# US 2025/0042105 A1 · Methods and systems for fabrication of layup for composite part

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0042105 A1
- Document ID: US20250042105A1
- Status: Published application
- Kind: A1
- Application number: 18/452,179
- Filed: 2023-08-18
- Published: 2025-02-06
- Earliest claimed: 2023-07-31
- Assignees: The Boeing Company
- Applicants: The Boeing Company
- Inventors: Sayata Ghose; Marcus A. Belcher
- Web page: https://patentgrep.com/patent/US20250042105A1

## CPC

- B29C 70/384: {Fiber placement heads, e.g. component parts, details or accessories}
- B29C 70/545: {Perforating, cutting or machining during or after moulding}
- B29C 59/14: by plasma treatment {(plasma tubes per se H01J)}
- B29C 70/30: Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
- B29C 70/38: Automated lay-up, e.g. using robots, laying filaments according to predetermined patterns {(application heads for tyres B29D30/28)}
- B29C 70/54: Component parts, details or accessories; Auxiliary operations {, e.g. feeding or storage of prepregs or SMC after impregnation or during ageing}
- B29C 70/543: {Fixing the position or configuration of fibrous reinforcements before or during moulding (for non-woven fabrics D04H3/08)}
- B29C 2059/145: {Atmospheric plasma}
- G01N 2021/8472: {Investigation of composite materials}
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)

## Abstract

A method to fabricate a composite part includes identifying an out-of-tolerance inconsistency in a current ply of the layup for the composite part and depositing a replacement tow onto the substrate to rework the out-of-tolerance inconsistency in the current ply for the layup of the composite part. In another example, the method includes depositing tows onto a substrate using a multi-lane automated fiber placement device to form a first ply; after out-of-tolerance inconsistencies in the first ply are identified, depositing replacement tows to rework the out-of-tolerance inconsistencies using a single-lane automated fiber placement device; and depositing additional tows onto the substrate using the multi-lane automated fiber placement device to form a second ply overlaying the first ply. A system for fabricating a layup for a composite part includes the multi-lane automated fiber placement device and the single-lane automated fiber placement device.

## Claims

### Claim 1

A method for fabrication of a layup for a composite part, the method comprising:
identifying an out-of-tolerance inconsistency in a current ply of the layup for the composite part, the current ply comprising a plurality of tows overlaying a substrate; and
depositing a replacement tow onto the substrate to rework the out-of-tolerance inconsistency in the current ply for the layup of the composite part.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
depositing at least one course of multiple tows for the current ply of the layup onto the substrate using a multi-lane automated fiber placement device;
after the identifying the out-of-tolerance inconsistency, removing the multi-lane automated fiber placement device from the layup;
providing a single-lane automated fiber placement device to the layup;
performing the depositing to the layup using the a single-lane automated fiber placement device;
removing the single-lane automated fiber placement device from the layup;
providing the multi-lane automated fiber placement device to the layup; and
resuming the depositing of courses of multiple tows for the current ply and/or subsequent plies of the layup.

### Claim 3 (depends on 1)

The method of claim 1 wherein the identifying of the out-of-tolerance inconsistency is performed using at least one imaging sensor.

### Claim at position 4

4-13. (canceled)

### Claim 14 (depends on 1)

The method of claim 1, further comprising:
determining the out-of-tolerance inconsistency requires the rework.

### Claim 15

(canceled)

### Claim 16 (depends on 14)

The method of claim 14, the determining comprising:
comparing the out-of-tolerance inconsistency to tow standards for the layup of the composite part in relation to acceptable tolerances for the tow standards; and
determining the replacement tow is required to rework the out-of-tolerance inconsistency where the out-of-tolerance inconsistency is not within the acceptable tolerances of the tow standards.

### Claim 17

(canceled)

### Claim 18 (depends on 1)

The method of claim 1 wherein the depositing of the replacement tow is performed using a single-lane automated fiber placement device.

### Claim 19 (depends on 1)

The method of claim 1, further comprising:
removing at least one portion of one or more tows of the plurality of tows in the current ply to prepare for the rework of the out-of-tolerance inconsistency, the at least one portion of the one or more tows being proximate to the out-of-tolerance inconsistency.

