# US 2025/0003170 A1 · Construction method for removing mud in jacket steel pipe pile

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0003170 A1
- Document ID: US20250003170A1
- Status: Published application
- Kind: A1
- Application number: 18/729,184
- Filed: 2023-04-20
- Published: 2025-01-02
- Earliest claimed: 2022-04-25
- Assignees: Cccc Shanghai Harbour Engineering Design & Research Institute Co., Ltd.; Cccc Harbour (Shanghai) Science & Technology Co., Ltd.; Cccc Shanghai Third Harbour Engineering Science & Technology Research Institute Co., Ltd.; Cccc Third Harbor Engineering Co., Ltd.
- Applicants: Cccc Shanghai Harbour Engineering Design & Research Institute Co., Ltd.; Cccc Harbour (Shanghai) Science & Technology Co., Ltd.; Cccc Shanghai Third Harbour Engineering Science & Technology Research Institute Co., Ltd.; Cccc Third Harbor Engineering Co., Ltd.
- Inventors: Dongdong WANG; Hui LIU; Dapeng WANG; Haibing WU; Dongliang LV; Xuan SUN; Heng ZHANG
- Web page: https://patentgrep.com/patent/US20250003170A1

## CPC

- E02D 13/08: Removing obstacles
- E02B 17/02: placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02D 7/00: Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds (for both placing and removing E02D11/00; {accessories for coupling driver to piles or the like E02D13/10; for trees or other plants A01G17/16; placing posts E04H17/26})
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)

## Abstract

A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.

## Claims

### Claim 1

A construction method for removing a mud in a jacket steel pipe pile, comprising:
erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking;
measuring an elevation of a mud surface in an underwater steel pipe pile, and calculating a height from the mud surface in the underwater steel pipe pile to a pile top and a needed mud removing depth according to a measurement result; wherein the needed mud removing depth H=an elevation H1 of the mud surface in the underwater steel pipe pile-an elevation H2 of a designed mud surface in the underwater steel pipe pile;
installing a mud removing equipment on the underwater steel pipe pile; and
starting the mud removing equipment to carry out a mud removing operation, and when the needed mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the underwater steel pipe pile; and when the mud removing operation does not reach a related elevation, repeating the mud removing operation till the mud removing operation reaches a standard;
wherein the mud removing equipment comprises a transmission main shaft, a mud suction mechanism, a pile head support, a driving assembly, and a drill bit assembly; the transmission main shaft is arranged inside the underwater steel pipe pile, and the transmission main shaft is of a hollow structure; the mud suction mechanism is installed at a top portion of the transmission main shaft; a center of the pile head support is rotationally connected with the transmission main shaft, and an outer side of the pile head support is installed at an end portion of the underwater steel pipe pile; the drill bit assembly is installed at a bottom portion of the transmission main shaft, and the drill bit assembly comprises a mud barrel, an inner mud cutting turbine, and an outer mud cutting turbine; the inner mud cutting turbine is detachably connected with the transmission main shaft, the outer mud cutting turbine is arranged on an outer side of the inner mud cutting turbine, and the mud barrel is arranged between the inner mud cutting turbine and the outer mud cutting turbine;
the driving assembly is further provided with a torque sensor, and a completed mud removing depth is obtained based on a numerical value of the torque sensor and in combination with a mud removing depth measured by a construction; and
the underwater steel pipe pile is further provided a climbing device, wherein the climbing device comprises a climbing rack, a climbing gear, a climbing transmission motor, and a climbing support; the climbing gear is installed on the transmission main shaft through the climbing support, the climbing gear is further engaged with the climbing rack, and the climbing gear is further installed at a driving end of the climbing transmission motor; and the climbing rack is longitudinally installed on the underwater steel pipe pile.

### Claim 2 (depends on 1)

The construction method for removing the mud in the jacket steel pipe pile according to claim 1, wherein the step of installing the mud removing equipment on the underwater steel pipe pile comprises:
connecting an air compressor connector on a platform or a construction deck with an adapter of the mud removing equipment;
and/or, clamping the mud removing equipment to a top portion of the underwater steel pipe pile;
and/or, adjusting the climbing device in the mud removing equipment and adjusting a length of the transmission main shaft, controlling a pile entering depth of the drill bit assembly, and starting a height adjusting hydraulic device to fix the transmission main shaft and then unhooking the transmission main shaft.

### Claim 3 (depends on 1)

The construction method for removing the mud in the jacket steel pipe pile according to claim 1, wherein the step of installing the mud removing equipment on the underwater steel pipe pile comprises: starting the driving assembly, and under a driving effect of the driving assembly, adjusting a rotating speed of the transmission main shaft and a rotating speed of the drill bit assembly installed at the bottom portion of the transmission main shaft; and/or, starting a mud suction pump to remove the mud and pumping the mud out of the underwater steel pipe pile.

### Claim 4 (depends on 3)

The construction method for removing the mud in the jacket steel pipe pile according to claim 3, wherein the step of installing the mud removing equipment on the underwater steel pipe pile further comprises: pausing the driving assembly and the mud suction pump, and increasing a pile entering depth of a drill bit by adjusting the climbing device till the needed mud removing depth is reached.

