# US 2025/0062622 A1 · Distributed energy resources aggregated optimization

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0062622 A1
- Document ID: US20250062622A1
- Status: Published application
- Kind: A1
- Application number: 18/235,103
- Filed: 2023-08-17
- Published: 2025-02-20
- Earliest claimed: 2023-08-17
- Assignees: Itron, Inc.
- Applicants: Itron, Inc.
- Inventors: Jered Adam Myers; Howard Ng
- Web page: https://patentgrep.com/patent/US20250062622A1

## CPC

- H02J 3/381: {Dispersed generators}
- G05B 15/02: electric
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 2101/24: Photovoltaics
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method and system for managing demand and electricity supply are disclosed. A distributed energy resource optimizer (DERO) of the system may determine demand for electricity associated with a plurality of premises connected to an electrical grid where the plurality of premises includes one or more distributed generation systems, determine available electricity supply for the plurality of premises, and compare the demand with the available electricity supply. In response to determining that the demand is higher than the available electricity supply, the DERO may cause one or more storage devices associated with the one or more distributed generation systems to supply electricity to the plurality of premises. In response to determining that the demand is lower than the available electricity supply, the DERO may cause the one or more storage devices to store excess electricity supply.

## Claims

### Claim 1

A method comprising:
determining demand for electricity associated with a plurality of premises connected to an electrical grid, the plurality of premises including a distributed generation system associated with one of the plurality of premises;
determining available electricity supply for the plurality of premises;
comparing the demand with the available electricity supply;
in response to determining that the demand is higher than a first predetermined amount of the available electricity supply, supplementing the available electricity supply by causing a storage device associated with the distributed generation system to supply electricity to the electrical grid; and
in response to determining that the demand is lower than a second predetermined amount of the available electricity supply, storing excess electricity supply over the demand in the storage device.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
in response to comparing the demand with the available electricity supply, selecting the storage device from multiple storage devices based on at least one of:
state of charge of the storage device, or
state of health of the storage device.

### Claim 3 (depends on 2)

The method of claim 2, wherein storing the excess electricity supply in the storage device includes at least one of:
causing the storage device to be available for charging by adjusting a charging schedule of at least one of the multiple storage devices; or
increasing a charging rate of at least one of the multiple storage devices.

### Claim 4 (depends on 3)

The method of claim 3, further comprising, in response to determining that the demand is lower than a second predetermined amount of the available electricity supply:
reducing electricity supplied by the distributed generation system to the electrical grid.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining the demand associated with the plurality of premises includes:
receiving electricity usage data of the plurality of premises; and
determining the demand based at least in part on the electricity usage data.

### Claim 6 (depends on 5)

The method of claim 5, wherein receiving the electricity usage data of the plurality of premises includes receiving the electricity usage data from at least one of:
electricity metering devices associated with the plurality of premises,
the distributed generation system,
electric vehicle (EV) telematics of an EV connected to the electrical grid, or
an EV supply equipment (EVSE) associated with the electrical grid.

### Claim 7 (depends on 5)

The method of claim 5, wherein the electricity usage data includes:
present electricity consumption data associated with the plurality of premises,
historical electricity consumption data associated with the plurality of premises,
present electricity generation data associated with the distributed generation system, and
historical electricity generation data associated with the distributed generation system.

### Claim 8 (depends on 7)

The method of claim 7, wherein determining the demand associated with the plurality of premises further includes:
determining the demand based at least in part on the historical electricity consumption data associated with the plurality of premises.

### Claim 9 (depends on 5)

The method of claim 5, further comprising:
providing a forecast to a utility provider associated with the plurality of premises based at least in part on the electricity usage data, the forecast including at least one of predicted demand, predicted available supply, or event recommendations.

### Claim 10 (depends on 1)

The method of claim 1,
wherein determining the demand includes determining a demand level at a transformer associated with the plurality of premises, and
wherein determining the available electricity supply includes determining a supply level available at the transformer.