### Claim 20 (depends on 19)

The method of claim 19 wherein the replacement tow is deposited onto the substrate to replace the at least one portion of the one or more tows removed from the current ply.

### Claim 21

(canceled)

### Claim 22 (depends on 19)

The method of claim 19, the depositing of the replacement tow comprising:
overlapping the replacement tow onto one or more retained portions of the one or more tows from which the at least one portion was removed.

### Claim 23 (depends on 19)

The method of claim 19, the depositing of the replacement tow comprising:
splicing the replacement tow with one or more retained portions of the one or more tows from which the at least one portion was removed.

### Claim 24 (depends on 1)

The method of claim 1, the depositing of the replacement tow comprising:
compacting the replacement tow on the substrate to define a nip.

### Claim 25

(canceled)

### Claim 26 (depends on 24)

The method of claim 24, the depositing of the replacement tow further comprising:
projecting an atmospheric pressure plasma flume proximate the nip to heat at least one of the replacement tow and the substrate.

### Claim 27 (depends on 26)

The method of claim 26 wherein the projecting of the atmospheric pressure plasma flume comprises projecting the atmospheric pressure plasma flume at an emanation angle ranging from at least one of about 0 degrees to about 20 degrees, about 0 degrees to about 10 degrees and about 0 degrees to about 5 degrees.

### Claim 28 (depends on 26)

The method of claim 26 wherein the projecting of the atmospheric pressure plasma flume comprises projecting the atmospheric pressure plasma flume at a pressure ranging from about 15 psi to about 50 psi.

### Claim 29 (depends on 26)

The method of claim 26 wherein the atmospheric pressure plasma flume has a width ranging from at least one of about 0.10 inches to about 0.40 inches, about 0.15 inches to about 0.35 inches and about 0.20 inches to about 0.30 inches.

### Claim 30 (depends on 26)

The method of claim 26 wherein the atmospheric pressure plasma flume has a length ranging from at least one of about 0.25 inches to about 1.5 inches, about 0.5 inches to about 1.0 inches and about 0.70 inches to about 0.80 inches.

### Claim 31 (depends on 26)

The method of claim 26 wherein the atmospheric pressure plasma flume is about 0.5 inches to about 0.8 inches from the nip.

### Claim 32

(canceled)

### Claim 33 (depends on 1)

The method of claim 1 wherein the out-of-tolerance inconsistency in the layup of the composite part is due to a segment missing from one or more tows, the depositing of the replacement tow comprising:
compacting the replacement tow on the substrate to define a nip;
projecting an atmospheric pressure plasma flume proximate the nip to heat at least one of the replacement tow and the substrate; and
cutting the replacement tow to a desired length in conjunction with the projecting of the atmospheric pressure plasma flume.

### Claim 34

A method for fabricating a layup for a composite part, the method comprising:
depositing a first plurality of tows onto a substrate using a multi-lane automated fiber placement device to form a first ply overlaying the substrate in conjunction with fabrication of the layup for the composite part;
after one or more out-of-tolerance inconsistencies in the first ply are identified and designated for rework, depositing one or more replacement tows onto the substrate to rework the one or more out-of-tolerance inconsistencies in the first ply using a single-lane automated fiber placement device; and
depositing a second plurality of tows onto the substrate using the multi-lane automated fiber placement device to form a second ply overlaying the first ply in conjunction with fabrication of the layup for the composite part.

### Claim at position 26

35-54. (canceled)

### Claim 55

A system for fabricating a layup for a composite part, the system comprising:
a multi-lane automated fiber placement device configured to deposit a first plurality of tows onto a substrate to form a first ply overlaying the substrate in conjunction with fabrication of the layup for the composite part; and
a single-lane automated fiber placement device configured to deposit one or more replacement tows onto the substrate to rework one or more out-of-tolerance inconsistencies in the first ply, the one or more out-of-tolerance inconsistencies having been previously identified and designated for rework;
wherein, after the rework of the one or more out-of-tolerance inconsistencies, the multi-lane automated fiber placement device is configured to deposit a second plurality of tows onto the substrate to form a second ply overlaying the first ply in conjunction with fabrication of the layup for the composite part.

### Claim at position 28

56-75. (canceled)
