# US 2025/0094667 A1 · Unified platform for planning and operations of an electric power grid

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0094667 A1
- Document ID: US20250094667A1
- Status: Published application
- Kind: A1
- Application number: 18/884,957
- Filed: 2024-09-13
- Published: 2025-03-20
- Earliest claimed: 2023-09-15
- Assignees: X Development LLC
- Applicants: X Development LLC
- Inventors: Sze Mei Cat Wong; Leo Francis Casey; Sushant Kumar
- Web page: https://patentgrep.com/patent/US20250094667A1

## CPC

- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06Q 50/06: Energy or water supply
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- H02J 3/381: {Dispersed generators}
- G06F 2113/04: Power grid distribution networks
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

Methods, systems, and apparatus, including computer programs encoded on a computer storage medium, for simulation of electrical power grid behaviors. In some instances, a data model associated with an electrical power grid is obtained. The data model stores static data and dynamic data that can be continuously integrated into the data model based on data streams obtained from data sources associated with properties of the electrical power grid. A set of interfaces can be instantiated for querying data based on the data model. The querying is related to data from at least one of a planning analysis modeling domain or an operation analysis modeling domain from the data model related to the electrical power grid. A query associated with a first planning operation in the planning analysis modeling domain is executed. The query defines one or more nodes of the electrical power grid and relates to the planning analysis domain.

## Claims

### Claim 1

A computer implemented method comprising:
executing a planning operation requested through a query view exposed by an integrated planning and operations platform, wherein the planning operation is related to a behavior of at least a region of an electrical power grid, wherein the query view is based on a data model that integrates planning and operational data associated with the electrical power grid, wherein the planning operation is executed based on data related to a current status of the electrical power grid determined based on the data model, wherein executing the planning operation comprises:
determining a first set of values for corresponding parameters of a set of operational parameters related to the requested planning operation, wherein the first set of values is associated with a first time dimension;
generating output from the planning operation to evaluate the output according to planning status criteria; and
identifying one or more proposed modifications for the current status of the electrical power grid based on the evaluation of the output according to the planning status criteria;
simulating the behavior of at least the region of the electrical power grid using the one or more proposed modifications; and
providing a recommendation for modification of the electrical power grid based on the simulation.

### Claim 2 (depends on 1)

The method of claim 1, the method comprising:
instantiating the integrated planning and operations platform to expose views of the data model associated with corresponding types of tasks to be performed in relation to the electrical power grid, wherein the types of tasks include operations tasks and planning tasks.

### Claim 3 (depends on 1)

The method of claim 1, wherein the data model stores static data and dynamic data, both related to the electrical power grid over a time dimension, and wherein the static data and the dynamic data are continuously integrated into the data model based on data streams obtained from a set of data sources associated with properties of the electrical power grid.

### Claim 4 (depends on 1)

The method of claim 1, the method comprising:
exposing a set of interfaces for querying data based on the data model, wherein the querying is related to data from at least one of a planning analysis modeling domain from the data model related to the electrical power grid, wherein the query view is embedded in at least one interface of the set of interfaces.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining the first set of values comprises:
generating and executing a query associated with the planning operation in a planning analysis modeling domain of the data model, wherein the query defines one or more nodes of the electrical power grid and relates to the planning analysis modeling domain, and wherein executing the query is based on data related to a current state of the electrical power grid defined based on data from the data model, the data being related to the one or more nodes of the electrical power grid in an operation analysis modeling domain.

### Claim 6 (depends on 1)

The method of claim 1, wherein the data model includes a set of elements organized into a hierarchical structure, wherein an element of the data model is mapped with data obtained from at least two data streams for a node of the electrical power grid, where the data from the at least two data streams overlap in relation to a set of properties of the element.

### Claim 7 (depends on 4)

The method of claim 4, wherein the set of interfaces are predefined for a set of user groups, the user groups including a planner user group and an operation user group, wherein a first interface associated with a planner user group is associated with a planning analysis modeling domain, wherein at least a portion of data from the planning analysis modeling domain is accessible for editing by a user of the planner user group and is only accessible for viewing by a user of the operation user group, and wherein at least a portion of data from an operation analysis modeling domain is accessible for editing by a user of the operation user group and is only accessible for viewing by a user of the planner user group.

### Claim 8

A non-transitory, computer-readable medium coupled to one or more processors and having instructions stored thereon which, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
executing a planning operation requested through a query view exposed by an integrated planning and operations platform, wherein the planning operation is related to a behavior of at least a region of an electrical power grid, wherein the query view is based on a data model that integrates planning and operational data associated with the electrical power grid, wherein the planning operation is executed based on data related to a current status of the electrical power grid determined based on the data model, wherein executing the planning operation comprises:
determining a first set of values for corresponding parameters of a set of operational parameters related to the requested planning operation, wherein the first set of values is associated with a first time dimension;
generating output from the planning operation to evaluate the output according to planning status criteria; and
identifying one or more proposed modifications for the current status of the electrical power grid based on the evaluation of the output according to the planning status criteria;
simulating the behavior of at least the region of the electrical power grid using the one or more proposed modifications; and
providing a recommendation for modification of the electrical power grid based on the simulation.

