Adsorption tower for controlling a fluid supply route to a plurality of beds and operating control method thereof
AssigneeSK Innovation Co., Ltd.
InventorsJae Jeong KIM, Chan Saem PARK, Sun Hyuk BAE
Life of this patent
Estimating the term…
Loading patent…
AssigneeSK Innovation Co., Ltd.
InventorsJae Jeong KIM, Chan Saem PARK, Sun Hyuk BAE
Estimating the term…
An adsorption tower according to embodiments of the present disclosure comprises the plurality of beds, an inlet port, an outlet port, at least one sensor unit for each of the plurality of beds, a plurality of connection pipes which connect at least two of the inlet port, the outlet port and the plurality of beds, a plurality of valves connected to the plurality of connection pipes, a memory configured to store one or more instructions, and a processor configured to execute the one or more instructions stored in the memory. The processor is configured to determine a fluid supply order to the plurality of beds according to adsorption values in the plurality of beds measured by the sensor units, and control the fluid supply route by opening and closing the valves according to the determined fluid supply order.
An adsorption tower for controlling a fluid supply route to a plurality of beds, the adsorption tower comprising:
An operating control method of an adsorption tower for controlling a fluid supply route to a plurality of beds, which is executed by a computing device including a memory configured to store one or more instructions, and a processor configured to execute the one or more instructions stored in the memory, the method comprising:
An adsorption tower for removing ammonia from a gas feed, the adsorption tower comprising:
Dependencies are inferred from the claim text.