Method of identifying a productive interval along a well
AssigneeSaudi Arabian Oil Company
InventorsJun Gao, Hyung Tae Kwak
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsJun Gao, Hyung Tae Kwak
Estimating the term…
Methods and systems are disclosed. Methods may include obtaining well data along an interval of a well and identifying a first candidate interval within the interval using the well data. The well data includes acoustic data and porosity data. A formation surrounding the well within the first candidate interval includes micropores. The methods may further include determining mechanical parameter data along the first candidate interval based on the acoustic data and identifying a second candidate interval within the first candidate interval based on the mechanical parameter data and the porosity data. The methods may still further include determining water saturation data along the second candidate interval based on the well data, identifying a productive interval within the second candidate interval based on the water saturation data and a water saturation threshold, and determining a completion plan for the well based on the productive interval.
A method comprising:
A system comprising:
A non-transitory computer-readable memory having computer-executable instructions stored thereon that, when executed by a computer processor, perform steps comprising:
Dependencies are inferred from the claim text.