# US 2025/0031335 A1 · Automated Point Mapping Generation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0031335 A1
- Document ID: US20250031335A1
- Status: Published application
- Kind: A1
- Application number: 18/907,008
- Filed: 2024-10-04
- Published: 2025-01-23
- Earliest claimed: 2020-08-26
- Assignees: PassiveLogic, Inc.
- Inventors: Troy Aaron Harvey; Jeremy David Fillingim
- Web page: https://patentgrep.com/patent/US20250031335A1

## CPC

- H05K 7/1465: {Modular PLC assemblies with separable functional units}
- F24F 11/32: Responding to malfunctions or emergencies
- F24F 11/49: ensuring correct operation, e.g. by trial operation or configuration checks
- F24F 11/63: Electronic processing
- F24F 11/88: Electrical aspects, e.g. circuits
- G01R 31/55: Testing for incorrect line connections
- G05B 13/0265: {the criterion being a learning criterion}
- G05B 15/02: electric
- G05B 19/048: Monitoring; Safety
- G05B 23/0216: {Human interface functionality, e.g. monitoring system providing help to the user in the selection of tests or in its configuration}
- G05B 23/0264: {Control of logging system, e.g. decision on which data to store; time-stamping measurements}
- G05B 23/0272: {Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user}
- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- G06F 1/3246: by software initiated power-off
- G06F 3/04186: {Touch location disambiguation}
- G06F 3/0482: Interaction with lists of selectable items, e.g. menus
- G06F 3/04847: Interaction techniques to control parameter settings, e.g. interaction with sliders or dials
- G06F 3/147: using display panels
- G06F 8/436: {Semantic checking}
- G06F 8/51: Source to source
- G06F 8/53: Decompilation; Disassembly
- G06F 8/74: Reverse engineering; Extracting design information from source code
- G06F 9/4418: {Suspend and resume; Hibernate and awake}
- G06F 30/12: characterised by design entry means specially adapted for CAD, e.g. graphical user interfaces [GUI] specially adapted for CAD
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06F 30/18: Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling (circuit design at the physical level G06F30/39; network planning tools for wireless communication networks H04W16/18)
- G06Q 30/0283: Price estimation or determination
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 13/182: the equipment comprising loads connected to the power network
- H04B 3/46: Monitoring; Testing
- H04L 43/50: Testing arrangements
- H04L 67/12: specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04L 67/125: involving control of end-device applications over a network
- H04L 67/75: Indicating network or usage conditions on the user display
- H04M 3/305: {testing of physical copper line parameters, e.g. capacitance or resistance (locating faults in cables G01R31/08)}
- H04W 4/80: Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication
- H04W 84/00: Network topologies
- H05K 7/1468: {Mechanical features of input/output (I/O) modules}
- H05K 7/1477: {including backplanes}
- H05K 7/1481: {User interface, e.g. status displays; Programming interface, e.g. connector for computer programming; Monitoring}
- G06F 30/392: Floor-planning or layout, e.g. partitioning or placement
- G06F 2111/04: Constraint-based CAD
- G06F 2111/16: Customisation or personalisation
- G06F 2113/04: Power grid distribution networks
- G06F 2113/16: Cables, cable trees or wire harnesses
- G06F 2115/12: Printed circuit boards [PCB] or multi-chip modules [MCM]
- H02J 2105/12: supplying households or buildings
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H04B: TRANSMISSION
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04M: TELEPHONIC COMMUNICATION (circuits for controlling other apparatus via a telephone cable and not involving telephone switching apparatus G08)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Tools and techniques are described to automate creation of point mapping diagrams between controllers and controlled resources. After receiving a defined space diagram (which may be input using a graphical interface of the controller, or by other means), resource locations and resource wiring requirements (which may be done automatically), a wiring diagram including point mapping between the resources and any necessary controllers is generated. If resources need to be moved, a new wiring diagram and/or point mapping can be regenerated.

## Claims

### Claim 1

A computer-implemented method comprising:
accepting a defined space representation into a controller based on a user instruction, the controller comprising a processor, a memory, and a user interface;
accepting a unit model from a list of predefined models displayed on the user interface based on the user instruction, the unit model having wiring requirements and location within the defined space representation;
accepting a constraint based on the user instruction;
generating, using the processor, the memory, the defined space representation and the constraint, a placement of the controller;
generating a wiring route between the controller and the unit model based at least in part on the defined space representation;
generating a point mapping between the controller and the unit model based in part on the wiring route using the processor and the memory; and
modifying a control wiring terminal associated with the controller based on the wiring requirements of the unit module.

### Claim 2 (depends on 1)

The method of claim 1, further comprising displaying the point mapping on the user interface.

