# US 2025/0094925 A1 · System and method for e2e work order management for coverage hole mitigation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0094925 A1
- Document ID: US20250094925A1
- Status: Published application
- Kind: A1
- Application number: 17/998,808
- Filed: 2022-07-22
- Published: 2025-03-20
- Earliest claimed: 2022-07-22
- Assignees: Rakuten Symphony, Inc.
- Applicants: Rakuten Symphony, Inc.
- Inventors: Prithvi Raj DHAKA; Prafull JOHRI; Atul RAJPOOT; Durgesh RATHORE
- Web page: https://patentgrep.com/patent/US20250094925A1

## CPC

- G06Q 10/103: {Workflow collaboration or project management}
- H04W 16/18: Network planning tools
- G06Q 10/06311: {Scheduling, planning or task assignment for a person or group}
- H04L 41/12: Discovery or management of network topologies
- H04W 24/02: Arrangements for optimising operational condition
- H04W 24/04: Arrangements for maintaining operational condition
- H04L 41/22: comprising specially adapted graphical user interfaces [GUI]
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A method includes receiving a coverage hole mitigation work order (CHMWO) created by a project work order (PWO) administrator; receiving assignment of the CHMWO from the PWO administrator to a PWO requester that is included in a geographic location of the CHMWO; receiving coverage hole optimization for the CHMWO from the PWO requester; and closing the CHMWO in response to the coverage hole optimization being validated.

## Claims

### Claim 1

A method comprising:
receiving a coverage hole mitigation work order (CHMWO) created by a project work order (PWO) administrator;
receiving assignment of the CHMWO from the PWO administrator to a PWO requester that is included in a geographic location of the CHMWO;
receiving coverage hole optimization for the CHMWO from the PWO requester; and
closing the CHMWO in response to the coverage hole optimization being validated.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
in response to the PWO requester accepting the assignment of the CHMWO, generating a coverage hole optimization work order; and
assigning the coverage hole optimization work order to the PWO requester.

### Claim 3 (depends on 1)

The method of claim 1, wherein the PWO requester is a first PWO requester, the method further comprising:
in response to the PWO requester rejecting the assignment of the CHMWO, assigning the CHMWO to a PWO approver;
in response to the PWO approver accepting the assignment of the CHMWO, generating a coverage hole optimization work order; and
assigning the coverage hole optimization work order to a second PWO requester.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
in response to the PWO approver rejecting the assignment of the CHMWO, assigning the CHMWO to the PWO administrator;
in response to the PWO administrator accepting the assignment of the CHMWO, generating the coverage hole optimization work order;
assigning the coverage hole optimization work order to the second PWO requester; and
in response to the PWO administrator rejecting the assignment of the CHMWO, closing the CHMWO.

### Claim 5 (depends on 1)

The method of claim 1, wherein:
the receiving coverage hole optimization for the CHMWO from the PWO requester comprises:
receiving a default e-tilt for a first cell created by a mitigation algorithm; or
receiving a modified e-tilt for the first cell from the PWO requester; or
receiving a second cell and parameters for the second cell to be used to mitigate a coverage hole.

### Claim 6 (depends on 5)

The method of claim 5, further comprising:
receiving the parameters for the second cell through one of:
receiving a service access point (SAP) ID;
receiving a file upload; or
selecting the second cell from a graphical user interface (GUI) displayed on a user interface (UI), the GUI displaying a map of the geographic location of the coverage hole.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
in response to the coverage hole optimization for the CHMWO being rejected by the PWO requester, sending the coverage hole optimization back to the PWO requester to be modified; and
in response to the coverage hole optimization for the CHMWO being accepted by the PWO requester, sending the coverage hole optimization to a PWO approver to be validated.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
in response to the coverage hole optimization for the CHMWO being rejected by the PWO approver, sending the coverage hole optimization back to the PWO requester to be modified;
in response to the coverage hole optimization for the CHMWO being accepted by the PWO approver, performing one of:
closing the CHMWO; or
assigning a new cell site request to the PWO requester.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
receiving a new cell site requisition from the PWO requester; and
sending the new cell site requisition to the PWO approver.

