# US 2025/0084758 A1 · Systems and methods for inferring reservoir pressure based on initial coiled tubing run conditions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0084758 A1
- Document ID: US20250084758A1
- Status: Published application
- Kind: A1
- Application number: 18/464,737
- Filed: 2023-09-11
- Published: 2025-03-13
- Earliest claimed: 2023-09-11
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Philippe Michel Jacques Tardy; Azwan Hadi Keong; Pavel Spesivtsev; Pierre Ramondenc; Jordi Juan Segura Dominguez; Laurence Fossati
- Web page: https://patentgrep.com/patent/US20250084758A1

## CPC

- E21B 47/06: Measuring temperature or pressure
- E21B 47/047: Liquid level (measuring depth or liquid level using radioactive markers E21B47/053)
- E21B 49/08: Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Systems and methods presented herein facilitate coiled tubing operations, and generally relate to automatically improving performance of coiled tubing operations in substantially real time by inferring reservoir pressure based on initial coiled tubing run conditions. For example, a method includes performing a coiled tubing operation via a coiled tubing system at least partially disposed within a wellbore. The method also includes detecting data relating to operating parameters of the coiled tubing operation via sensors of the coiled tubing system during the coiled tubing operation. The method further includes determining an initial wellbore fluid distribution in the wellbore based on the detected data prior to pumping fluid into the wellbore from a surface location relative to the wellbore. In addition, the method includes inferring a reservoir pressure of a hydrocarbon-bearing reservoir through which the wellbore extends based on the initial wellbore fluid distribution in the wellbore.

## Claims

### Claim 1

A method, comprising:
performing a coiled tubing operation via a coiled tubing system at least partially disposed within a wellbore;
detecting data relating to one or more operating parameters of the coiled tubing operation via one or more sensors of the coiled tubing system during the coiled tubing operation;
determining an initial wellbore fluid distribution in the wellbore based at least in part on the detected data prior to pumping fluid into the wellbore from a surface location relative to the wellbore; and
inferring a reservoir pressure of a hydrocarbon-bearing reservoir through which the wellbore extends based at least in part on the initial wellbore fluid distribution in the wellbore.

### Claim 2 (depends on 1)

The method of claim 1, comprising automatically adjusting at least one adjustable operating parameter of the coiled tubing system based at least in part on the initial wellbore fluid distribution.

### Claim 3 (depends on 1)

The method of claim 1, wherein the reservoir pressure is inferred based at least in part on an average density of a fluid mixture in the wellbore between a bottom hole assembly (BHA) of the coiled tubing system and a downhole pressure gauge.

### Claim 4 (depends on 3)

The method of claim 3, wherein the reservoir pressure is inferred by assuming that a measured depth of an oil-water interface in the wellbore is greater than or equal to a measured depth of the downhole pressure gauge when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is less than or equal to a density of oil in the fluid mixture and a density of the wellbore fluid around the BHA is greater than a density of gas in the fluid mixture.

### Claim 5 (depends on 3)

The method of claim 3, wherein the reservoir pressure is inferred by assuming that a measured depth of an oil-water interface in the wellbore is approximately equal to a measured depth of a gas-oil interface in the wellbore when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is greater than a density of oil in the fluid mixture.

### Claim 6 (depends on 3)

The method of claim 3, wherein the reservoir pressure is inferred based at least in part on a calculated measured depth of an oil-water interface in the wellbore when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is greater than a density of oil in the fluid mixture and the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is less than a density of water in the fluid mixture.

### Claim 7 (depends on 3)

The method of claim 3, wherein the average density of a fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is measured when a density of a fluid in an annulus around the BHA of the coiled tubing system is not approximately equal to a density of gas in the fluid mixture.

### Claim 8 (depends on 7)

The method of claim 7, comprising setting a measured depth of a gas-oil interface in the wellbore equal to a measured depth of the BHA of the coiled tubing system, and running the coiled tubing system into the wellbore and updating a measured depth of the BHA of the coiled tubing system when the density of the fluid in the annulus around the BHA of the coiled tubing system is approximately equal to the density of gas in the fluid mixture.

