# US 2025/0096570 A1 · Transmission loss minimization management system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0096570 A1
- Document ID: US20250096570A1
- Status: Published application
- Kind: A1
- Application number: 18/843,221
- Filed: 2023-06-13
- Published: 2025-03-20
- Earliest claimed: 2022-06-13
- Assignees: Standard Energy Inc.
- Applicants: Standard Energy Inc.
- Inventors: Dong Young Lee; Bu Gi Kim
- Web page: https://patentgrep.com/patent/US20250096570A1

## CPC

- H02J 3/32: using batteries or super capacitors with converting means
- B60L 53/64: Optimising energy costs, e.g. responding to electricity rates
- G06N 3/08: Learning methods
- G06Q 50/06: Energy or water supply
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 7/00: Circuit arrangements for charging or discharging batteries or for supplying loads from batteries
- H02J 7/82: Control of state of charge [SOC]
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

The present invention relates to a transmission loss minimization management system and, more specifically, to a transmission loss minimization management system implemented to minimize transmission loss by using an ESS in the transmission process of transmitting power from a power plant or substation to a substation or consumer, and to receive compensation corresponding to transmission loss minimization costs. The system of the present invention enables economical management by means of stable power transmission and thus can charge transmission and relay costs, and has energy environment improving effects such as energy conservation and carbon neutrality.

## Claims

### Claim 1

A transmission loss minimization management system wherein an energy storage system (ESS) for storing power is installed between a power plant and a substation or between a power plant or a substation and a consumer as an auxiliary means of power supply, in a transmission process from the power plant to the substation or from the substation to another substation or the consumer, a supply of power from the ESS is supplemented according to a power demand forecast result or a distance to the consumer, and the system comprises one or more of assisting the transmission from the ESS when the power demand is equal to or greater than a standard value and assisting some of the power stored in the ESS in the vicinity of the substation or the consumer.

### Claim 2 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the system comprises one or more of supplementing daytime output in consideration of characteristics of high daytime demand for power and reduced nighttime demand for power and supplementing some of the power at the ESS installed in the vicinity of the substation or the consumer.

### Claim 3 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the system comprises recording a demand curve for power, supplementing the power supply from the ESS by excess demand power when the power demand exceeds a certain level, receiving power from the power plant or the substation and charging the ESS if the power demand is equal to or less than the certain level, estimating a loss minimization cost of the transmission power calculated by dividing a power consumption time period of the consumer into certain sections and calculating a transmission loss minimization cost by Mathematical Equation 1 below, and receiving compensation by charging all or some of a value corresponding to a difference generated by the loss minimization cost to a power supplier.
Transmission
⁢
minimization
⁢
cost
=
∑
time
{
(
estimated
⁢
amount
⁢
of
⁢
transmission
⁢
losses
⁢
based
⁢
on
⁢
existing
⁢
demand
)
-
(
actual
⁢
amount
⁢
of
⁢
transission
⁢
losses
)
}
×
(
power
⁢
cost
⁢
by
⁢
time
⁢
of
⁢
day
)
[
Mathematical
⁢
Equation
⁢
1
]

### Claim 4 (depends on 1)

The transmission loss minimization management system of claim 1, wherein an optimal location of the ESS is selected in consideration of a location of the power plant, a location of the substation, or a location of the consumer based on a distance and distribution between the locations, and a location where power loss costs can be minimized to a maximum extent is selected based on an estimate result of the transmission loss costs by simulation such that the ESS is installed at the location.

### Claim 5 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the ESS comprises:
a database unit comprising one or more pieces of real-time accumulated information, among specifications, use, and management state of the ESS for at least one ESS;
a state information collection unit configured to collect and update information related to a state of charge (SoC) of the ESS in real time;
a usage state recognition unit comprising situational information checked during use of the ESS;
an algorithm generating unit comprising continuous API query and storage of change values to the information from one or more of the database unit, the state information collection unit, and the usage state recognition unit; and
a central controller having a charging and discharging algorithm comprising an execution command unit configured to determine whether or not to use the ESS applied thereto.

### Claim 6 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the ESS comprises information in which a start time and an end time of battery charging are undated.

### Claim 7 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the charging and discharging algorithm comprises an objective function of electric bill minimization.