### Claim 10 (depends on 9)

The method of claim 9, further comprising:
in response to the new cell site requisition being rejected by the PWO approver, sending the new cell site requisition back to the PWO requester to be modified; and
in response to the new cell site requisition being accepted by the PWO approver, sending the new site requisition to the PWO administrator to be validated.

### Claim 11

An apparatus, comprising:
a processor; and
a memory having instructions stored thereon that, when executed by the processor, cause the processor to:
receive a coverage hole mitigation work order (CHMWO) created by a project work order (PWO) administrator;
receive assignment of the CHMWO from the PWO administrator to a PWO requester that is included in a geographic region of the CHMWO;
receive coverage hole optimization for the CHMWO from the PWO requester; and
close the CHMWO in response to the coverage hole optimization being validated.

### Claim 12 (depends on 11)

The apparatus of claim 11, wherein the instructions further cause the processor to:
in response to PWO requester acceptance of the assignment of the CHMWO, generate a coverage hole optimization work order; and
assign the coverage hole optimization work order to the PWO requester.

### Claim 13 (depends on 11)

The apparatus of claim 11, wherein the PWO requester is a first PWO requester, the instructions further cause the processor to:
in response to POW requester rejection of the assignment of the CHMWO, assign the CHMWO to a PWO approver;
in response to PWO approver acceptance of the assignment of the CHMWO, generate a coverage hole optimization work order; and
assign the coverage hole optimization work order to a second PWO requester.

### Claim 14 (depends on 13)

The apparatus of claim 13, wherein the instructions further cause the processor to:
in response to POW approver rejection of the assignment of the CHMWO, assign the CHMWO to the PWO administrator;
in response to PWO administrator acceptance of the assignment of the CHMWO, generate the coverage hole optimization work order;
assign the coverage hole optimization work order to the second PWO requester; and
in response to the PWO administrator rejecting the assignment of the CHMWO, closing the CHMWO.

### Claim 15 (depends on 1)

The method of claim 1, wherein the receiving coverage hole optimization for the CHMWO from the PWO requester comprises:
receive a default e-tilt for a first cell created by a mitigation algorithm; or
receive a modified e-tilt for the first cell from the PWO requester; or
receive a second cell and parameters for the second cell to be used to mitigate a coverage hole.

### Claim 16

A non-transitory computer readable medium having instructions stored thereon that, when executed by a processor, cause an apparatus to:
receive a coverage hole mitigation work order (CHMWO) created by a project work order (PWO) administrator;
receive assignment of the CHMWO from the PWO administrator to a PWO requester that is included in a geographic region of the CHMWO;
receive coverage hole optimization for the CHMWO from the PWO requester; and
close the CHMWO in response to the coverage hole optimization being validated.

### Claim 17 (depends on 16)

The non-transitory computer readable medium of claim 16, wherein the instructions further cause the processor to:
in response to PWO requester acceptance of the assignment of the CHMWO, generate a coverage hole optimization work order; and
assign the coverage hole optimization work order to the PWO requester.

### Claim 18 (depends on 16)

The non-transitory computer readable medium of claim 16, wherein the PWO requester is a first PWO requester, the instructions further cause the processor to:
in response to POW requester rejection of the assignment of the CHMWO, assign the CHMWO to a PWO approver;
in response to PWO approver acceptance of the assignment of the CHMWO, generate a coverage hole optimization work order; and
assign the coverage hole optimization work order to a second PWO requester.

### Claim 19 (depends on 18)

The non-transitory computer readable medium of claim 18, wherein the instructions further cause the processor to:
in response to POW approver rejection of the assignment of the CHMWO, assign the CHMWO to the PWO administrator;
in response to PWO administrator acceptance of the assignment of the CHMWO, generate the coverage hole optimization work order;
assign the coverage hole optimization work order to the second PWO requester; and
in response to the PWO administrator rejecting the assignment of the CHMWO, closing the CHMWO.

### Claim 20 (depends on 16)

The non-transitory computer readable medium of claim 16, wherein the receiving coverage hole optimization for the CHMWO from the PWO requester comprises:
receive a default e-tilt for a first cell created by a mitigation algorithm; or
receive a modified e-tilt for the first cell from the PWO requester; or
receive a second cell and parameters for the second cell to be used to mitigate a coverage hole.
