# US 2025/0084948 A1 · Sewer inspection and/or maintenance system with a tool exchanger system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0084948 A1
- Document ID: US20250084948A1
- Status: Published application
- Kind: A1
- Application number: 18/883,997
- Filed: 2024-09-12
- Published: 2025-03-13
- Earliest claimed: 2023-09-13
- Applicants: iPEK International GmbH
- Inventors: Vreni Tolsdorf; Johannes Wiese; Simon Schweizer; Anton Krämer
- Web page: https://patentgrep.com/patent/US20250084948A1

## CPC

- F16L 55/18: Appliances for use in repairing pipes (F16L55/10 takes precedence)
- F16L 55/28: Constructional aspects
- F16L 55/30: of the propulsion means, e.g. towed by cables
- F16L 2101/10: Treating the inside of pipes
- F16L 2101/30: Inspecting, measuring or testing
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL

## Abstract

A sewer inspection and/or maintenance system is provided, comprising: (A) a carrier system, in particular a crawler, wherein a lifting arm of the carrier system is designed such that a device carrier arranged thereon can be moved between a number of device—changing positions and at least one device—use position; and (B) a device magazine for accommodating a plurality of devices that is arranged on the carrier system.

## Claims

### Claim 1

A sewer inspection and/or maintenance system comprising a carrier system, in particular a crawler, wherein:
a lifting arm is arranged on the carrier system, at the free end of which a device carrier is arranged,
the device carrier comprises a first adapter,
the lifting arm is designed such that the device carrier arranged thereon can be moved between a number of device changing positions and at least one device use position,
a device magazine for accommodating a number of devices is arranged on the carrier system, wherein the devices each comprise a second adapter which corresponds to the first adapter of the device carrier, wherein the device is detachably attachable to the device carrier by means of the first adapter and the second adapter of a device,
the lifting arm is movable, with a device attached to the first adapter, into a first device changing position, wherein the first adapter, in the first device changing position, is designed to release the device attached to the first adapter from the first adapter, and
the lifting arm can be moved into a second device changing position without a device attached to the first adapter, wherein the first adapter, in the second device changing position, is designed to attach a device accommodated in the device magazine to the first adapter.

### Claim 2 (depends on 1)

The sewer inspection and/or maintenance system according to claim 1, wherein this system has a locking device assigned to the first adapter and the second adapter, with which a device arranged on the first adapter can be temporarily locked to the first adapter.

### Claim 3 (depends on 2)

The sewer inspection and/or maintenance system according to claim 2, wherein the locking device comprises at least one controllable locking means arranged on the first adapter, wherein the locking means is movable with respect to the device carrier between a locked position and an unlocked position.

### Claim 4 (depends on 1)

The sewer inspection and/or maintenance system according to claim 1, wherein, in the device magazine, a predetermined position within the device magazine is provided for each device accommodated therein.

### Claim 5 (depends on 1)

The sewer inspection and/or maintenance system according to claim 1, wherein the device magazine has a securing device for a device accommodated therein, with which the device can be releasably locked in the device magazine after being accommodated in the device magazine.

### Claim 6 (depends on 5)

The sewer inspection and/or maintenance system according to claim 5, wherein the securing device is designed as a controllable securing device which is controllable in such a way that:
a locking of a device to be removed from the device magazine with the lifting arm is not released until the device is attached to the first adapter, and
a device to be placed into the device magazine with the lifting arm is locked before the device is released from the first adapter.

### Claim 7 (depends on 1)

The sewer inspection and/or maintenance system according to claim 1, wherein the lifting arm is designed such that the device carrier can be freely positioned in a sewer or pipe with respect to a plurality of degrees of freedom.

### Claim 8

A sewer inspection and/or maintenance system comprising a carrier system, in particular a crawler, wherein a device magazine for accommodating a number of devices is arranged on the carrier system.

### Claim 9 (depends on 8)

A sewer inspection and/or cleaning system according to claim 8, wherein:
a lifting arm is arranged on the carrier system, at the free end of which a device carrier is arranged,
the device carrier comprises a first adapter,
the lifting arm is designed such that the device carrier arranged thereon can be moved between a number of device changing positions and at least one device use position,
the devices each comprise a second adapter which corresponds to the first adapter of the device carrier, wherein the device is detachably attachable to the device carrier by means of the first adapter and the second adapter of a device,
the lifting arm is movable, with a device attached to the first adapter, into a first device changing position, wherein the first adapter, in the first device changing position, is designed to release the device attached to the first adapter from the first adapter, and
the lifting arm can be moved into a second device changing position without a device attached to the first adapter, wherein the first adapter, in the second device changing position, is designed to attach a device accommodated in the device magazine to the first adapter.
