# US 2025/0096576 A1 · Predictive control method and system of grid-connected converter based on structurally adaptive extended state observer

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0096576 A1
- Document ID: US20250096576A1
- Status: Published application
- Kind: A1
- Application number: 18/565,518
- Filed: 2023-05-26
- Published: 2025-03-20
- Earliest claimed: 2022-08-15
- Assignees: Shandong University
- Applicants: Shandong University
- Inventors: Zhenbin ZHANG; Oluleke BABAYOMI; Zhen LI; Cungang HU; Zhonggang YIN
- Web page: https://patentgrep.com/patent/US20250096576A1

## CPC

- H02J 3/381: {Dispersed generators}
- H02J 3/002: {Flicker reduction, e.g. compensation of flicker introduced by non-linear load}
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

A predictive control method of a grid-connected converter based on a structurally adaptive extended state observer (ESO) is provided. The method includes: obtaining data of a grid current and a grid voltage and converting the data to data in a dq coordinate system; calculating a selected voltage vector based on a voltage in the dq coordinate system; adaptively inputting the current in the dq coordinate system to a parallel ESO, a cascade ESO, or a hybrid cascade-parallel ESO, so as to obtain a current predicted current value and estimated total disturbance; carrying out a two-step grid current prediction based on the current predicted current value, the estimated total disturbance and the selected voltage vector; and taking minimizing a cost function as a control target, so as to obtain an optimal voltage vector based on a two-step grid current prediction result, and carrying out switching control of the grid-connected converter.

## Claims

### Claim 1

A predictive control method of a grid-connected converter based on a structurally adaptive extended state observer (ESO), comprising:
obtaining data of a grid current and a grid voltage and converting the data to data in a dq coordinate system;
calculating a selected voltage vector based on a voltage in the dq coordinate system;
adaptively inputting a current in the dq coordinate system to a parallel ESO, a cascade ESO, or a hybrid cascade-parallel ESO, so as to obtain a current predicted current value and estimated total disturbance;
carrying out a two-step grid current prediction based on the current predicted current value, the estimated total disturbance and the selected voltage vector;
taking minimizing a cost function as a control target, so as to obtain an optimal voltage vector based on a two-step grid current prediction result, and carrying out switching control of the grid-connected converter;
wherein adaptively inputting the current in the dq coordinate system to a parallel ESO, a cascade ESO, or a hybrid cascade-parallel ESO, so as to obtain a current predicted current value and estimated total disturbance includes:
determining whether a d-axis current component in the dq coordinate system is a starting current or a disturbance current;
if yes, firstly predicting the current predicted current value and the estimated total disturbance by using the parallel ESO according to the current in the dq coordinate system; after ½ cycle, predicting the current predicted current value and the estimated total disturbance by using a hybrid cascade-parallel ESO with a first set bandwidth; after another ½ cycle, predicting the current predicted current value and the estimated total disturbance by using a hybrid cascade-parallel ESO with a second set bandwidth; after another ½ cycle, predicting the current predicted current value and the estimated total disturbance by using the cascade ESO; after setting a delay for a plurality of cycles, returning to obtaining the d-axis current component in the dq coordinate system again;
if not, firstly predicting the current predicted current value and the estimated total disturbance by directly using the cascade ESO according to the current in the dq coordinate system;
wherein carrying out a two-step grid current prediction based on the current predicted current value, the estimated total disturbance and the selected voltage vector includes:
the current predicted current value is a result obtained after adaptively inputting to the parallel ESO, the cascade ESO or the hybrid cascade-parallel ESO, that is, a result obtained in a first prediction step;
a result of a second current prediction step is as follows:
i
^
dq
(
k
+
2
)
=
i
^
dq
(
k
+
1
)
+
T
S
[
∑
j
=
1
3
F
^
j
(
k
+
1
)
+
α
⁢
u
⁡
(
k
)
]
wherein k is sampling instant, Ts is sampling time, {circumflex over (l)}dq(k+1) is the result obtained in the first prediction step and is a predicted estimated value of the grid current at the next sampling instant (k+1), α is a constant control input gain, u(k) is a voltage of the converter caused by a switching state Sabc(k); {circumflex over (F)}j(k+1) represents a predicted disturbance value of the first step at a jth sub-frequency level ω0j, wherein j∈[1,2,3];
wherein taking minimizing a cost function as the control target, so as to obtain the optimal voltage vector, the cost function includes:
J
=
[
i
^
dq
(
k
+
2
)
-
i
dq
*
(
k
+
2
)
]
2
wherein {circumflex over (l)}dq(k+2) is a predicted estimated value of the grid current at sampling instant (k+2), and idq*(k+2) is a reference value of the grid current at the sampling instant (k+2).