### Claim 8 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the ESS comprises demand forecast data.

### Claim 9 (depends on 1)

The transmission loss minimization management system of claim 1, wherein the ESS utilizes information for acquiring location information for newly created or decommissioned power plants, substations, and consumers.

### Claim 10 (depends on 1)

The transmission loss minimization management system of claim 1, wherein at least a part of the ESS comprises vanadium-based battery cells.

### Claim 11

An ESS installation system for transmission loss minimization wherein
an energy storage system (ESS) for storing power is installed between a power plant and a substation or between a power plant or a substation and a consumer as an auxiliary means of power supply, and
the ESS comprises:
a database unit comprising one or more pieces of real-time accumulated information, among specifications, use, and management state of the ESS for at least one ESS;
a state information collection unit configured to collect and update information related to a state of charge (SoC) of the ESS in real time;
a usage state recognition unit comprising situational information checked during use of the ESS; and
a central controller comprising a means configured to regulate charging and discharging of the ESS when a transmission power capacity of the power plant and the substation and a power demand of the consumer are equal to or greater than a standard value.

### Claim 12 (depends on 11)

The ESS installation system of claim 11, wherein the ESS is installed at a predetermined location according to a power demand forecast result or a distance to the consumer in a transmission process from the power plant to the substation or from the substation to another substation or the consumer.

### Claim 13 (depends on 11)

The ESS installation system of claim 11, wherein the ESS supplies power according to a power demand forecast result or a distance to the consumer in a transmission process from the power plant to the substation or from the substation to another substation or the consumer.

### Claim 14

A transmission relay cost charging method through transmission loss minimization management, the transmission relay cost charging method comprising: recording a demand curve of power transmitted from a power plant or a substation to a consumer; a transmission assistance step of transmitting pre-stored power from at least one energy storage system (ESS) installed between the power plant and the substation or between the power plant or the substation and the consumer as an auxiliary means of power supply when a power demand exceeds a certain level; charging the ESS when the power demand is equal to or less than the certain level; estimating a loss minimization cost of the transmission power calculated by dividing a daily time period into certain sections and calculating a transmission minimization cost by Mathematical Equation 1 below; and receiving compensation by charging all or some of a value equivalent to the amount to a supplier.
Transmission
⁢
minimization
⁢
cost
=
∑
time
{
(
estimated
⁢
amount
⁢
of
⁢
transmission
⁢
losses
⁢
based
⁢
on
⁢
existing
⁢
demand
)
-
(
actual
⁢
amount
⁢
of
⁢
transission
⁢
losses
)
}
×
(
power
⁢
cost
⁢
by
⁢
time
⁢
of
⁢
day
)
[
Mathematical
⁢
Equation
⁢
1
]

### Claim 15 (depends on 14)

The transmission relay cost charging method of claim 14, wherein one or more ESSs are installed according to a location of the power plant, a location of the substation, and a distribution of consumers, and the cost is charged according to transmission loss minimization in each section.

### Claim 16

A transmission loss minimization management system comprising: supplementing daytime output in consideration of characteristics of high daytime demand for power and reduced nighttime demand for power; and supplementing some of the power, wherein supplementary supply is performed utilizing an ESS installed in the vicinity of a power plant, a substation, or a consumer, to which power is supplied, the ESS comprising a vanadium-based battery cell.

### Claim 17

A transmission loss minimization management system comprising: recording a demand curve of power; supplementing a supply of power using an energy storage system (ESS) comprising a vanadium-based battery cell when a demand exceeds a certain level; charging the ESS when the demand is equal to or less than the certain level; estimating a loss minimization cost of transmission power calculated by dividing a daily time period into certain sections and calculating a transmission minimization cost according to Mathematical Equation 1 below; and receiving compensation by charging all or some of the amount to a supplier
Transmission
⁢
minimization
⁢
cost
=
∑
time
{
(
estimated
⁢
amount
⁢
of
⁢
transmission
⁢
losses
⁢
based
⁢
on
⁢
existing
⁢
demand
)
-
(
actual
⁢
amount
⁢
of
⁢
transission
⁢
losses
)
}
×
(
power
⁢
cost
⁢
by
⁢
time
⁢
of
⁢
day
)
[
Mathematical
⁢
Equation
⁢
1
]