# US 2025/0094872 A1 · Method for providing training data for a machine learning (ml) model for predicting the behavior of a technical system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0094872 A1
- Document ID: US20250094872A1
- Status: Published application
- Kind: A1
- Application number: 18/826,405
- Filed: 2024-09-06
- Published: 2025-03-20
- Earliest claimed: 2023-09-14
- Applicants: Robert Bosch GmbH
- Inventors: Christoph Zimmer; Erik Tonner; Karsten Frank; Markus Gorges; Ricardo Juarez
- Web page: https://patentgrep.com/patent/US20250094872A1

## CPC

- G06N 20/00: Machine learning
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A method for providing training data for a machine learning (ML) model for predicting the behavior of a technical system. The method includes: generating a first data set containing simulation data for the technical system; generating a second data set containing prototype data of the technical system; generating a third data set by combining the first and second data sets; training the ML model based on the third data set; generating a fourth data set as first input data based on the third data set by maximizing an information function, to obtain a first feature combination as input data for the technical system; measuring the first feature combination for the prototype data of the technical system to obtain a fifth data set; and adding the fifth data set as output data and the generated fourth data set as first input data to the third data set as training data.

## Claims

### Claim 1

A method for providing training data for a machine learning (ML) model for predicting behavior of a technical system, the method comprising the following steps:
generating a first data set, wherein the first data set contains simulation data for the technical system;
generating a second data set, wherein the second data set contains prototype data of the technical system;
generating a third data set by combining the first data set with the second data set;
training the ML model based on the third data set;
generating a fourth data set as first input data based on the third data set by maximizing an information function, to obtain a first feature combination as input data for the technical system;
measuring the first feature combination for the prototype data of the technical system, to obtain a fifth data set; and
adding the fifth data set as output data and the generated fourth data set as first input data to the third data set as training data for the ML model.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the measuring and adding steps of the method are repeated.

### Claim 3 (depends on 1)

The method according to claim 1, wherein, after the training step, a check is carried out as to whether a termination criterion has already been met, and when the termination criterion is met, a step that terminates the method is carried out.

### Claim 4 (depends on 3)

The method according to claim 3, wherein the defined termination criterion includes at least one of the following criteria as to whether the ML model is trained further: maximum number of measurements carried out, a defined model quality of the ML model, number of iterations carried out to improve the ML model, a specified time period for training the ML model.

### Claim 5 (depends on 3)

The method according to claim 3, wherein the checking is carried out using a validation data set, wherein the validation data set is used to generate verifiable quality information for the trained ML model, which indicates how accurately the trained ML model maps the validation data set.

### Claim 6 (depends on 5)

The method according to claim 5, wherein the quality information of the ML model indicates an error value of the ML model that the trained ML model makes when applying the validation data set, and when this output error value of the ML model is below a defined error tolerance limit, the training of the ML model is terminated.

### Claim 7

A non-transitory machine-readable data carrier on which is stored a computer program including machine-readable instructions for providing training data for a machine learning (ML) model for predicting behavior of a technical system, the instructions, when executed by one or more computers and/or computer instances, cause the one or more computers and/or computer instances to perform the following steps:
generating a first data set, wherein the first data set contains simulation data for the technical system;
generating a second data set, wherein the second data set contains prototype data of the technical system;
generating a third data set by combining the first data set with the second data set;
training the ML model based on the third data set;
generating a fourth data set as first input data based on the third data set by maximizing an information function, to obtain a first feature combination as input data for the technical system;
measuring the first feature combination for the prototype data of the technical system, to obtain a fifth data set; and
adding the fifth data set as output data and the generated fourth data set as first input data to the third data set as training data for the ML model.

### Claim 8

One or more computers and/or computer instances equipped by a non-transitory machine-readable data carrier on which is stored a computer program including machine-readable instructions for providing training data for a machine learning (ML) model for predicting behavior of a technical system, the instructions, when executed by the one or more computers and/or computer instances, cause the one or more computers and/or computer instances to perform the following steps:
generating a first data set, wherein the first data set contains simulation data for the technical system;
generating a second data set, wherein the second data set contains prototype data of the technical system;
generating a third data set by combining the first data set with the second data set;
training the ML model based on the third data set;
generating a fourth data set as first input data based on the third data set by maximizing an information function, to obtain a first feature combination as input data for the technical system;
measuring the first feature combination for the prototype data of the technical system, to obtain a fifth data set; and
adding the fifth data set as output data and the generated fourth data set as first input data to the third data set as training data for the ML model.