### Claim 2 (depends on 1)

The predictive control method of the grid-connected converter based on the structurally adaptive ESO according to claim 1, wherein determining whether a d-axis current component in the dq coordinate system is a starting current or a disturbance current includes:
when the following formula is satisfied, the starting current or disturbance current appears:
Δ
⁢
i
d
⁢
_
⁢
4
=
❘
"\[LeftBracketingBar]"
∫
0
t
⁢
_
⁢
4
⁢
d
dt
⁢
i
d
⁢
d
⁢
τ
❘
"\[RightBracketingBar]"
≥
0.01
i
d
⁢
_
⁢
max
wherein Δid_4 is an absolute change value of the d-axis current id after 4 times of sampling of the d-axis current, t_4=4/Ts and, Ts is the sampling time, and id_max is a maximum d-axis grid current.

### Claim 3 (depends on 1)

The predictive control method of the grid-connected converter based on the structurally adaptive ESO according to claim 1, wherein the hybrid cascade-parallel ESO is as follows:
z
^
1
.
(
t
)
=
F
^
1
(
t
)
+
α
⁢
u
⁡
(
t
)
-
γ
11
(
z
^
1
(
t
)
-
y
⁡
(
t
)
)
⁢
F
^
1
.
(
t
)
=
-
γ
21
(
z
^
1
(
t
)
-
y
⁡
(
t
)
)
⁢
z
^
2
.
(
t
)
=
∑
j
=
1
2
F
^
j
(
t
)
+
α
⁢
u
⁡
(
t
)
-
γ
12
[
z
^
2
(
t
)
-
z
^
1
(
t
)
]
⁢
F
^
2
.
(
t
)
=
-
γ
22
[
z
^
2
(
t
)
-
z
^
1
(
t
)
]
⁢
z
^
3
.
(
t
)
=
∑
j
=
1
3
F
^
j
(
t
)
+
α
⁢
u
⁡
(
t
)
-
γ
13
[
z
^
3
(
t
)
-
z
^
1
(
t
)
]
⁢
F
^
3
.
=
-
γ
23
[
z
^
3
(
t
)
-
z
^
1
(
t
)
]
wherein {circumflex over (ż)}j(t) is a first order derivative of time {circumflex over (z)}j(t), {circumflex over (z)}j(t) is an ESO state variable of an estimated current predicted current {circumflex over (l)}dq,j(t), y(t) is a measured noisy output signal, {γ1j, γ2j} is a gain of an ESO of ESOk, wherein j∈[1,2,3]; ω0= is a total bandwidth of an ESO system, α is a gain of a constant control input; u(t) is a controller input.

### Claim 4 (depends on 1)

The predictive control method of the grid-connected converter based on the structurally adaptive ESO according to claim 1, wherein each switching state voltage of a three-phase two-level grid-connected converter is evaluated in the cost function; and a switching state corresponding to a voltage udq with the minimum value of the cost function is applied as the switching state Sabc of the grid-connected converter.