### Claim 9 (depends on 8)

The non-transitory, computer-readable medium of claim 8, comprising further instructions which, when executed by the one or more processors, cause the one or more processors to perform operations, comprising:
instantiating the integrated planning and operations platform to expose views of the data model associated with corresponding types of tasks to be performed in relation to the electrical power grid, wherein the types of tasks include operations tasks and planning tasks.

### Claim 10 (depends on 8)

The non-transitory, computer-readable medium of claim 8, wherein the data model stores static data and dynamic data, both related to the electrical power grid over a time dimension, and wherein the static data and the dynamic data are continuously integrated into the data model based on data streams obtained from a set of data sources associated with properties of the electrical power grid.

### Claim 11 (depends on 8)

The non-transitory, computer-readable medium of claim 8, comprising further instructions which, when executed by the one or more processors, cause the one or more processors to perform operations, comprising:
exposing a set of interfaces for querying data based on the data model, wherein the querying is related to data from at least one of a planning analysis modeling domain from the data model related to the electrical power grid, wherein the query view is embedded in at least one interface of the set of interfaces.

### Claim 12 (depends on 8)

The non-transitory, computer-readable medium of claim 8, wherein determining the first set of values comprises:
generating and executing a query associated with the planning operation in a planning analysis modeling domain of the data model, wherein the query defines one or more nodes of the electrical power grid and relates to the planning analysis modeling domain, and wherein executing the query is based on data related to a current state of the electrical power grid defined based on data from the data model, the data being related to the one or more nodes of the electrical power grid in an operation analysis modeling domain.

### Claim 13 (depends on 8)

The non-transitory, computer-readable medium of claim 8, wherein the data model includes a set of elements organized into a hierarchical structure, wherein an element of the data model is mapped with data obtained from at least two data streams for a node of the electrical power grid, where the data from the at least two data streams overlap in relation to a set of properties of the element.

### Claim 14 (depends on 11)

The non-transitory, computer-readable medium of claim 11, wherein the set of interfaces are predefined for a set of user groups, the user groups including a planner user group and an operation user group, wherein a first interface associated with a planner user group is associated with a planning analysis modeling domain, wherein at least a portion of data from the planning analysis modeling domain is accessible for editing by a user of the planner user group and is only accessible for viewing by a user of the operation user group, and wherein at least a portion of data from the operation analysis modeling domain is accessible for editing by a user of the operation user group and is only accessible for viewing by a user of the planner user group.

### Claim 15

A system comprising
a computing device; and
a computer-readable storage device coupled to the computing device and having instructions stored thereon which, when executed by the computing device, cause the computing device to perform operations comprising:
executing a planning operation requested through a query view exposed by an integrated planning and operations platform, wherein the planning operation is related to a behavior of at least a region of an electrical power grid, wherein the query view is based on a data model that integrates planning and operational data associated with the electrical power grid, wherein the planning operation is executed based on data related to a current status of the electrical power grid determined based on the data model, wherein executing the planning operation comprises:
determining a first set of values for corresponding parameters of a set of operational parameters related to the requested planning operation, wherein the first set of values is associated with a first time dimension;
generating output from the planning operation to evaluate the output according to planning status criteria; and
identifying one or more proposed modifications for the current status of the electrical power grid based on the evaluation of the output according to the planning status criteria;
simulating the behavior of at least the region of the electrical power grid using the one or more proposed modifications; and
providing a recommendation for modification of the electrical power grid based on the simulation.

### Claim 16 (depends on 15)

The system of claim 15, wherein the computer-readable storage device has further instructions which, when executed by the computing device, cause the computing device to perform operations, comprising:
instantiating the integrated planning and operations platform to expose views of the data model associated with corresponding types of tasks to be performed in relation to the electrical power grid, wherein the types of tasks include operations tasks and planning tasks.

### Claim 17 (depends on 15)

The system of claim 15, wherein the data model stores static data and dynamic data, both related to the electrical power grid over a time dimension, and wherein the static data and the dynamic data are continuously integrated into the data model based on data streams obtained from a set of data sources associated with properties of the electrical power grid.

### Claim 18 (depends on 15)

The system of claim 15, wherein the computer-readable storage device has further instructions which, when executed by the computing device, cause the computing device to perform operations, comprising:
exposing a set of interfaces for querying data based on the data model, wherein the querying is related to data from at least one of a planning analysis modeling domain from the data model related to the electrical power grid, wherein the query view is embedded in at least one interface of the set of interfaces.

### Claim 19 (depends on 15)

The system of claim 15, wherein determining the first set of values comprises:
generating and executing a query associated with the planning operation in a planning analysis modeling domain of the data model, wherein the query defines one or more nodes of the electrical power grid and relates to the planning analysis modeling domain, and wherein executing the query is based on data related to a current state of the electrical power grid defined based on data from the data model, the data being related to the one or more nodes of the electrical power grid in an operation analysis modeling domain.

### Claim 20 (depends on 19)

The system of claim 19, wherein the data model includes a set of elements organized into a hierarchical structure, wherein an element of the data model is mapped with data obtained from at least two data streams for a node of the electrical power grid, where the data from the at least two data streams overlap in relation to a set of properties of the element.
