# US 2025/0010961 A1 · Installation for the load-out into the water of a heavy load

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0010961 A1
- Document ID: US20250010961A1
- Status: Published application
- Kind: A1
- Application number: 18/710,611
- Filed: 2022-11-10
- Published: 2025-01-09
- Earliest claimed: 2021-11-17
- Assignees: Soletanche Freyssinet
- Applicants: Soletanche Freyssinet; Roll Holding B.V
- Inventors: Benoit MELEN; Roel WESEL
- Web page: https://patentgrep.com/patent/US20250010961A1

## CPC

- B63B 75/00: Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
- B63B 35/44: Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)}
- B63B 73/30: Moving or transporting modules or hull blocks to assembly sites, e.g. by rolling, lifting or floating
- F03D 13/256: {on a floating support, i.e. floating wind motors}
- B63B 2035/446: {for converting wind energy into electric energy}
- F03D 13/10: Assembly of wind motors; Arrangements for erecting wind motors
- F03D 13/25: specially adapted for offshore installation
- F05B 2240/93: on a structure floating on a liquid surface
- Y02E 10/727: Offshore wind turbines
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

An installation for the load-out into the water of a heavy load located onshore, in particular a load constituted by a tripod- or tetrapod-type float. The installation has at least two support structures that are independent of one another and can be moved on the respective paths, each of which being equipped with lifting means configured to be hooked to the load, each of these support structures being equipped with a counterweight. The installation is configured to allow the lifting means of the support structures, when the load is positioned in the load-out area, to extend at least partially above the water in order to lower the load into it.

## Claims

### Claim 1

An installation for the load-out into water of a heavy load located onshore, said installation comprising:
at least two support structures that are independent of one another, each of which being equipped with lifting means configured to be hooked to the load, each of these support structures being equipped with a counterweight,
wherein the installation is configured to allow the lifting means of the support structures, when the load is positioned in a load-out area, to extend at least partially above the water in order to lower the load into said lifting means.

### Claim 2 (depends on 1)

The installation according to claim 1, having at least one offshore support structure borne by a barge, provided with the lifting means configured to be attached to the load.

### Claim 3 (depends on 2)

The installation according to claim 2, the barge being movable so as to accompany the movement of the load toward a load-out position.

### Claim 4 (depends on 3)

The installation according to claim 3, the barge having an adjustable ballast or a counterweight system making it possible to keep the support structure located above horizontal.

### Claim 5 (depends on 3)

The installation according to claim 3, the barge being connected to the dock or support structures by mooring lines which are arranged so as to be gradually unspooled as the load moves away from the dock.

### Claim 6 (depends on 1)

The installation according to claim 1, having a submersible barge on which part of the load can rest when the load is in the load-out area.

### Claim 7 (depends on 6)

The installation according to claim 6, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the submersible barge being positioned in the continuation of one of the movement paths of the dock, and having an extension to this path making it possible to move the load onto the barge.

### Claim 8 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the support structures being oriented parallel to the movement paths.

### Claim 9 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the installation having at least three support structures each of which being equipped with lifting means and a counterweight, the movement paths being arranged such that, in the load-out area, all the lifting means of the support structures are located at least partially above the water in order to lower the load into it.

### Claim 10 (depends on 9)

The installation according to claim 9, the support structures being oriented transversely with respect to the movement paths.

### Claim 11 (depends on 9)

The installation according to claim 9, having two platforms or other structure on piles along which extend the movement paths, the load-out area extending between these platforms or other structure.

### Claim 12 (depends on 9)

The installation according to claim 9, the support structures being movable along their longitudinal axis relative to the movement paths, so as to enable them to be moved away from the load once it has been loaded out.

### Claim 13 (depends on 1)

The installation according to claim 1, the support structures extending horizontally overall.

### Claim 14 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the movement paths having rails.

### Claim 15 (depends on 1)

The installation according to claim 1, the support structures having shoes made of synthetic material that are able to bear against the load.

### Claim 16 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the movement paths being at least three.

### Claim 17 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the movement paths being all parallel to each other or having different directions or being parallel for part thereof and having different directions for other parts.

### Claim 18 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, the movement paths being all defined by rails or at least partially defined by rails.

### Claim 19 (depends on 1)

The installation according to claim 1, the installation comprising movement paths extending from an onshore area for receiving the load to an area for the load out of the load, at least some part of the movement paths or some movement paths being defined by a concrete surface or by tracks or routes on which wheel transporters such as SPMTs can run.

### Claim 20 (depends on 1)

The installation according to claim 1, comprising three movement paths that extend generally parallel to each other and that are defined by rails, the movement paths extending to an end of the dock next to the water, the load being a tripod having feet each carried by a transporter running on a corresponding movement path, before connection of the load with the lifting means of the support structures, one of the support structures being carried by a barge, and the other two being connected to the load once the latter has advanced past a predefined area, the installation comprising additional movement paths enabling each of the two support structures to move from a first place where it is distant from a movement path on which the load runs to a second place where it lies on this movement path behind the load, the additional movement paths being defined by rails, that are perpendicular to the rails of the movement paths on which the load runs.

### Claim 21 (depends on 1)

The installation according to claim 1, comprising movement paths on which the support structures run, these movement paths being defined by rails on which the support structures run, the orientation of the support structures being transverse to these movement paths, there being two support structures running on one movement path and one on the other movement path, the installation comprising two piers on which the movement paths extend, the load being hoisted down to the water between the piers by one support structure lying on one pier and the two others on the other pier, the load being a tripod having two feet that run along a same movement path and an opposite foot that runs of the other movement path.

### Claim 22 (depends on 1)

The installation according to claim 1; comprising two movement paths that run parallel to each other, generally perpendicular to the dock, and at least one extra movement path that run generally perpendicularly to the other two, the first two movement paths being equipped with rails, the at least one extra path being a concrete surface on which wheel transporters such as SPMTs can run, from a first place where the assembling of the load has been completed to a second place where the load can be hoisted by the support structures for the load out into the water, the installation comprising a barge carrying a third support structure.

### Claim 23 (depends on 1)

The installation according to claim 1, at least one support structure comprising a rotatable crane that can rotate during transportation of the load from onshore to offshore.

### Claim 24 (depends on 1)

The installation according to claim 1, wherein at least one support structure comprising a rotatable crane that can rotate during transportation of the load from onshore to offshore, and further comprising at least one support structure that has a rotatable crane that can rotate during transportation of the load from onshore to offshore, and a barge carrying another support structure.

### Claim 25 (depends on 1)

The installation according to claim 1, at least one support structure, comprising at least one first blocking element configured to interfere with at least one second blocking element carried by the load to limit lateral displacement of the load relative to the support structure once the load has been lifted to a top position by the lifting means.

### Claim 26 (depends on 1)

A method for the load out into the water of a heavy load using an installation according to claim 1, in which:
the lifting means are acted upon to lower the load into the water, the load being held while it is lowered at least at three points, at least two of which are connected to lifting means of the support structures located onshore, and the third is connected to one from among a submersible barge, a support structure borne by a barge, and a support structure located onshore.

### Claim 27 (depends on 26)

The method of claim 26, comprising the use of wheel transporters such as SPMTs to transport the load from an assembly area to the zone where it can be connected to the lifting means of the support structures.

### Claim 28 (depends on 26)

The method of claim 26, said third point being connected to a support structure present on a barge, the method comprising acting on a ballast of the barge to compensate for a variation of the force exerted by the load on the lifting means of the support structure present on the barge.

### Claim 29 (depends on 26)

The method of claim 26, the load being moved using the support structures located onshore as far as the load-out area.