### Claim 9

A processing and control system, comprising:
one or more processors configured to execute processor-executable instructions stored in memory media of the processing and control system, wherein the processor-executable instructions, when executed by the one or more processors, cause the processing and control system to:
receive data relating to one or more operating parameters of a coiled tubing operation performed by via a coiled tubing system at least partially disposed within a wellbore, wherein the data is detected by one or more sensors of a coiled tubing system during the coiled tubing operation;
determine an initial wellbore fluid distribution in the wellbore based at least in part on the data relating to the one or more operating parameters of the coiled tubing operation prior to pumping fluid into the wellbore from a surface location relative to the wellbore; and
infer a reservoir pressure of a hydrocarbon-bearing reservoir through which the wellbore extends based at least in part on the initial wellbore fluid distribution in the wellbore.

### Claim 10 (depends on 9)

The processing and control system of claim 9, wherein the processor-executable instructions, when executed by the one or more processors, cause the processing and control system to automatically adjust at least one adjustable operating parameter of the coiled tubing system based at least in part on the initial wellbore fluid distribution.

### Claim 11 (depends on 9)

The processing and control system of claim 9, wherein the reservoir pressure is inferred based at least in part on an average density of a fluid mixture in the wellbore between a bottom hole assembly (BHA) of the coiled tubing system and a downhole pressure gauge.

### Claim 12 (depends on 11)

The processing and control system of claim 11, wherein the reservoir pressure is inferred by assuming that a measured depth of an oil-water interface in the wellbore is greater than or equal to a measured depth of the downhole pressure gauge when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is less than or equal to a density of oil in the fluid mixture.

### Claim 13 (depends on 11)

The processing and control system of claim 11, wherein the reservoir pressure is inferred by assuming that a measured depth of an oil-water interface in the wellbore is approximately equal to a measured depth of a gas-oil interface in the wellbore when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is greater than a density of oil in the fluid mixture.

### Claim 14 (depends on 11)

The processing and control system of claim 11, wherein the reservoir pressure is inferred based at least in part on a calculated measured depth of an oil-water interface in the wellbore when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is greater than a density of oil in the fluid mixture and the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is less than a density of water in the fluid mixture.

### Claim 15 (depends on 11)

The processing and control system of claim 11, wherein the average density of a fluid mixture in the wellbore is measured when a density of a fluid in an annulus around the BHA of the coiled tubing system is not approximately equal to a density of gas in the fluid mixture.

### Claim 16 (depends on 15)

The processing and control system of claim 15, wherein the processor-executable instructions, when executed by the one or more processors, cause the processing and control system to set a measured depth of a gas-oil interface in the wellbore equal to a measured depth of the BHA of the coiled tubing system, and to send a control signal to run the coiled tubing system into the wellbore and update a measured depth of the BHA of the coiled tubing system when the density of the fluid in the annulus around the BHA of the coiled tubing system is approximately equal to the density of gas in the fluid mixture.

### Claim 17

A method, comprising:
performing a coiled tubing operation via a coiled tubing system at least partially disposed within a wellbore;
detecting data relating to one or more operating parameters of the coiled tubing operation via one or more sensors of the coiled tubing system during the coiled tubing operation;
determining an average density of a fluid mixture in the wellbore between a bottom hole assembly (BHA) of the coiled tubing system and a downhole pressure gauge based at least in part on the detected data prior to pumping fluid into the wellbore from a surface location relative to the wellbore; and
inferring a reservoir pressure of a hydrocarbon-bearing reservoir through which the wellbore extends based at least in part on the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge.

### Claim 18 (depends on 17)

The method of claim 17, wherein the reservoir pressure is inferred by assuming that a measured depth of an oil-water interface in the wellbore is greater than or equal to a measured depth of the downhole pressure gauge when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is less than or equal to a density of oil in the fluid mixture.

### Claim 19 (depends on 17)

The method of claim 17, wherein the reservoir pressure is inferred by assuming that a measured depth of an oil-water interface in the wellbore is approximately equal to a measured depth of a gas-oil interface in the wellbore when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is greater than a density of oil in the fluid mixture.

### Claim 20 (depends on 17)

The method of claim 17, wherein the reservoir pressure is inferred based at least in part on a calculated measured depth of an oil-water interface in the wellbore when the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is greater than a density of oil in the fluid mixture and the average density of the fluid mixture in the wellbore between the BHA of the coiled tubing system and the downhole pressure gauge is less than a density of water in the fluid mixture.