### Claim 11

A distributed energy resource optimizer (DERO) comprising:
one or more processors; and
memory communicatively coupled to the one or more processors, the memory storing thereon computer executable instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
receiving electricity usage data from a plurality of electricity metering devices associated with a plurality of premises;
determining demand for electricity at a transformer associated with the plurality of electricity metering devices connected to an electrical grid, the electrical grid including a distributed generation system associated with one of the plurality of premises;
determining available electricity supply at the transformer for the plurality of premises;
comparing the demand with the available electricity supply;
in response to determining that the demand is higher than a first predetermined amount of the available electricity supply, causing a storage device associated with the distributed generation system to supply electricity to the electrical grid; and
in response to determining that the demand is lower than a second predetermined amount of the available electricity supply, causing the storage device to store excess electricity supply.

### Claim 12 (depends on 11)

The DERO of claim 11, wherein the operations further comprise:
in response to comparing the demand with the available electricity supply, selecting the storage device from multiple storage devices based on at least one of:
state of charge of the storage device, or
state of health of the storage device.

### Claim 13 (depends on 12)

The DERO of claim 12, wherein causing the storage device to store the excess electricity supply includes:
adjusting a charging schedule of at least one of the multiple storage devices to be available for charging;
increasing a charging rate of at least one of the multiple storage devices; or
controlling the distributed generation system via an electricity metering device of the plurality of electricity metering devices.

### Claim 14 (depends on 11)

The DERO of claim 11, wherein the operations further comprise:
in response to determining that the available electricity supply exceeds the demand, sending instructions to at least one of inverters of at least one of one or more distributed generation systems to reduce electricity supplied to the electrical grid by the at least one of one or more distributed generation systems.

### Claim 15 (depends on 11)

The DERO of claim 11, wherein the electricity usage data includes:
present electricity consumption data associated with the plurality of premises,
present electricity generation data associated with the distributed generation system,
historical electricity consumption data associated with the plurality of premises, and
historical electricity generation data associated with the distributed generation system.

### Claim 16

A non-transitory computer-readable storage medium storing thereon computer executable instructions that, when executed by one or more processors, cause the one or more processors to perform operations, the operations comprising:
receiving electricity usage data from a plurality of electricity metering devices associated with a plurality of premises;
determining demand for electricity at a transformer associated with the plurality of electricity metering devices connected to an electrical grid, the electrical grid including a distributed generation system associated with one of the plurality of premises;
determining available electricity supply at the transformer for the plurality of premises;
comparing the demand with the available electricity supply;
in response to determining that the demand is higher than a first predetermined amount of the available electricity supply, causing a storage device associated with the distributed generation system to supply electricity to the electrical grid; and
in response to determining that the demand is lower than a second predetermined amount of the available electricity supply, causing the storage device to store excess electricity supply.

### Claim 17 (depends on 16)

The non-transitory computer-readable storage medium of claim 16, wherein the operations further comprise:
in response to comparing the demand with the available electricity supply, selecting the storage device from multiple storage devices based on at least one of:
state of charge of the storage device, or
state of health of the storage device.

### Claim 18 (depends on 17)

The non-transitory computer-readable storage medium of claim 17, wherein causing the storage device to store the excess electricity supply includes:
adjusting a charging schedule of at least one of the multiple storage devices to be available for charging;
increasing a charging rate of at least one of the multiple storage devices; or
controlling the distributed generation system via an electricity metering device of the plurality of electricity metering devices.

### Claim 19 (depends on 16)

The non-transitory computer-readable storage medium of claim 16, wherein the operations further comprise:
in response to determining that the available electricity supply exceeds the demand, sending instructions to one or more electricity metering devices of the plurality of electricity metering devices to reduce electricity supplied to the electrical grid by at least one of one or more distributed generation systems corresponding to the one or more electricity metering devices.

### Claim 20 (depends on 16)

The non-transitory computer-readable storage medium of claim 16, wherein the electricity usage data includes:
present electricity consumption data associated with the plurality of premises,
present electricity generation data associated with the distributed generation system,
historical electricity consumption data associated with the plurality of premises, and
historical electricity generation data associated with the distributed generation system.