### Claim 5

A predictive control system of a grid-connected converter based on a structurally adaptive ESO, comprising:
a data obtaining module, configured for obtaining data of a grid current and a grid voltage and converting the data to data in a dq coordinate system;
a voltage vector selecting module, configured for calculating a selected voltage vector based on a voltage in the dq coordinate system;
an adaptive state observing module, configured for adaptively inputting a current in the dq coordinate system to a parallel ESO, a cascade ESO, or a hybrid cascade-parallel ESO, so as to obtain a current predicted current value and estimated total disturbance;
a two-step predicting module, configured for carrying out a two-step grid current prediction based on the current predicted current value, the estimated total disturbance and the selected voltage vector;
a grid-connected converter controlling module, configured for taking minimizing a cost function as a control target, so as to obtain an optimal voltage vector based on a two-step grid current prediction result, and carrying out switching control of the grid-connected converter;
wherein adaptively inputting the current in the dq coordinate system to a parallel ESO, a cascade ESO, or a hybrid cascade-parallel ESO, so as to obtain a current predicted current value and estimated total disturbance includes:
determining whether a d-axis current component in the dq coordinate system is a starting current or a disturbance current;
if yes, firstly predicting the current predicted current value and the estimated total disturbance by using the parallel ESO according to the current in the dq coordinate system; after ½ cycle, predicting the current predicted current value and the estimated total disturbance by using a hybrid cascade-parallel ESO with a first set bandwidth; after another ½ cycle, predicting the current predicted current value and the estimated total disturbance by using a hybrid cascade-parallel ESO with a second set bandwidth; after another ½ cycle, predicting the current predicted current value and the estimated total disturbance by using the cascade ESO; after setting a delay for a plurality of cycles, returning to obtaining the d-axis current component in the dq coordinate system again;
if not, firstly predicting the current predicted current value and the estimated total disturbance by directly using the cascade ESO according to the current in the dq coordinate system;
wherein carrying out a two-step grid current prediction based on the current predicted current value, the estimated total disturbance and the selected voltage vector includes:
the current predicted current value is a result obtained after adaptively inputting to the parallel ESO, the cascade ESO or the hybrid cascade-parallel ESO, that is, a result obtained in a first prediction step;
a result of a second current prediction step is as follows:
i
^
dq
(
k
+
2
)
=
i
^
dq
(
k
+
1
)
+
T
S
[
∑
j
=
1
3
F
^
j
(
k
+
1
)
+
α
⁢
u
⁡
(
k
)
]
wherein k is sampling instant, Ts is sampling time, {circumflex over (l)}dq(k+1) is the result obtained in the first prediction step and is a predicted estimated value of the grid current at the next sampling instant (k+1), α is a constant control input gain, u(k) is a voltage of the converter caused by a switching state Sabc(k); {circumflex over (F)}j(k+1) represents a predicted disturbance value of the first step at a jth sub-frequency level ω0j, wherein j∈[1,2,3];
wherein taking minimizing a cost function as the control target, so as to obtain the optimal voltage vector, the cost function includes:
J
=
[
i
^
dq
(
k
+
2
)
-
i
dq
*
(
k
+
2
)
]
2
wherein {circumflex over (l)}dq(k+2) is a predicted estimated value of the grid current at sampling instant (k+2), and idq*(k+2) is a reference value of the grid current at the sampling instant (k+2).

### Claim 6 (depends on 1)

A terminal device, comprising a processor and a memory, wherein the processor is used to implement a plurality of instructions; and the memory is used to store the plurality of instructions, the plurality of instructions are suitable for being loaded by the processor and executing the predictive control method of the grid-connected converter based on the structurally adaptive ESO according to claim 1.

### Claim 7 (depends on 1)

A computer-readable storage medium in which a plurality of instructions are stored, the plurality of instructions are suitable for being loaded by a processor of a terminal device and executing the predictive control method of the grid-connected converter based on the structurally adaptive ESO according to claim 1.