Portal pile driver and cast-in-place pile construction method
AssigneeHainan Zhuodian High Tech Development Co., Ltd.
InventorsYing Peng, Guijiao Peng, Huayuan Li, Songbin Chen, Haitong Chen, Yanji Tan
Life of this patent
Estimating the term…
Loading patent…
AssigneeHainan Zhuodian High Tech Development Co., Ltd.
InventorsYing Peng, Guijiao Peng, Huayuan Li, Songbin Chen, Haitong Chen, Yanji Tan
Estimating the term…
A portal pile driver, and a cast-in-place pile construction method are provided, relating to the technical field of pile foundation construction. The portal pile driver includes a portal frame, a pile frame platform, a moving assembly, and a lifting assembly. The portal frame is erected at one side of the pile frame platform, and a power head is installed on the portal frame. A loading zone is located at the pile frame platform, and a projection of a central shaft of the power head on the pile frame platform is located in an extension direction of the loading zone. The moving assembly is located at one side or each of both sides of the loading zone, and multiple drill pipes are horizontally distributed on the moving assembly, and each drill pipe is perpendicular to a plane where the portal frame is located.
A portal pile driver, comprising a portal frame, a pile frame platform, a moving assembly, and a lifting assembly;
Dependencies are inferred from the claim text.