5 (depends on 4)

The method of claim 4, wherein calculating the distance threshold further comprises calculating the distance threshold further based on a single-linkage distance between an outlier base station cluster and another base station cluster, the outlier base station cluster comprising the base station and the other base stations.

### Claim 6 (depends on 4)

The method of claim 4, further comprising generating an error report indicating a problem with one or more of the site-to-site distances.

### Claim 7 (depends on 1)

The method of claim 1, wherein:
detecting the plurality of overshooting events comprises detecting, by the high-altitude overshoot detection procedure, an overshooting event associated with the base station;
detecting, by the high-altitude overshoot detection procedure, the overshooting event associated with the base station comprises receiving a measurement report from an aerial user equipment that has exceeded a height threshold configured by the communication network; and
the measurement report indicates a position of the aerial user equipment and a plurality of base stations detected by the aerial user equipment at the position, the base station being comprised in the plurality of base stations and being farther from the aerial user equipment than at least two other of the base stations.

### Claim 8 (depends on 7)

The method of claim 7, wherein detecting, by the high-altitude overshoot detection procedure, the overshooting event associated with the base station further comprises determining from a base station location database that the base station is farther from the aerial user equipment than the at least two other base stations.

### Claim 9 (depends on 7)

The method of claim 7, wherein:
detecting the plurality of overshooting events comprises detecting, by the high-altitude overshoot detection procedure, a further overshooting event associated with a further base station comprised in the plurality of base stations indicated by the measurement report; and
detecting, by the high-altitude overshoot detection procedure, the further overshooting event associated with the further base station comprises determining that the further base station is farther from the aerial user equipment than the at least two other base stations.

### Claim 10 (depends on 1)

The method of claim 1, further comprising generating a report identifying base stations causing the overshooting events occurring within the communication network.

### Claim 11 (depends on 1)

The method of claim 1, further comprising identifying, from historical data, the previous antenna tilt of the base station that produced the overshooting events associated with the base station at the lower rate.

### Claim 12

An analytics system comprising:
processing circuitry and memory circuitry, the memory circuitry containing instructions executable by the processing circuitry such that the analytics system is configured to:
perform a high-altitude overshoot detection procedure and a terrestrial overshoot detection procedure;
detect a plurality of overshooting events occurring within a communication network, each overshooting event being detected by either the high-altitude overshoot detection procedure or the terrestrial overshoot detection procedure; and
responsive to a base station within the communication network being associated with more than a threshold number of the overshooting events, configure the base station to use a previous antenna tilt that produced overshooting events at a lower rate relative to a current antenna tilt of the base station.

### Claim 13 (depends on 12)

The analytics system of claim 12, wherein:
performing the terrestrial overshoot detection procedure comprises calculating a distance threshold based on a site-to-site distance between the base station and each of a plurality of other base stations neighboring the base station;
detecting the plurality of overshooting events comprises detecting, by the terrestrial overshooting procedure, an overshooting event associated with the base station; and
detecting, by the terrestrial overshooting procedure, the overshooting event associated with the base station comprises detecting that a user equipment has performed a handover from the base station in excess of the distance threshold.

### Claim 14

A computer storage medium storing a computer program comprising instructions which, when executed on processing circuitry of an analytics system, cause the processing circuitry to perform a method, the method comprising:
performing a high-altitude overshoot detection procedure and a terrestrial overshoot detection procedure;
detecting a plurality of overshooting events occurring within a communication network, each overshooting event being detected by either the high-altitude overshoot detection procedure or the terrestrial overshoot detection procedure; and
responsive to a base station within the communication network being associated with more than a threshold number of the overshooting events, configuring the base station to use a previous antenna tilt that produced overshooting events at a lower rate relative to a current antenna tilt of the base station.

### Claim 15

(canceled)

### Claim 16 (depends on 2)

The method of claim 2, wherein calculating the distance threshold comprises calculating an average or mean of the site-to-site distances.

### Claim 17 (depends on 16)

The method of claim 16, wherein calculating the distance threshold further comprises calculating the distance threshold further based on a single-linkage distance between an outlier base station cluster and another base station cluster, the outlier base station cluster comprising the base station and the other base stations.

### Claim 18 (depends on 16)

The method of claim 16, further comprising generating an error report indicating a problem with one or more of the site-to-site distances.

### Claim 19 (depends on 2)

The method of claim 2, wherein:
detecting the plurality of overshooting events comprises detecting, by the high-altitude overshoot detection procedure, an overshooting event associated with the base station;
detecting, by the high-altitude overshoot detection procedure, the overshooting event associated with the base station comprises receiving a measurement report from an aerial user equipment that has exceeded a height threshold configured by the communication network; and
the measurement report indicates a position of the aerial user equipment and a plurality of base stations detected by the aerial user equipment at the position, the base station being comprised in the plurality of base stations and being farther from the aerial user equipment than at least two other of the base stations.

### Claim 20 (depends on 19)

The method of claim 19, wherein detecting, by the high-altitude overshoot detection procedure, the overshooting event associated with the base station further comprises determining from a base station location database that the base station is farther from the aerial user equipment than the at least two other base stations.

### Claim 21 (depends on 19)

The method of claim 19, wherein:
detecting the plurality of overshooting events comprises detecting, by the high-altitude overshoot detection procedure, a further overshooting event associated with a further base station comprised in the plurality of base stations indicated by the measurement report; and
detecting, by the high-altitude overshoot detection procedure, the further overshooting event associated with the further base station comprises determining that the further base station is farther from the aerial user equipment than the at least two other base stations.