### Claim 3 (depends on 1)

The method of claim 1, wherein the unit model comprises a labeled unit attribute, and wherein the labeled unit attribute is capable of being displayed on the user interface.

### Claim 4 (depends on 1)

The method of claim 1, further comprising using the processor and memory to generate a number of controllers needed based at least partially on the constraint.

### Claim 5 (depends on 1)

The method of claim 1, wherein the constraint comprises minimizing labor, minimizing hardware, maximizing labor, maximizing hardware, or specifying fill rate of hardware.

### Claim 6 (depends on 1)

The method of claim 1, further comprising a second controller and wherein the user interface is configured to allow a user to input a request to move the unit model to the second controller, and wherein the request rebuilds the wiring route and the point mapping.

### Claim 7 (depends on 1)

The method of claim 1, wherein the controller further comprises a wiring module with a terminal wiring requirement, the controller operationally able to allow a user to modify the terminal wiring requirement of the wiring module, producing a modified wiring requirement, and upon such action the controller is operationally able to check the modified wiring requirement to determine match between the modified wiring requirement and a wiring requirements of a resource to be connected to a terminal associated with the wiring module.

### Claim 8

A system which generates point mapping, the system comprising: a controller with a processor, and a memory in operable communication with the processor; including instructions residing in the memory, which are executable by the processor to perform a method which includes:
accepting a defined space representation into the memory based on a user instruction;
accepting a unit model from a list of predefined models displayed on a user interface based on the user instruction, the unit model having wiring requirements and location within the defined space representation;
based on a user instruction indicated through the user interface, accepting a constraint;
generating, using the processor, the memory, the defined space representation and the constraint, a placement of the controller;
generating a wiring route between the controller and the unit model based at least in part on the defined space representation;
generating a point mapping between the controller and the unit model based in part on the wiring route, using the processor and the memory; and
modifying a control wiring terminal associated with the controller based on the wiring requirements of the unit module.

### Claim 9 (depends on 8)

The system of claim 8, wherein the controller further comprises a wiring module with a terminal wiring requirement, the controller allowing a user to modify the terminal wiring requirement of the wiring module, producing a modified wiring requirement.

### Claim 10 (depends on 8)

The system of claim 8, wherein the controller further comprises a wiring module with a terminal wiring requirement, the controller allowing a user to modify the terminal wiring requirement of the wiring module, producing a modified wiring requirement.

### Claim 11 (depends on 10)

The system of claim 10, further comprising the controller determining a match between the modified wiring requirement and a wiring requirement of a resource to be connected to a terminal associated with the wiring module.

### Claim 12 (depends on 8)

The system of claim 8, further comprising a program residing in memory that modifies a controller terminal on the controller based on a second user instruction.

### Claim 13 (depends on 12)

The system of claim 12, further comprising a second controller and wherein the user interface is configured to allow a user to input a request to move the unit model to the second controller, and wherein the controller or the second controller rebuilds the wiring route and the point mapping.

### Claim 14 (depends on 13)

The system of claim 13, further comprising calculating a placement of the second controller within the defined space representation is based at least partially on the constraint.

### Claim 15 (depends on 8)

The system of claim 8, further comprising modifying wiring terminals based on a user request.

### Claim 16 (depends on 8)

The system of claim 8, further comprising the controller sending a signal to a module associated with the controller; the module modifying its hardware to match requirements of the user instruction.

### Claim 17 (depends on 16)

The system of claim 16, wherein the user instruction comprises input indicating a user moving a unit module to a new location within the module.

### Claim 18 (depends on 17)

The system of claim 17, wherein the user instruction comprises input indicating a user inputting information into a user interface screen on the controller.

### Claim 19

A non-transient storage medium configured with code which upon execution by a controller having one or more processors coupled with memory-stored instructions performs a point mapping generation method, the method comprising:
instructions for accepting a defined space representation into a controller based on a user instruction, the controller comprising a processor, a memory, and a user interface;
instructions for accepting a unit model from a list of predefined models displayed on the user interface based on the user instruction, the unit model having wiring requirements and location within the defined space representation;
instructions for accepting a constraint;
instructions for generating, using the processor, the memory, the defined space representation and the constraint, a placement of the controller;
instructions for generating a wiring route between the controller and the unit model based at least in part on the defined space representation;
instructions for generating a point mapping between the controller and the unit model based in part on the wiring route, using the processor and the memory; and
instructions for modifying a control wiring terminal associated with the controller based on the wiring requirements of the unit module.

### Claim 20 (depends on 18)

The non-transient storage medium of claim 18, further comprising the controller, using its processor and memory, modifying a control point terminal on the controller to match at least a portion of requirements of the point mapping.