# US 2025/0043193 A1 · Techniques to mitigate stripper fouling in fluid cokers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0043193 A1
- Document ID: US20250043193A1
- Status: Published application
- Kind: A1
- Application number: 18/364,447
- Filed: 2023-08-02
- Published: 2025-02-06
- Earliest claimed: 2023-08-02
- Assignees: SYNCRUDE CANADA LTD. in trust for the owners of the Syncrude Project as such owners exist now and i
- Applicants: SYNCRUDE CANADA LTD. in trust for the owners of the Syncrude Project as such owners exist now and i
- Inventors: Jason WIENS; Gibran ALAMGIR; Chung Huu TA; Michael WORMSBECKER
- Web page: https://patentgrep.com/patent/US20250043193A1

## CPC

- C10G 9/005: {Coking (in order to produce liquid products mainly)}
- C10G 9/32: according to the "fluidised-bed" technique
- C10G 2300/1037: Hydrocarbon fractions
- C10G 2300/708: Coking aspect, coke content and composition of deposits
- C10G: CRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION (cracking to hydrogen or synthesis gas C01B; cracking or pyrolysis of hydrocarbon gases to individual hydrocarbons or mixtures thereof of definite or specified constitution C07C; cracking to cokes C10B); RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES

## Abstract

A fluid coking operation for converting bitumen to lighter hydrocarbons can be controlled or monitored using a stripper fouling indicator to mitigate foulant accumulation on the sheds of the stripper within the lower section of the coker and avoid flooding. The stripper fouling indicator can be linked to the liquid carry-under to the stripper which can be correlated to certain measurable variables such as which feed nozzles are used for bitumen injection, solids circulation rate of the coke particles, and reactor temperature. The coking can be kept below the stripper fouling indicator to avoid flooding while operating with high yield and performance.

## Claims

### Claim 1

A process for subjecting bitumen to a fluid coking operation, comprising:
feeding the bitumen into a reactor;
circulating coke particles through the reactor to contact the bitumen and cause cracking to produce hydrocarbon products;
removing the hydrocarbon products via an upper outlet of the reactor;
monitoring process parameters of the fluid coking operation; and
controlling operation of the reactor based on a stripper fouling indicator of a stripper located in a lower region of the reactor and based on the monitored process parameters of the fluid coking operation.

### Claim 2 (depends on 1)

The process of claim 1, wherein the process parameters comprise usage of feed nozzles through which the bitumen is fed into the reactor.

### Claim 3 (depends on 1)

The process of claim 1, wherein the process parameters comprise a solids circulation rate of the coke particles.

### Claim 4 (depends on 1)

The process of claim 1, wherein the process parameters comprise a reactor temperature of the reactor.

### Claim 5 (depends on 1)

The process of claim 1, wherein the stripper fouling indicator is based on liquid carry-under to the stripper.

### Claim 6 (depends on 1)

The process of claim 1, wherein the stripper fouling indicator is developed based on a modelling of relations between the process parameters and liquid carry-under to the stripper.

### Claim 7 (depends on 6)

The process of claim 6, wherein the modelling comprises:
developing a model based on a reactor temperature, circulation rate, feed nozzles in operation, and breakthrough times to the stripper for individual feed levels at which the feed nozzles are located, such that the model predicts the liquid carry-under to the stripper;
tuning the model using turnaround stripper fouling as-found data to establish limits on the liquid carry-under resulting in excessive stripper fouling leading to flooding;
determining excess cumulative liquid carry-under (ECLC) which predicts stripper foulant accumulation; and
identifying an ECLC threshold below which stripper foulant accumulation is acceptable for operation.

### Claim 8 (depends on 7)

The process of claim 7, wherein the modelling further comprising accounting for an impact of wall coke thickness within the reactor on the breakthrough times for the individual feed levels.

### Claim 9 (depends on 2)

The process of claim 2, wherein the feed nozzles are arranged in at least three vertically spaced-apart rings within the reactor, each ring being at a defined height within the reactor.

### Claim 10 (depends on 1)

The process of claim 1, wherein the controlling of the reactor comprises adjusting process variables to maintain the stripper fouling indicator below a predetermined threshold.

### Claim 11 (depends on 10)

The process of claim 10, wherein the predetermined threshold comprises an excess cumulative liquid carry-under (ECLC) threshold of the stripper above which stripper flooding is probable to occur.

### Claim 12 (depends on 10)

The process of claim 10, wherein the predetermined threshold comprises a liquid carry-under rate threshold above which fouling onset or fouling accumulation are probable to occur.

### Claim 13 (depends on 1)

The process of claim 1, wherein the stripper fouling indicator comprises an excess cumulative liquid carry-under (ECLC), and wherein the ECLC indicates whether there is a low probability of stripper flooding, an uncertain probability of stripper flooding, and a likely probability of stripper flooding.

### Claim 14 (depends on 1)

The process of claim 1, wherein the controlling of the reactor comprises adjusting process variables to avoid flooding of the stripper.

### Claim 15 (depends on 1)

The process of claim 1, wherein the controlling of the reactor comprises determining and monitoring the stripper fouling indicator over time during operation of the reactor.

### Claim 16 (depends on 1)

The process of claim 1, wherein the controlling of the reactor comprises, in response to an increase in the stripper fouling indicator:
increasing a reactor temperature;
selecting feed nozzles located at a higher elevation within the reactor for injection of the bitumen into the reactor; and/or
decreasing solids circulation rate through the reactor.

### Claim 17 (depends on 1)

The process of claim 1, wherein the controlling of the reactor comprises, in response to an increase in the stripper fouling indicator, increasing a reactor temperature.

### Claim 18 (depends on 1)

The process of claim 1, wherein the stripper comprises a plurality of sheds extending into a downward flow path within the reactor and the controlling of the reactor mitigates fouling of the sheds of the stripper.

### Claim 19 (depends on 1)

The process of claim 1, wherein the controlling of the reactor comprises:
monitoring a plurality of coking operation variables; and
displaying the coking operation variables, including the stripper fouling indicator, on a dashboard for an operator.

### Claim 20

A coking system for subjecting bitumen to a fluid coking operation, comprising:
a reactor comprising:
a bitumen feed assembly for feeding the bitumen into a reactor;
a particle inlet coupled to a side of the reactor and a particle outlet coupled to a bottom of the reactor, wherein the particle inlet, the particle outlet and the reactor are configured for circulating coke particles through the reactor to contact the bitumen and cause cracking to produce hydrocarbon products;
an upper outlet for removing the hydrocarbon products from the reactor; and
a stripper located in a lower region of the reactor;
a burner in fluid communication with the particle outlet for receiving and heating the coke particles, and in fluid communication with the particle inlet for providing heated coke particles back into the reactor;
a monitoring system operationally coupled to the reactor for the monitoring of process parameters of the fluid coking operation; and
a control unit operationally coupled to the monitoring system for receiving data therefrom and operationally coupled to the reactor for controlling and/or monitoring operation thereof based at least in part on a stripper fouling indicator of the stripper and on the monitored process parameters of the reactor.