### Claim 5 (depends on 4)

The construction method for removing the mud in the jacket steel pipe pile according to claim 4, wherein when an expected mud removing depth is reached, pausing the driving assembly and the mud suction pump, starting the climbing device, starting an air compressor to inject high-pressure air into the underwater steel pipe pile, performing reciprocating lifting in a mud removing depth interval, and cleaning the inner wall of the underwater steel pipe pile; and
when the expected mud removing depth is not reached, repeating the mud removing operation till the expected mud removing depth is reached, then pausing the driving assembly and the mud suction pump, starting the climbing device, starting the air compressor to inject the high-pressure air into the underwater steel pipe pile, performing the reciprocating lifting in the mud removing depth interval, and cleaning the inner wall of the underwater steel pipe pile.

### Claim 6 (depends on 5)

The construction method for removing the mud in the jacket steel pipe pile according to claim 5, wherein a pipeline between the mud suction pump and the mud removing equipment is a steel pipeline or a steel wire hose, and/or, a pipeline between the air compressor and the mud removing equipment is a rubber hose.

### Claim 7

(canceled)

### Claim 8 (depends on 3)

The construction method for removing the mud in the jacket steel pipe pile according to claim 3, wherein the mud suction pumps are evenly distributed along the transmission main shaft, and the mud suction pumps are in bearing type rotary connection with the transmission main shaft.

### Claim 9

(canceled)

### Claim 10 (depends on 1)

The construction method for removing the mud in the jacket steel pipe pile according to claim 1, wherein the mud removing equipment is installed in a rigid lifting cage; a lower frame of the rigid lifting cage is welded to a lower portion of the pile head support of the mud removing equipment, and the center of the pile head support is rotationally connected to the transmission main shaft through a bearing; and a clamping groove is formed in the lower portion of the pile head support and the clamping groove is connected to the end portion of the underwater steel pipe pile in a clamped mode.

### Claim 11 (depends on 4)

The construction method for removing the mud in the jacket steel pipe pile according to claim 4, wherein the mud suction pumps are evenly distributed along the transmission main shaft, and the mud suction pumps are in bearing type rotary connection with the transmission main shaft.

### Claim 12 (depends on 5)

The construction method for removing the mud in the jacket steel pipe pile according to claim 5, wherein the mud suction pumps are evenly distributed along the transmission main shaft, and the mud suction pumps are in bearing type rotary connection with the transmission main shaft.

### Claim 13 (depends on 6)

The construction method for removing the mud in the jacket steel pipe pile according to claim 6, wherein the mud suction pumps are evenly distributed along the transmission main shaft, and the mud suction pumps are in bearing type rotary connection with the transmission main shaft.

### Claim 14 (depends on 2)

The construction method for removing the mud in the jacket steel pipe pile according to claim 2, wherein the mud removing equipment is installed in a rigid lifting cage; a lower frame of the rigid lifting cage is welded to a lower portion of the pile head support of the mud removing equipment, and the center of the pile head support is rotationally connected to the transmission main shaft through a bearing; and a clamping groove is formed in the lower portion of the pile head support and the clamping groove is connected to the end portion of the underwater steel pipe pile in a clamped mode.

### Claim 15 (depends on 3)

The construction method for removing the mud in the jacket steel pipe pile according to claim 3, wherein the mud removing equipment is installed in a rigid lifting cage; a lower frame of the rigid lifting cage is welded to a lower portion of the pile head support of the mud removing equipment, and the center of the pile head support is rotationally connected to the transmission main shaft through a bearing; and a clamping groove is formed in the lower portion of the pile head support and the clamping groove is connected to the end portion of the underwater steel pipe pile in a clamped mode.

### Claim 16 (depends on 4)

The construction method for removing the mud in the jacket steel pipe pile according to claim 4, wherein the mud removing equipment is installed in a rigid lifting cage; a lower frame of the rigid lifting cage is welded to a lower portion of the pile head support of the mud removing equipment, and the center of the pile head support is rotationally connected to the transmission main shaft through a bearing; and a clamping groove is formed in the lower portion of the pile head support and the clamping groove is connected to the end portion of the underwater steel pipe pile in a clamped mode.

### Claim 17 (depends on 5)

The construction method for removing the mud in the jacket steel pipe pile according to claim 5, wherein the mud removing equipment is installed in a rigid lifting cage; a lower frame of the rigid lifting cage is welded to a lower portion of the pile head support of the mud removing equipment, and the center of the pile head support is rotationally connected to the transmission main shaft through a bearing; and a clamping groove is formed in the lower portion of the pile head support and the clamping groove is connected to the end portion of the underwater steel pipe pile in a clamped mode.

### Claim 18 (depends on 6)

The construction method for removing the mud in the jacket steel pipe pile according to claim 6, wherein the mud removing equipment is installed in a rigid lifting cage; a lower frame of the rigid lifting cage is welded to a lower portion of the pile head support of the mud removing equipment, and the center of the pile head support is rotationally connected to the transmission main shaft through a bearing; and a clamping groove is formed in the lower portion of the pile head support and the clamping groove is connected to the end portion of the underwater steel pipe pile in a clamped mode.