Method and system for determining the robustness of a mine plan
AssigneeBHP Innovation Pty. Ltd.
InventorsRussell Seib, Andrew Wells, Sam Patterson
Life of this patent
Estimating the term…
Loading patent…
AssigneeBHP Innovation Pty. Ltd.
InventorsRussell Seib, Andrew Wells, Sam Patterson
Estimating the term…
A computer implemented method for determining the robustness of a mine plan, the method comprising computer program code instructions, being executable by a computer for replicating a mine plan, the mine plan including one or more tasks required to perform operations in a mine; grouping the one or more tasks into one or more work packages, each work package being associated with a duration of time; determining, for the one or more work packages, a variance associated with the duration of time; applying the variance based on at least one simulation to generate a float, the float being the duration of time between the completion of a precedent work package and/or the commencement of a subsequent work package; consolidating each float from the at least one simulation into a robustness index; and displaying at least a portion of the robustness index to a user via a graphical user interface.
A computer implemented method for determining the robustness of a mine plan, the method comprising computer program code instructions, being executable by a computer for:
A system for determining the robustness of a mine plan, the system comprising:
A computer implemented method for determining the robustness of a mine plan, the method comprising computer program code instructions, being executable by a computer for:
A system for determining the robustness of a mine plan, the system comprising:
Dependencies are inferred from the claim text.