Method and system for quality assurance testing of control systems for inverter-based resources
AssigneeMerit Si, LLC
InventorsDmitriy A. ANICHKOV, Thomas P. KUSTER, Nicholas MILAM, Sachin SONI
Life of this patent
Estimating the term…
Loading patent…
AssigneeMerit Si, LLC
InventorsDmitriy A. ANICHKOV, Thomas P. KUSTER, Nicholas MILAM, Sachin SONI
Estimating the term…
A method for testing a plant control system of an inverter-based resource (“IBR”) coupled to an electric power grid, the method comprising: using a power systems modeling environment implemented in an information system, generating an IBR model, the IBR model including an inverter control model, a generator model, a network solution model, and a model power meter; using a hardware-in-the-loop (“HIL”) simulation environment including the IBR model, a phasor data concentrator (“PDC”), a test automation server, and the plant control system, performing a test of the plant control system by iteratively: receiving measurements from the PDC and setpoints from the test automation server and sending the measurements and the setpoints to the plant control system; generating and sending an active power command and a reactive power command from the plant control system to the inverter control model; generating and sending desired active current and desired reactive current from the inverter control model to the generator model; generating and sending active and reactive currents from the generator model to the network solution model, the network solution model generating and sending a terminal voltage measurement to the generator model and the inverter control model, the network solution model generating and sending POI measurements to the model power meter; generating synchrophasors including electrical property information and sending the synchrophasors from the model power meter to the PDC; generating the measurements from the synchrophasors at the PDC; and, storing the synchrophasors as results of the test in the test automation server.
A method for testing a plant control system of an inverter-based resource (“IBR”) coupled to an electric power grid, the method comprising:
Dependencies are inferred from the claim text.