# US 2025/0031077 A1 · Measurement configuration for active trp measurement sets

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0031077 A1
- Document ID: US20250031077A1
- Status: Published application
- Kind: A1
- Application number: 18/708,085
- Filed: 2021-11-09
- Published: 2025-01-23
- Earliest claimed: 2021-11-09
- Assignees: Telefonaktiebolaget LM Ericsson (publ)
- Applicants: Telefonaktiebolaget LM Ericsson (publ)
- Inventors: Walter MÜLLER
- Web page: https://patentgrep.com/patent/US20250031077A1

## CPC

- H04W 24/10: Scheduling measurement reports {; Arrangements for measurement reports}
- H04W 48/20: Selecting an access point
- H04W 36/0085: {Hand-off measurements}
- H04W 52/14: Separate analysis of uplink or downlink
- H04W 88/06: adapted for operation in multiple networks {or having at least two operational modes}, e.g. multi-mode terminals
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

There is provided mechanisms for configuring a user equipment with measurement configuration of active TRP measurement sets. A method is performed by a network node. The method includes providing the measurement configuration to the user equipment relating to at least a first active TRP measurement set and a second active TRP measurement set for the user equipment to at the same time support at least two active TRP measurement sets. The method includes receiving measurement reporting from the user equipment for at least one TRP included in the first active TRP measurement set and for at least one TRP included in the second active TRP measurement set.

## Claims

### Claim 1

A method for configuring a user equipment with measurement configuration of active measurement sets of transmission and reception points, TRPs, the method being performed by a network node, the method comprising:
providing the measurement configuration to the user equipment relating to at least a first active TRP measurement set and a second active TRP measurement set for the user equipment to at the same time support at least two active TRP measurement sets;
receiving measurement reporting from the user equipment for at least one TRP included in the first active TRP measurement set and for at least one TRP included in the second active TRP measurement set;
according to the measurement configuration the user equipment is further configured by the network node to evaluate performance of the first active TRP measurement set and of the second active TRP measurement set according to at least one of:
mutually different measurement quantities; and
identical measurement quantities but with an offset between uplink performance and downlink performance; and
the first active TRP measurement set being for evaluating downlink performance and the second active TRP measurement set being for evaluating uplink performance.

### Claim at position 2

-4. (canceled)

### Claim 5 (depends on 1)

The method according to claim 1, wherein, according to the measurement configuration, the user equipment further is configured by the network node to evaluate the uplink performance according to a path metric, the path metric being path gain or pathloss, or according to a power metric, the power metric being reference signal received power.

### Claim 6

(canceled)

### Claim 7 (depends on 1)

The method according to claim 1, wherein the user equipment further is configured by the network node to only provide the measurement reporting when one or both the first active TRP measurement set fulfils a first measurement report triggering condition and the second active TRP measurement set fulfils a second configured measurement report triggering condition, wherein the first measurement report triggering condition and the second measurement report triggering condition are selected from a set of events, and wherein, according to the measurement configuration, the event of the first measurement report triggering condition is different from the event of the second measurement report triggering condition.

### Claim 8 (depends on 1)

The method according to claim 1, wherein, according to the measurement configuration, the user equipment is allowed to maintain at least two different TRP sets for evaluating downlink performance, wherein the downlink performance for said at least two different TRP sets is to be evaluated according to any of: mutually different measurement quantities, mutually different frequency bands, mutually different downlink triggering conditions.

### Claim 9 (depends on 1)

The method according to claim 1, wherein the method further comprises:
updating which at least one TRP to be included in the first active TRP measurement set and which at least one TRP to be included in the second active TRP measurement set; and
signalling updating information to the user equipment identifying which at least one TRP to be included in the first active TRP measurement set and which at least one TRP to be included in the second active TRP measurement set.

### Claim at position 8

-11. (canceled)

### Claim 12

A method for being configured by a network node with measurement configuration of active sets of transmission and reception points, TRPs, the method being performed by a user equipment, the method comprising:
obtaining the measurement configuration from the network node relating to at least a first active TRP measurement set and a second active TRP measurement set for the user equipment to at the same time support at least two active TRP measurement sets sets;
evaluating performance for the first active TRP measurement set and performance for the second active TRP measurement set;
providing measurement reporting towards the network node of the performance for at least one TRP included in the first active TRP measurement set and the performance for at least one TRP included in the second active TRP measurement set;
according to the measurement configuration, the user equipment further is configured by the network node to evaluate the performance of the first active TRP measurement set and of the second active TRP measurement set according to at least one of:
mutually different measurement quantities; and
identical measurement quantities but with an offset between uplink performance and downlink performance; and
the first active TRP measurement set being for evaluating downlink performance and the second active TRP measurement set being for evaluating uplink performance.

