# US 2025/0093883 A1 · Work region setting device, work region setting system, work region setting method, and storage medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0093883 A1
- Document ID: US20250093883A1
- Status: Published application
- Kind: A1
- Application number: 18/884,186
- Filed: 2024-09-13
- Published: 2025-03-20
- Earliest claimed: 2023-09-20
- Assignees: Honda Motor Co., Ltd.
- Applicants: Honda Motor Co., Ltd.
- Inventors: Andrii Pydin
- Web page: https://patentgrep.com/patent/US20250093883A1

## CPC

- G05D 1/6482: {by dividing the whole area or space in sectors to be processed separately}
- A01D 34/008: {for automated or remotely controlled operation}
- G05D 1/246: using environment maps, e.g. simultaneous localisation and mapping [SLAM]
- G05D 1/6987: {by centralised control off-board any of the vehicles}
- A01D 2101/00: Lawn-mowers
- G05D 2105/15: for harvesting, sowing or mowing in agriculture or forestry
- G05D 2107/23: {Gardens or lawns}
- G05D 2109/10: Land vehicles
- G05D: SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- A01D: HARVESTING; MOWING

## Abstract

A work region setting device includes a processor executes computer-readable instructions to perform acquiring map information about a work region and work machine information about a plurality of work machines, deciding the work target region for each of the work machines for performing the work in a work range of a work region designated based on the map information, setting the decided work target region for each work machine, and transmitting the work target region to the work machine. The work machines include a first second work machines. The deciding of the work target region includes deciding a region including an edge of a boundary line located around the work range as a second work target region of the second work machine and deciding a region of the work range inside of the second work target region as a first work target region of the first work machine.

## Claims

### Claim 1

A work region setting device for deciding and setting a work target region that is a target where work is shared and performed by a plurality of work machines that autonomously move and perform work within a work region, the work region setting device comprising a processor configured to execute computer-readable instructions to perform:
acquiring map information including at least a whole of the work region and work machine information including information about at least work efficiency of the plurality of work machines;
deciding the work target region for each of the work machines for performing the work in a work range of a work region designated based on the map information;
setting the decided work target region for each work machine; and
transmitting the work target region to the work machine,
wherein the plurality of work machines include
a first work machine having high work efficiency and configured not to perform the work on an edge of a boundary line located around the work range, and
a second work machine having lower work efficiency than the first work machine and configured to perform the work on the edge, and
wherein the deciding of the work target region comprises:
deciding a region located around the work range including the edge as a second work target region of the second work machine; and
deciding a region of the work range inside of the second work target region as a first work target region of the first work machine.

### Claim 2 (depends on 1)

The work region setting device according to claim 1,
wherein the deciding of the work target region comprises:
deciding a region of a width of a second work area in which the second work machine can perform the work per unit time along the edge of the work range as the second work target region,
deciding a sequentially moved region as the first work target region so that a region of a first work area in which the first work machine can perform the work per unit time comes into contact with the inside of the second work target region, and
establishing the second work target region by adding a region that is not decided to be the first work target region in the work range to the second work target region.

### Claim 3 (depends on 2)

The work region setting device according to claim 2,
wherein the deciding of the work target region comprises:
determining whether a difference between a first distance of a first straight line from a center position of the first work target region to a first position on a boundary line between the first work target region and the second work target region and a second distance of a second straight line from the center position to a second position adjacent to the first position on the boundary line is less than or equal to a distance threshold value; and
when a determination result indicates that the difference between the first distance and the second distance is not less than or equal to the distance threshold value,
obtaining a third position where the difference is less than or equal to the distance threshold value on a straight line corresponding to a longer distance between the first distance and the second distance,
updating the first work target region using the third position as a position on the boundary line, and
establishing the second work target region by adding a region that is no longer the first work target region due to an update of the first work target region to the second work target region.

### Claim 4 (depends on 3)

The work region setting device according to claim 3,
wherein the deciding of the work target region comprises:
determining whether or not a difference between a first work time required for the first work machine to complete the work for the first work target region and a second work time required for the second work machine to complete the work for the second work target region is less than or equal to a time threshold value; and
when a determination result indicates that the difference between the first work time and the second work time is not less than or equal to the time threshold value,
updating the first work target region so that the first work target region is narrowed, and
updating the second work target region so that the second work target region is widened by adding a decrement region by which the first work target region is narrowed due to the update of the first work target region to the second work target region.

### Claim 5 (depends on 4)

The work region setting device according to claim 4,
wherein the deciding of the work target region comprises:
updating the first work target region so that the first work target region is narrowed from an outer circumferential end with largest curvature in the first work target region.

### Claim 6 (depends on 1)

The work region setting device according to claim 1, wherein the first work machine and the second work machine are lawnmowers.

### Claim 7

A work region setting system for causing a plurality of work machines, which autonomously move and perform work within a work region, to share and perform the work, the work region setting system comprising:
a first work machine having high work efficiency and configured not to perform the work on an edge of a boundary line located around the work range;
a second work machine having lower work efficiency than the first work machine and configured to perform the work on the edge; and
a work region setting device configured to decide and set a work target region that is a target where each work machine is allowed to perform the work,
wherein the work region setting device comprises a processor configured to execute computer-readable instructions to perform:
acquiring map information including at least a whole of the work region and work machine information including information about at least work efficiency of the plurality of work machines;
deciding the work target region for each of the work machines for performing the work in a work range of a work region designated based on the map information;
setting the decided work target region for each work machine; and
transmitting the work target region to the work machine, and
wherein the deciding of the work target region comprises:
deciding a region located around the work range including the edge as a second work target region of the second work machine; and
deciding a region of the work range inside of the second work target region as a first work target region of the first work machine.

### Claim 8

A work region setting method comprising:
acquiring, by a computer of a work region setting device for deciding and setting a work target region that is a target where work is shared and performed by a plurality of work machines that autonomously move and perform work within a work region, map information including at least a whole of the work region and work machine information including information about at least work efficiency of the plurality of work machines; and
when the work target region is decided for each of the work machines for performing the work in a work range of a work region designated based on the map information, wherein the work machines include a first work machine having high work efficiency and configured not to perform the work on an edge of a boundary line located around the work range and a second work machine having lower work efficiency than the first work machine and configured to perform the work on the edge,
deciding, by the computer, a region located around the work range including the edge as a second work target region of the second work machine,
deciding, by the computer, a region of the work range inside of the second work target region as a first work target region of the first work machine, and
transmitting, by the computer, the work target region to each work machine when the decided work target region is set for each work machine.

### Claim 9

A non-transitory computer-readable storage medium storing a program for causing a computer of a work region setting device for deciding and setting a work target region that is a target where work is shared and performed by a plurality of work machines that autonomously move and perform work within a work region to:
acquire map information including at least a whole of the work region and work machine information including information about at least work efficiency of the plurality of work machines; and
when the work target region is decided for each of the work machines for performing the work in a work range of a work region designated based on the map information, wherein the work machines include a first work machine having high work efficiency and configured not to perform the work on an edge of a boundary line located around the work range and a second work machine having lower work efficiency than the first work machine and configured to perform the work on the edge,
decide a region located around the work range including the edge as a second work target region of the second work machine,
decide a region of the work range inside of the second work target region as a first work target region of the first work machine, and