# US 2025/0096567 A1 · Control device, energy management system, and non-transitory computer readable medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0096567 A1
- Document ID: US20250096567A1
- Status: Published application
- Kind: A1
- Application number: 18/671,170
- Filed: 2024-05-22
- Published: 2025-03-20
- Earliest claimed: 2023-09-15
- Assignees: Kabushiki Kaisha Toshiba
- Applicants: Kabushiki Kaisha Toshiba
- Inventors: Qiang LIN; Tetsu SHIJO; Yasuhiro KANEKIYO; Kenichiro OGAWA
- Web page: https://patentgrep.com/patent/US20250096567A1

## CPC

- H02J 3/00142: {Oscillations concerning frequency}
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/381: {Dispersed generators}
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

According to one embodiment, a control device for an electric power system capable of supplying power to load devices in a plurality of demand areas based on first to N-th power devices in first to N-th placement areas and configured to be able to perform at least one of discharge or charge of power, comprising: a controller configured to detect, based on information of power consumption in each of the demand areas, a demand area in which the power consumption fluctuates more significantly than usual, and determine, according to distances between a detected demand area and the first to N-th placement areas, a control parameter related to input and output of power in the first to N-th power devices.

## Claims

### Claim 1

A control device for an electric power system capable of supplying power to load devices in a plurality of demand areas based on first to N-th power devices in first to N-th placement areas and configured to be able to perform at least one of discharge or charge of power, comprising:
a controller configured to
detect, based on information of power consumption in each of the demand areas, a demand area in which the power consumption fluctuates more significantly than usual, and
determine, according to distances between a detected demand area and the first to N-th placement areas, a control parameter related to input and output of power in the first to N-th power devices.

### Claim 2 (depends on 1)

The control device according to claim 1, wherein
the first to N-th power devices have inertia force for the electric power system, and
the control parameter is an inertia constant.

### Claim 3 (depends on 2)

The control device according to claim 2, wherein
the controller further increases the inertia constant of the power device in the placement area as the distance of the placement area to the detected demand area is closer.

### Claim 4 (depends on 1)

The control device according to claim 1, wherein
the first to N-th power devices are able to perform droop control for the electric power system, and
the control parameter is a droop rate.

### Claim 5 (depends on 4)

The control device according to claim 4, wherein
the controller further increases the droop rate of the power device in the placement area as the distance of the placement area to the detected demand area is closer.

### Claim 6 (depends on 1)

The control device according to claim 1, wherein
the controller performs control for regulating Frequency Restoration Reserves of the first to N-th power devices according to the distances between the detected demand area and the first to N-th areas.

### Claim 7 (depends on 1)

The control device according to claim 1, wherein
the controller performs control for regulating Replacement Reserve of the first to N-th power devices according to the distances between the detected demand area and the first to N-th placement areas.

### Claim 8 (depends on 1)

The control device according to claim 1, wherein
at least one of the first to N-th power devices includes a power generation device, and
the controller changes the control parameter of the power device that includes the power generation device further based on a generation capacity of the power generation device.

### Claim 9 (depends on 1)

The control device according to claim 1, wherein
at least one of the first to N-th power devices includes a power storage device, and
the controller changes the control parameter of the power device that includes the power storage device further based on a state of charge of the power storage device.

### Claim 10 (depends on 9)

The control device according to claim 9, wherein
the at least one power device further includes a power generation device, and the power storage device is configured to store power generated by the power generation device.

### Claim 11 (depends on 1)

The control device according to claim 1, wherein
the electric power system is connected to an electrical grid via a switch, and
the controller changes the control parameter further based on opened/closed state information indicating whether or not the switch is opened.

### Claim 12 (depends on 2)

The control device according to claim 2, wherein
the first to N-th power devices include a synchronous generator or a constant voltage inverter, and the synchronous generator or the constant voltage inverter has the inertia force for the electric power system.

### Claim 13 (depends on 3)

The control device according to claim 3, wherein
the first to N-th power devices include a synchronous generator or a constant voltage inverter, and the synchronous generator or the constant voltage inverter has the inertia force for the electric power system.

### Claim 14 (depends on 4)

The control device according to claim 4, wherein
the first to N-th power devices include a synchronous generator or a constant voltage inverter, and the synchronous generator or the constant voltage inverter has a function of performing the droop control.

### Claim 15 (depends on 1)

The control device according to claim 1, wherein
the distances between the detected demand area and the first to N-th placement areas is a distance along a power line in the power system.

### Claim 16 (depends on 1)

The control device according to claim 1, wherein
the distances between the detected demand area and the first to N-th placement areas is a geographical distance.

### Claim 17 (depends on 1)

The control device according to claim 1, wherein
the power consumption in each of the demand areas is a total of power consumption of the load devices in each of the demand areas.

### Claim 18

An energy management system for an electric power system capable of supplying power to load devices in a plurality of demand areas based on first to N-th power devices in first to N-th placement areas and configured to be able to perform at least one of discharge or charge of power, comprising:
a communicator configured to communicate with a plurality of information communication devices corresponding to the plurality of demand areas;
an acquirer configured to acquire information of power consumption in each of the demand areas from the plurality of information communication devices;
a controller configured to
detect, based on the information of the power consumption in each of the demand areas, a demand area in which the power consumption fluctuates more significantly than usual, and
determine, according to distances between a detected demand area and the first to N-th placement areas, a control parameter related to input and output of power in the first to N-th power devices; and
a control commander configured to transmit command information to the first to nth power devices to instruct them to perform power input/output based on the control parameters.

### Claim 19

A non-transitory computer readable medium having a computer program stored therein which causes a computer to perform processes, the computer being for an electric power system capable of supplying power to load devices in a plurality of demand areas based on first to N-th power devices in first to N-th placement areas and configured to be able to perform at least one of discharge or charge of power, the processes comprising:
acquiring information of power consumption in each of the demand areas;
detecting, based on the information of the power consumption in each of the demand areas, a demand area in which the power consumption fluctuates more significantly than usual;
determining, according to distances between a detected demand area and the first to N-th placement areas, a control parameter related to input and output of power in the first to N-th power devices; and
transmitting command information to the first to nth power devices to instruct to perform power input/output based on the control parameter.