### Claim at position 10

-15. (canceled)

### Claim 16 (depends on 12)

The method according to claim 12, wherein, according to the measurement configuration, the user equipment further is configured by the network node to evaluate the uplink performance according to a path metric, the path metric being path gain or pathloss, or according to a power metric, the power metric being a reference signal received power.

### Claim 17

(canceled)

### Claim 18 (depends on 12)

The method according to claim 12, wherein the method further comprises:
verifying that one or both the first active TRP measurement set fulfils a first measurement report triggering condition and the second active TRP measurement set fulfils a second measurement report triggering condition before providing the measurement reporting,
wherein the first measurement report triggering condition and the second measurement report triggering condition are selected from a set of events, and wherein, according to the measurement configuration, the event of the first measurement report triggering condition is different from the event of the second measurement report triggering condition.

### Claim 19 (depends on 12)

The method according to claim 12, wherein, according to the measurement configuration, the user equipment is allowed to maintain at least two different TRP sets for evaluating downlink performance, wherein the downlink performance for said at least two different TRP sets is to be evaluated according to any of: mutually different measurement quantities, mutually different frequency bands, mutually different downlink triggering conditions.

### Claim 20 (depends on 12)

The method according to claim 12, wherein the method further comprises:
obtaining updating information from the network node identifying which at least one TRP to be included in the first active TRP measurement set and which at least one TRP to be included in the second active TRP measurement set.

### Claim 21

(canceled)

### Claim 22

A network node for configuring a user equipment with measurement configuration of active sets of transmission and reception points, TRPs, the network node comprising processing circuitry, the processing circuitry being configured to cause the network node to:
provide the measurement configuration to the user equipment relating to at least a first active TRP measurement set and a second active TRP measurement set for the user equipment to at the same time support at least two active TRP measurement sets;
receive measurement reporting from the user equipment for at least one TRP included in the first active TRP measurement set and for at least one TRP included in the second active TRP measurement set;
according to the measurement configuration, the user equipment is further configured by the network node to evaluate performance of the first active TRP measurement set and of the second active TRP measurement set according to at least one of:
mutually different measurement quantities; and
identical measurement quantities but with an offset between uplink performance and downlink performance; and
the first active TRP measurement set being for evaluating downlink performance and the second active TRP measurement set being for evaluating uplink performance.

### Claim 23

(canceled)

### Claim 24 (depends on 22)

The network node according to claim 22, wherein, according to the measurement configuration, the network node further configures the user equipment to evaluate the uplink performance according to a path metric, the path metric being path gain or pathloss, or according to a power metric, the power metric being reference signal received power.

### Claim 25

A user equipment for being configured by a network node with measurement configuration for the user equipment to at the same time support at least two active sets of transmission and reception points, TRPs, the user equipment comprising processing circuitry, the processing circuitry being configured to cause the user equipment to:
obtain the measurement configuration from the network node relating to at least a first active TRP measurement set and a second active TRP measurement set for the user equipment to at the same time support at least two active TRP measurement sets;
evaluate performance for the first active TRP measurement set and performance for the second active TRP measurement set;
provide measurement reporting towards the network node of the performance for at least one TRP included in the first active TRP measurement set and the performance for at least one TRP included in the second active TRP measurement set;
according to the measurement configuration, the user equipment further is configured by the network node to evaluate performance of the first active TRP measurement set and of the second active TRP measurement set according to at least one of:
mutually different measurement quantities; and
identical measurement quantities but with an offset between uplink performance and downlink performance; and
the first active TRP measurement set being for evaluating downlink performance and the second active TRP measurement set being for evaluating uplink performance.

### Claim 26

(canceled)

### Claim 27 (depends on 25)

The user equipment according to claim 25, wherein, according to the measurement configuration, the user equipment is configured by the network node to evaluate the uplink performance according to a path metric, the path metric being path gain or pathloss, or according to a power metric, the power metric being a reference signal received power.

### Claim at position 23

-30. (canceled)
